Progress
Surat District Panchayat, under the Panchayats And Rural Housing Department Gujarat, seeks supply and installation readiness for LED luminaires conforming to IS 10322 (Part 5/Section 3) V3, MCB conforming to IS/IEC 60898 (Part 1), and XLPE cables up to 1.1 kV conforming to IS 7098 (Part 1), with an estimated value of ₹1,000,000 and an EMD of ₹30,000. The procurement location is SURAT, GUJARAT 394101. The vendor must demonstrate prior related supply/installation experience and provide data sheets with matching technical parameters. The tender includes an option clause allowing up to 25% quantity variation and extended delivery time proportional to added quantity. A service office within the consignee state is mandatory, with escalation details and toll-free support requirements. This is a multi-product, state-backed procurement with data sheet verification and stringent compliance.
LED luminaires conforming to IS 10322 (Part 5/Section 3) V3
MCB rated per IS/IEC 60898 (Part 1)
XLPE cable up to 1.1 kV marked per IS 7098 (Part 1)
Data Sheet submission with exact model numbers, luminaire efficiency, IP rating, and voltage range
Delivery office in Gujarat; dedicated service line with escalation details
EMD amount of ₹30,000 to be submitted with bid
Delivery quantity may vary up to 25% of bid quantity
Office of service provider must be in Gujarat with contactable escalation matrix
Data Sheets must match product parameters to avoid rejection
Prior experience: 3 financial years with orders meeting thresholds
Payment terms to be as per Rate Contract; ensure compliance with escalation and delivery clauses
Delivery period linked to order date; extended time proportional to added quantity with minimum 30 days
Penalties applicable for delay as per contract; LD details to be confirmed in bid documents
Must have prior supply/installation of LED luminaires, MCBs, and XLPE cables in government or equivalent projects
Must demonstrate GST registration, financial stability, and non-liability in liquidation or bankruptcy
Must provide data sheets matching offered products and complete OEM authorizations if applicable
Quantity
2450
Category
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3)
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+20%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
20 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Q2) , Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2) , XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
12
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Surat
Delivery Pincodes
394250
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pavra Milankumar Jivabhai | 394250,Taluka Panchayat Office Taluka panchayat Building Mahuva | Surat | Gujarat | 394250 | 400 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
02-Nov-2026, 1:30 pm
Opening Date
03-Nov-2026, 1:30 pm
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates for similar supply/installation in last 3 financial years
Financial statements demonstrating bidder's financial standing
EMD submission document (₹30,000)
Data Sheet of LED luminaires, MCBs, and XLPE cables offered
OEM authorization (if bidding through a reseller)
Service office proof in Gujarat (address and contact details)
Escalation matrix and toll-free service number
Any other certificates requested in ATC/Corrigendum
Key insights about GUJARAT tender market
Bidders must submit GST, PAN, data sheets, and EMD of ₹30,000. Ensure LED luminaires meet IS 10322 Part 5/Section 3 V3, and provide prior installation records from last 3 financial years with satisfactory certificates; include Gujarat service office proof and escalation matrix.
Submit data sheets for MCBs, OEM authorization if applicable, GST, PAN, financials, and experience certificates showing three years of similar orders with proper performance certificates; provide service support details and toll-free numbers.
Cables must be marked as XLPE with working voltage up to 1.1 kV, compliant with IS 7098 Part 1; include data sheet specifying conductor material, insulation, voltage rating, and test certificates; ensure installation compatibility in Gujarat projects.
Delivery starts from order date, with option to extend proportional to added quantity. Minimum extension period is 30 days; ensure delivery within original schedule unless the option clause is invoked and extended.
EMD is ₹30,000. Submit via online payment or DD as specified, along with bid documents; ensure EMD validity through the contract period and provide proof in the bid submission.
Provide a dedicated Gujarat-based service office, escalation matrix with telephone numbers, and a toll-free support line; ensure prompt response to service requests and maintenance for LED luminaires, MCBs, and XLPE cables.
Show three financial years of related orders: (i) single order ≥ 35% of bid value, or (ii) two orders ≥ 20% each, or (iii) three orders ≥ 15% each; attach satisfactory performance certificates from buyers and ensure bids reflect the primary product value.
Pursuant to option clause, the purchaser may increase or decrease quantity up to 25% at contracted rates; delivery time adjusts based on the new quantity using the specified formula, ensuring minimum 30 days extra as applicable.