Progress
The Indian Army, Department Of Military Affairs, seeks a supplier for a Backpacks - Rucksack - Forty Liter (MHA) 40L in RANCHI, JHARKHAND. Tender scope lacks BOQ items and explicit quantities; the estimate value and EMD are not disclosed. The procurement emphasizes standard compliance and sample demonstrations at the location, with a one-time or staged delivery framework. A key differentiator is the inclusion of a flexible option clause allowing up to 25% quantity variation at contracted rates. This fuels a need for scalable manufacturing and robust delivery planning. Bidders should prepare for on-site sample evaluation and alignment with AR/ATC terms.
Option to increase/decrease quantity up to 25% at contract time
Delivery period calculation with minimum 30 days extension
Sample demonstration requirement at the bidding location
EMD and estimated value not disclosed in the tender
BOQ shows Total Items: 0, indicating open-ended procurement
Not disclosed in tender data; confirm upon tender clarification and contract award
Delivery begins from the last date of original delivery order; extended time follows (additional quantity ÷ original quantity) × Original delivery period, minimum 30 days
Not explicitly stated; verify in final contract and ATC clarification
Experience in supplying backpacks or similar military-grade bags
Financial stability evidenced by turnover statements
Compliance with OEM authorizations and sample demonstration readiness
Quantity
30
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
20 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Backpacks - Rucksack - Forty Liter (MHA) (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ranchi
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ranchi | Ranchi | - | - | 30 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates for similar backpack supply projects
Financial statements or turnover information
EMD/Security deposit documentation (amount not disclosed in tender)
Technical bid documents and compliance statements
OEM authorizations or confirmations of manufacturing capability
Sample demonstration documentation (site visit confirmation)
Key insights about JHARKHAND tender market
Bidders must submit GST and PAN, experience certificates, financial statements, EMD documentation, OEM authorizations, and technical compliance. Prepare for on-site sample demonstration and adhere to the option clause allowing ±25% quantity variation. Ensure delivery aligns with the last-order delivery timeline and potential extensions with minimum 30 days.
Required documents include GST registration, PAN card, backpack-related experience certificates, financial statements, EMD/Security deposit evidence, technical bid and compliance, OEM authorization, and site demonstration confirmation. Ensure all documents reflect capacity and sample readiness for the 40L Rucksack.
No explicit technical specs are provided; bidders should rely on on-site sample evaluation. Prepare for potential standards or OEM requirements and ensure compatibility with military-grade transport expectations. Confirm capacity, fabric, zippers, and load-bearing tests during demonstration at the location.
Delivery terms allow up to 25% quantity variation at contract award and during the contract, calculated using the original delivery period. If original period is less than 30 days, the extension equals the original period; otherwise, minimum 30 days applies for extended delivery.
Bidders must facilitate an on-site sample demonstration at the location. Ensure the 40L backpacks meet basic endurance checks and exhibit build quality, stitching, zippers, and comfort features as part of the pre-bid evaluation.
Penalties are not explicitly stated in the tender data; confirm liquidated damages terms during clarification and final contract. Prepare for performance-based consequences if delivery timelines or quality benchmarks are not met.
Bidders should provide OEM authorization or robust manufacturing capability proofs for producing 40L Rucksack backpacks. Ensure alignment with potential IS or military-grade standards and possess documentation confirming production capacity and supply chain reliability.