TenderDekho Logo
Active GEM

Government Tender Published for 420KV, 4400PF, 1PH CVT,420KV, 4400PF, 1PH CVT,420KV, 4400PF, 1PH CVT,420KV, 4400PF, 1PH CVT,420KV,

Bid Publish Date

07-Sep-2026, 12:24 pm

Bid End Date

28-Oct-2026, 11:00 am

EMD

₹13,66,000

Generate Docs

Progress

Issue07-Sep-2026, 12:24 pm
Corrigendum21-Oct-2026
AwardPending

Public procurement opportunity for Power Grid Corporation Of India Limited 420KV, 4400PF, 1PH CVT, GI support Stool, 220KV, 4400PF, 1PH CVT, CVT, Terminal Connector. Quantity: 265 issued by. Submission Deadline: 28-10-2026 11: 00: 00. View full details and respond.

Advertisement

Tender Data

Bid Details

Quantity

265

Category

420KV, 4400PF, 1PH CVT

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

420KV, 4400PF, 1PH CVT , GI support Stool , 220KV, 4400PF, 1PH CVT , CVT , Terminal Connector

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

74

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

14-09-2026 15:00:00

Pre-Bid Venue

Pre-Bid Meeting shall be conducted as per scheduled date indicated in GeM Bid (In Online Mode). Request for providing link for participation in online Pre-Bid Meeting shall be sent by bidder through e-mail at [email protected]

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Murshidabad

Delivery Pincodes

742237

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sanjana Sinha742237,POWERGRID CORPORATION OF INDIA LTD., Berhampore 400 KV Switching Station, Vill : Dakshingram, PO : Polsonda More, PS : Nabagram, Distt. : Murshidabad West Bengal-742238MurshidabadWest Bengal7422376180-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9813781.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Corporate Office Gurgaon

Grievance Contact

[email protected]

Corrigendum Updates

5 Updates
#1

Update

21-Oct-2026

Extended Deadline

28-Oct-2026, 5:30 am

Opening Date

29-Oct-2026, 5:30 am

#2

Update

14-Oct-2026

Extended Deadline

21-Oct-2026, 5:30 am

Opening Date

22-Oct-2026, 5:30 am

#3

Update

07-Oct-2026
#4

Update

07-Oct-2026

Extended Deadline

14-Oct-2026, 5:30 am

Opening Date

15-Oct-2026, 5:30 am

#5

Update

28-Sep-2026

Extended Deadline

08-Oct-2026, 5:30 am

Opening Date

09-Oct-2026, 5:30 am

Advertisement

Bill of Quantities (BOQ) 48 Items Sign in for GEM prices

#1

420KV, 4400PF, 1PH CVT

Supply of 420KV, 4400PF, 1PH CVT (Creepage 25mm/kV) with insulating base, Corona Ring & all its accessories as per TS

6 ea Delivery: 180 days
#2

420KV, 4400PF, 1PH CVT

Supply of 420KV, 4400PF, 1PH CVT (Creepage 25mm/kV) with insulating base, Corona Ring & all its accessories as per TS

6 ea Delivery: 180 days
#3

420KV, 4400PF, 1PH CVT

Supply of 420KV, 4400PF, 1PH CVT (Creepage 25mm/kV) with insulating base, Corona Ring & all its accessories as per TS

6 ea Delivery: 180 days
#4

420KV, 4400PF, 1PH CVT

Supply of 420KV, 4400PF, 1PH CVT (Creepage 25mm/kV) with insulating base, Corona Ring & all its accessories as per TS

2 ea Delivery: 180 days
#5

420KV, 4400PF, 1PH CVT

Supply of 420KV, 4400PF, 1PH CVT (Creepage 25mm/kV) with insulating base, Corona Ring & all its accessories as per TS

5 ea Delivery: 180 days
#6

420KV, 4400PF, 1PH CVT

Supply of 420KV, 4400PF, 1PH CVT (Creepage 25mm/kV) with insulating base, Corona Ring & all its accessories as per TS

4 ea Delivery: 180 days
#7

420KV, 4400PF, 1PH CVT

Supply & Retrofitment of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) with 04 nos MB & Terminal Connctor as per TS

12 no Delivery: 360 days
#8

420KV, 4400PF, 1PH CVT

Supply & Retrofitment of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) with 11 nos MB & Terminal Connctor as per TS

33 no Delivery: 360 days
#9

420KV, 4400PF, 1PH CVT

Supply & Retrofitment of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) with 2 nos MB & Terminal Connctor as per TS

6 no Delivery: 360 days
#10

420KV, 4400PF, 1PH CVT

Supply & Retrofitment of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) with 3 nos MB & Terminal Connctor as per TS

9 no Delivery: 360 days
#11

420KV, 4400PF, 1PH CVT

Supply of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) with 02 nos MB & Terminal Connctor as per TS

2 no Delivery: 180 days
#12

420KV, 4400PF, 1PH CVT

Supply of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) & Terminal Connctor as per TS

1 no Delivery: 180 days
#13

420KV, 4400PF, 1PH CVT

Supply of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) as per TS & Terminal Connctor as per TS

1 no Delivery: 180 days
#14

420KV, 4400PF, 1PH CVT

Supply of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) as per TS & Terminal Connctor as per TS

1 no Delivery: 180 days
#15

420KV, 4400PF, 1PH CVT

Supply of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) as per TS & Terminal Connctor as per TS

1 no Delivery: 180 days
#16

420KV, 4400PF, 1PH CVT

Supply of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) as per TS & Terminal Connctor as per TS

1 no Delivery: 180 days
#17

420KV, 4400PF, 1PH CVT

Supply of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) wth 02 nos MB & Terminal Connctor as per TS

1 no Delivery: 180 days
#18

420KV, 4400PF, 1PH CVT

Supply of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) with 02 nos MB & Terminal Connctor as per TS

1 no Delivery: 180 days
#19

420KV, 4400PF, 1PH CVT

Supply of 420 kV, 4400PF, 1PH CVT (Creepage 25mm/kV) with 02 nos MB & Terminal Connctor as per TS

1 no Delivery: 180 days
#20

GI support Stool

Supply of matching GI support stool/Base frame (Includes GI bolts, Nuts/Washers etc) for erecting the new 400 kV CVT in the existing pipe structure for matching height at relevant sites as per the TS/SCC/GTR/foundation details (Provided at.

12 no Delivery: 180 days
#21

GI support Stool

Supply of matching GI support stool/Base frame (Includes GI bolts, Nuts/Washers etc) for erecting the new 400 kV CVT in the existing pipe structure for matching height at relevant sites as per the TS/SCC/GTR/foundation details (Provided at.

33 no Delivery: 180 days
#22

GI support Stool

Supply of matching GI support stool/Base frame (Includes GI bolts, Nuts/Washers etc) for erecting the new 400 kV CVT in the existing pipe structure for matching height at relevant sites as per the TS/SCC/GTR/foundation details (Provided at.

6 no Delivery: 180 days
#23

GI support Stool

Supply of matching GI support stool/Base frame (Includes GI bolts, Nuts/Washers etc) for erecting the new 400 kV CVT in the existing pipe structure for matching height at relevant sites as per the TS/SCC/GTR/foundation details (Provided at.

9 no Delivery: 180 days
#24

220KV, 4400PF, 1PH CVT

Supply & Retrofitment of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories terminal connector & with 06 nos MB as per TS

18 no Delivery: 360 days
#25

220KV, 4400PF, 1PH CVT

Supply & Retrofitment of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories terminal connector & with 04 nos MB as per TS

12 no Delivery: 360 days
#26

220KV, 4400PF, 1PH CVT

Supply & Retrofitment of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector & with 02 nos MB as per TS

6 no Delivery: 360 days
#27

220KV, 4400PF, 1PH CVT

Supply & Retrofitment of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories Terminal connectoe with 01 nos MB as per TS

3 no Delivery: 360 days
#28

220KV, 4400PF, 1PH CVT

Supply of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector as per TS

1 no Delivery: 180 days
#29

220KV, 4400PF, 1PH CVT

Supply of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector as per TS

1 no Delivery: 180 days
#30

220KV, 4400PF, 1PH CVT

Supply of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector as per TS

1 no Delivery: 180 days
#31

220KV, 4400PF, 1PH CVT

Supply of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector as per TS

1 no Delivery: 180 days
#32

220KV, 4400PF, 1PH CVT

Supply of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector as per TS

1 no Delivery: 180 days
#33

220KV, 4400PF, 1PH CVT

Supply of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector as per TS

1 no Delivery: 180 days
#34

220KV, 4400PF, 1PH CVT

Supply of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector as per TS

2 no Delivery: 180 days
#35

220KV, 4400PF, 1PH CVT

Supply of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector as per TS

1 no Delivery: 180 days
#36

220KV, 4400PF, 1PH CVT

Supply of 220 kV, 4400 pF CVT (with creepage 25 mm/kV) all its accessories & terminal connector as per TS

1 no Delivery: 180 days
#37

GI support Stool

Supply of matching GI support stool/Base frame (Includes GI bolts, Nuts/Washers etc) for erecting the new 220 kV CVT in the existing pipe structure for matching height at relevant sites as per the TS/SCC/GTR/foundation details attached.

18 no Delivery: 180 days
#38

GI support Stool

Supply of matching GI support stool/Base frame (Includes GI bolts, Nuts/Washers etc) for erecting the new 220 kV CVT in the existing pipe structure for matching height at relevant sites as per the TS/SCC/GTR/foundation details attached.

12 no Delivery: 180 days
#39

GI support Stool

Supply of matching GI support stool/Base frame (Includes GI bolts, Nuts/Washers etc) for erecting the new 220 kV CVT in the existing pipe structure for matching height at relevant sites as per the TS/SCC/GTR/foundation details attached.

6 no Delivery: 180 days
#40

GI support Stool

Supply of matching GI support stool/Base frame (Includes GI bolts, Nuts/Washers etc) for erecting the new 220 kV CVT in the existing pipe structure for matching height at relevant sites as per the TS/SCC/GTR/foundation details attached.

3 no Delivery: 180 days
#41

CVT

420 kV, 4400pF CVT (with creepage 25 mm/kV) with insulating base, Corona Ring & all its accessories as per TS

3 ea Delivery: 180 days
#42

CVT

220 kV, 4400pF CVT (with creepage 25 mm/kV) with insulating base, Corona Ring & all its accessories as per TS

1 ea Delivery: 180 days
#43

CVT

420 kV, 4400pF CVT (with creepage 25 mm/kV) with insulating base, Corona Ring & all its accessories as per TS

2 ea Delivery: 180 days
#44

CVT

220 kV, 4400pF CVT (with creepage 25 mm/kV) with insulating base, Corona Ring & all its accessories as per TS

2 ea Delivery: 180 days
#45

Terminal Connector

Twin Moose (TERMINAL CONNECTOR 2M-420KV CVT)

3 ea Delivery: 180 days
#46

Terminal Connector

Single Moose ACSR Terminal Connector 245kV CVT

1 ea Delivery: 180 days
#47

Terminal Connector

Twin Moose (TERMINAL CONNECTOR 2M-420KV CVT)

4 ea Delivery: 180 days
#48

Terminal Connector

Single Moose ACSR Terminal Connector 245kV CVT

2 ea Delivery: 180 days

Categories 10

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC)

5

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement

Explore More Opportunities

Quick Access