Bid Publish Date
18-Oct-2026, 1:13 pm
Bid End Date
28-Oct-2026, 2:00 pm
Location
Progress
The Director General Of National Cadet Corps (DGNCC), under the Department Of Defence, invites bids for a Cycle with Cycling Kit in EAST SIKKIM (PIN 737101). The procurement scope covers bicycles and cycling kit, with an estimated quantity adjustable by up to 25% at contract award and during currency at contracted rates. The contract requires Detailed Design Drawings approval within 5 days of award, with buyer-provided feedback within 5 days and potential non-LD extension if approvals are delayed. Delivery and installation are to 1 Sikkim Bn NCC, NBB Govt College, Tadong, Gangtok, Sikkim. A vendor integrity pact and consortium flexibility are stated, along with mandatory vendor-code prerequisites.
Cycle with Cycling Kit
Delivery to 1 Sikkim Bn NCC, NBB Govt College, Tadong, Gangtok, Sikkim
Quantity adjustment up to 25% at contract award and during currency
Mandatory Detailed Design Drawings approval within 5 days of award
No LD if drawing approval is delayed by buyer
Integrity Pact required; vendor-code documents mandatory
Product must have at least 4 years residual market life; not end-of-life
Quantity adjustment up to 25% at bid and during currency
Detailed Design Drawings approval within 5 days of award
Delivery address fixed; LD waived for buyer delay in drawings
Delivery period can extend with 25% quantity changes; minimum extension 30 days; no LD if approval delay.
Not specified in available data.
No LD mentioned if buyer delays drawing approval; otherwise standard contract LD would apply per final terms.
Not under liquidation, court receivership, or bankruptcy
Consortium allowed to cover gaps in expertise
Products must have at least 4 years residual market life and not be end-of-life
Quantity
1
Bid Type
Single Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
10
Past Performance
50 %
Warranty Period
5 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Cycle with Cycling Kit
Pre-Bid Date
19-10-2026 12:00:00
Pre-Bid Venue
there should be a discussion reqarding the required items and specifications.
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
East Sikkim
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | East Sikkim | East Sikkim | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque
EFT mandate certified by bank
Signed Integrity Pact
Detailed Design Drawings (within 5 days of award)
Evidence of non-liquidation or bankruptcy status (undertaking)
Consortium agreement (if applicable)
Key insights about SIKKIM tender market
Bidders must submit all required vendor-code documents (PAN, GSTIN, cancelled cheque, EFT mandate), sign the Integrity Pact, and provide Detailed Design Drawings within 5 days of award. Ensure compliance with the 25% quantity option, and confirm delivery to 1 Sikkim Bn NCC, Gangtok. Prepare a bid with clear draw approval timelines and payment terms.
Required documents include PAN card, GSTIN certificate, cancelled cheque, bank EFT mandate, signed Integrity Pact, and any OEM authorizations if applicable. Additionally, a certificate of non-liquidity or non-bankruptcy is needed, along with experience or capability declarations showing market longevity and lack of obsolescence.
Delivery must occur to 1 Sikkim Bn NCC, NBB Govt College, Tadong, Gangtok, within the adjusted period after approval. The option clause allows up to 25% quantity changes; if approvals delay, the delivery period is refixed with no LD. Minimum additional time is 30 days for increased quantity, or equal to original delivery if original < 30 days.
Bidders must upload a signed Integrity Pact and uphold it per the buyer’s policy. The consortium option is allowed to cover expertise gaps. Ensure non-liquidation status with an undertaking. Detailed Drawings must be approved by the buyer before fabrication starts, with modification lists provided if needed.
Yes. Bidders must offer products not declared end-of-life by the OEM within the proposed period and must have at least 4 years of residual market life. The kit must remain market-viable and supported by the OEM during the contract term to avoid obsolescence risk.
Within 5 days of award, submit Detailed Design Drawings for buyer approval. The buyer will approve or provide a modification list within 5 days. If the buyer delays approval, the delivery period is adjusted accordingly without liquidated damages, ensuring alignment with the approved drawings.