Bid Publish Date
04-Sep-2026, 12:39 pm
Bid End Date
14-Sep-2026, 1:00 pm
Location
Progress
Bharat Electronics Limited (BEL), Department Of Defence Production, invites bids for II TUBE, R18 NON INV FOM 1700 (Q3) at KRISHNA, ANDHRA PRADESH 520001. The tender lacks listed technical specifications and BOQ items (Total Items: 0). Estimated value and EMD are not disclosed. The ATC document is referenced but not provided in data. A key differentiator is the bidder risk/option clause allowing up to 25% quantity variation at contract award and during the contract currency, with delivery timing tied to the original period and extended period rules. This procurement appears to focus on defense-oriented components with a flexible quantity framework.
Product/service names: II TUBE, R18 NON INV FOM 1700 (Q3) as per BEL title
Estimated value: Not disclosed
EMD amount: Not disclosed
Delivery requirements: Not specified; subject to option clause definitions
Standards/certifications: Not specified in available data; refer to ATC
Quality/testing: Not specified; rely on ATC for details
Warranty/AMC: Not specified in available data
Key Term 1: Option to vary quantity up to 25% during contract
Key Term 2: Delivery period tied to original/extended schedule with minimum 30 days
Key Term 3: ATC document uploaded by buyer; detailed specs reside there
Not specified in available data; confirm in ATC and contract
Delivery timeline linked to original delivery date; extended time formula applies with minimum 30 days
Not specified; verify in ATC/contract
Eligibility criteria to be defined in ATC; bidders should monitor for defense/production experience
Domestic or foreign entities must comply with BEL procurement policies
Submission of required documents listed above
Quantity
5
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
II TUBE, R18 NON INV FOM> 1700 (Q3)
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Krishna
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Krishna | Krishna | - | - | 5 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (defense/related components preferred)
Financial statements (annual reports or equivalent)
EMD/Security deposit documentation (as per ATC)
Technical bid documentation (compliance to ATC)
OEM authorizations or endorsements (if applicable)
Any existing ISI/ISO/BIS certifications referenced in ATC
Duly signed terms and conditions acceptance
Key insights about ANDHRA PRADESH tender market
Bidders must submit GST registration, PAN card, experience certificates, financial statements, and EMD paperwork as per ATC. Technical bid documentation and OEM authorizations may be required; ensure ISI/ISO/BIS certifications if referenced, and sign acceptance of all ATC terms before submission.
Register as a bidder, obtain the ATC document, and prepare required documents listed in the terms. Ensure compliance with the option clause allowing 25% quantity variation and align delivery timelines with the original and extended periods per contract rules.
Delivery timing follows the original delivery period; if extended, additional time is calculated as (Increased quantity ÷ Original quantity) × Original period, minimum 30 days. The Purchaser may extend to the original delivery period under option clause.
No explicit specifications are listed in the public data; bidders should review the uploaded ATC document for exact technical requirements, testing criteria, and compliance standards applicable to II TUBE, R18 NON INV FOM 1700 (Q3).
The EMI/EMD amount is not disclosed in the available data; bidders must refer to the ATC or tender documents to confirm the exact EMD requirement and acceptable submission modes (DD/online).
Standards are not specified in public data; bidders should verify ISI/ISO/BIS or other applicable certifications in the ATC. Ensure compliance with any standard numbers mentioned within the official ATC and contract annexures.
Exact bid submission deadlines are not provided in the available data. Bidders must refer to the ATC document and BEL procurement portal announcements for the final bid submission date and time.
The ATC contains purchaser-specific terms, conditions, and technical requirements. It governs EMD, payment terms, delivery, and compliance criteria; bidders must thoroughly review the uploaded ATC to align their bid with BEL’s expectations.