Bid Publish Date
04-Sep-2026, 9:41 am
Bid End Date
14-Sep-2026, 10:00 am
Location
Progress
Muzaffarpur District Panchayats, Department of Panchayati Raj, invites submission for the procurement of an RO Plant with Genset and Trolley located in Muzaffarpur, Bihar (PIN 842001). The contract contemplates delivery and installation within 15 days from PO and requires that items be new, branded, ISI/BIS certified. A flexible quantity option allows up to 25% variation during/after award. A functional service center within the state is imperative with a 30-day setup deadline if not already present. All GST-inclusive rates and onsite verification will drive payment processing post-installation.
Key differentiators include mandatory ISI/BIS branding, rapid delivery window, post-installation verification, and service coverage within 5 km radius of consignee locations. The procurement emphasizes swift deployment, turnkey installation, and strict adherence to quality and warranty norms. This tender targets suppliers capable of meeting both the technical and logistical demands of rural water treatment infrastructure in Bihar.
EMD amount and exact submission documents must be provided with bid as per T&C
Delivery and installation within 15 days; no extra charges for transport
100% payment after successful delivery, installation and verification
Delivery and installation within 15 days of PO; option clause allows quantity variation up to 25% during contract
Delay penalty at 1% per week of total order value, capped at 10%
Bidder/OEM must have functional service center in the state or establish within 30 days; service within 5 km radius preferred
Must provide GST registration and PAN details with bid
Past work experience certificates for similar RO or water-treatment equipment projects
Demonstrate capability to deliver and install within 15 days and establish local service support
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
RO Plant with Genset and Trolley (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Muzaffarpur
Delivery Pincodes
843101
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sanjay Sharma | 843101,Panchayat Bhawan, Gram Datapur, Post Datapur, Gram Panchayat Raj Datapur Punchbhinda | Muzaffarpur | Bihar | 843101 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Key insights about BIHAR tender market
Bidders should prepare GST registration, PAN, and past experience certificates, then submit along with the bid. Ensure ISI/BIS certification of the RO plant, confirm delivery within 15 days, and include evidence of a functional service center in Bihar or plan to establish within 30 days. Include 100% payment terms and warranty coverage details.
Required documents include GST certificate, PAN card, past work experience certificates, financial statements, EMD documents, technical bid documents, and OEM authorizations if applicable. All documents must prove capability to meet 15-day delivery and installation, with ISI/BIS conformity.
Tenders demand ISI/BIS certified quality for all items. Vendors must provide certificates proving ISI/BIS compliance for the RO plant, genset and trolley assembly, and confirm warranty terms meeting the buyer's onsite expectations as applicable.
Delivery and installation must be completed within 15 days from the PO issue date. The awarded bidder must ensure timely site work, stock readiness, and installation teams to avoid penalties under the terms.
The contract specifies 100% payment after delivery, installation and verification by the concerned authority. Ensure all invoicing aligns with delivery milestones and verification approval to trigger payment processing.
Late delivery incurs a penalty of 1% per week of the total order value, with a maximum cap of 10%. Plan logistics to ensure installation and testing completion within the 15-day window to avoid charges.
Bidders must demonstrate a functional service center within the state or commit to establishing one within 30 days of award. Service should be available within a 5 km radius of each consignee location for carry-in warranty support.
Warranty terms specify onsite coverage for applicable components; computers require a minimum 1 year onsite warranty and fans a minimum 2 years warranty. Align the RO plant warranty with product type and ensure serviceability within Bihar.