Bid Publish Date
31-Aug-2026, 9:41 am
Bid End Date
17-Sep-2026, 7:00 pm
Progress
The opportunity is issued by Advanced Weapons And Equipment India Limited under the Department Of Defence Production for the procurement of a PIN SAF DRG. NO COATING item. The tender contemplates flexible quantity meaning the purchaser may adjust up to 50% of the bid quantity at contract placement and during the contract period at contracted rates. Delivery timelines are derived from the last date of the original delivery order with adjustments for extended periods. GST considerations are bidder-determined, with reimbursement as actuals or the lower applicable rate. Post-receipt inspection will be carried out by an authorised SAF representative. Document uploads for vendor code creation include PAN, GSTIN, canceled cheque, EFT mandate. Supply orders are issued yearly, and the SAF may supersede GeM-sourced quantities during in-house issuance. A robust emphasis on compliance with certificates and ATC terms is evident.
Product/service: PIN SAF DRG. NO COATING
BOQ items: Total Items 0 (no BOQ entries)
Inspection: Post Receipt Inspection at consignee site by SAF authorised personnel
Delivery: Option clause allows +50% quantity with pro-rated extension formula (min 30 days)
Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate required for vendor code
Contract: Yearly supply orders; in-house SAF orders supersede GeM quantities
Standards/Compliance: Not specified in data; ATC/compliance certificates required
Qty adjustment up to 50% during contract with pro-rata delivery time
GST payable by bidder; reimbursement based on actuals or lower rate
Mandatory vendor code documents: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Post-receipt inspection by SAF; pre-dispatch inspection not applicable
Yearly supply orders; umbrella agreement not binding for fixed quantities
GST payable by bidder; reimbursement as actuals or applicable lower rate; no explicit upfront payment terms disclosed
Delivery extensions computed as (Additional quantity / Original quantity) × Original delivery period; minimum 30 days, with possible extension to original period
LD clause present; specific rates not disclosed in available data
Must submit PAN, GSTIN, canceled cheque, and EFT Mandate
Must comply with post-receipt inspection by SAF officials
Must accept yearly supply order framework and potential quantity adjustments
Quantity
87318
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
Yes
Arbitration Clause
Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PIN SAF DRG. NO. SK-203 DF-09 WITHOUT COATING
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
50
Delivery Locations
1
Delivery Cities
KANPUR CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | KANPUR CITY | KANPUR CITY | - | - | - | 50 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
Certificates/qualifications as per ATC
Any OEM authorizations (if applicable)
Technical bid/compliance documents
Experience certificates (if required by ATC)
GST cashback or exemption documents (if applicable)
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate for vendor code creation, plus ATC-compliant certificates. The tender allows a 50% quantity variation and requires post-receipt inspection by SAF. GST is to be paid by the bidder with reimbursement as actuals or the lower applicable rate. Delivery terms follow the extended period formula.
Submit PAN, GSTIN, cancelled cheque, EFT Mandate, and relevant certificates per ATC. Include technical bid documents and any OEM authorizations. Ensure post-receipt inspection readiness and yearly supply order compliance. Failures to provide documents risk bid rejection.
If quantity increases up to 50%, the extension is calculated as (Additional quantity / Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend the delivery period to the original duration while applying the option clause.
Supply orders are issued on a yearly basis, based on confirmed target and supplier performance. SAF-internal supply orders may supersede GeM-dispatched quantities. The long-term umbrella agreement does not guarantee the indicated quantity.
Post Receipt Inspection at the consignee site is conducted by authorised SAF representatives. Pre-dispatch inspection is not applicable unless specifically selected in ATC. This ensures stores meet acceptance standards before final clearance.
Bidders must determine applicable GST and will be reimbursed at actuals or the lower rate. The applying bidder bears the duty to quote GST correctly and seek reimbursement as per prevailing rates, subject to tender terms.
A liquidated damages clause exists, but exact rates are not disclosed in the available data. Bidders should prepare for LDs aligned to delivery delays and ensure contingency plans to avoid penalties.
Upload certificates as required by ATC and tender documents; ensure PAN, GSTIN, EFT Mandate, and any OEM authorizations. Compliance with post-receipt inspection and supplier-code requirements is essential for bid validity.