Progress
The procurement is issued by Kendriya Vidyalaya Sangathan under the Department of School Education and Literacy for Valve Regulated Lead Acid (VRLA) batteries as per TEC specification (Q3) in Bidar, Karnataka 585226. There is no listed BOQ quantity, and the estimated value is not disclosed. The contract requires delivery to the PM SHRI KV AFS BIDAR address in Bidar. An option clause allows up to ±25% quantity variation at contracted rates, with delivery time adjustments based on a calculated formula. The scope emphasizes supply continuity and avoidance of obsolete products with a minimum 5-year market life. The terms stress GST-compliant invoicing via GeM and mandatory certificates, including end-user documentation when requested. Unique clauses include Malicious Code Certificate and GST-related conditions. This tender emphasizes compliance, led by KV Bidar with a structured delivery framework.
KEY DIFFERENTIATOR: The option clause for quantity variation and the requirement to avoid end-of-life products ensures sustained supply and post-award adaptability. The delivery address specificity and mandatory security/compliance attestations underscore strict procurement governance.
Use-case: Suppliers with VRLA battery lines aligned to TEC Q3, GST-compliant invoicing, and OEM-backed warranties should evaluate eligibility and capability to meet end-user installation at Bidar address.
VRLA batteries as per TEC specification (Q3)
Delivery address: PM SHRI KV AFS BIDAR, CHIDRI ROAD, BIDAR, KA
Quantity flexibility: up to 25% variation
Lifecycle: minimum 5 years residual market life
GST invoicing on GeM with GST payment confirmation
End User Certificate and Malicious Code Certificate requirements
No BOQ data available; supply scope inferred from TEC Q3 compliance
Quantity variation up to 25% with price protection
GST compliance and GeM invoicing with payment proof
End User Certificate and Malicious Code Certificate mandatory when requested
GST-based invoicing on GeM; reimbursement at actuals or quoted GST %, whichever is lower
Delivery period starts from last date of original delivery order; option extensions computed with minimum 30 days
Not explicitly stated; penalties likely governed by standard GeM terms and contract specifics
Not under liquidation, court receivership, or bankruptcy
Offer non-obsolete VRLA batteries with at least 5 years residual market life
GST compliant bidder with GSTIN and proper invoicing capability
Quantity
14
Bid Type
Two Packet Bid
Bid Validity
150 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
50 %
Warranty Period
2 years
Experience Required
3 Year (s)
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Valve Regulated Lead Acid (VRLA) Batteries as per TEC Specification (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bidar
Delivery Pincodes
585401
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kamlesh Rautela | 585401,Kendriya Vidyalaya, Air Force Station, Bidar Chidri Road, Bidar, Karnataka Pin - 585401 | Bidar | Karnataka | 585401 | 14 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
16-Nov-2026, 3:30 am
Opening Date
17-Nov-2026, 3:30 am
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (if any for VRLA batteries)
Financial statements (as required by terms)
EMD/Security deposit documentation (if applicable)
Technical bid documents confirming TEC Q3 compliance
OEM authorization certificates
End User Certificate (if demanded by buyer)
Malicious Code Certificate as per clause
GST invoice sample and GST portal payment confirmation screen
Key insights about KARNATAKA tender market
Bidders must submit GST registration proof, PAN, experience certificates for VRLA battery supply, financial statements, and OEM authorizations. Ensure TEC Q3 compliance, provide End User Certificate if requested, and attach Malicious Code Certificate. Invoices must be GST-compliant on GeM with payment confirmation. Delivery will be to Bidar address; price variations up to 25% allowed.
Required documents include: GST registration, PAN, experience certificates, financial statements, EMD (if applicable), OEM authorizations, TEC Q3 compliance certificates, End User Certificate (if demanded), and Malicious Code Certificate. GeM invoice and GST payment screenshot must accompany the bid.
Delivery period starts from the last date of the original delivery order; option to extend up to 25% quantity with a delivery extension calculated as (increased/original) × original period, minimum 30 days. Actual delivery to PM SHRI KV AFS BIDAR, Bidar, KA is required.
Bidders must supply batteries as per TEC specification (Q3). Ensure products are not end-of-life within five years of market life and meet TEC Q3 compliance; include OEM authorizations and TEC-related testing where applicable.
End User Certificate is required only if demanded by the Buyer. When requested, bidders must provide the certificate in the Buyer’s standard format to verify end-use and installation at the Bidar facility.
GST reimbursement will be provided as actuals or as per applicable rates, whichever is lower, limited to the quoted GST percentage. Bidders must upload GST invoices and GST portal payment confirmations on GeM.
Bidders must quote products with at least 5 years residual market life and avoid items marked end-of-life by the OEM within that period; this ensures continuous support and availability during the contract term.
Delivery includes installation and commissioning if covered in scope; otherwise, delivery only. If installation is included, ensure adherence to safety and TEC Q3 installation guidelines and complete commissioning at the Bidar address per contract terms.