Progress
The Indian Army, Department Of Military Affairs, seeks repair services for the Micro UAV Drishya Pro DPMK-II 291. Scope encompasses repair, installation, testing, and commissioning of the UAV, with on-site inspection by the buyer. The bid requires the supplier to supply all required spares, components, and labour, and ensure completion with testing at the buyer’s location. The contract emphasizes post-repair testing in the presence of a buyer representative and a defined warranty period. No BOQ items are listed.
Product/Service: Repair, installation, testing and commissioning of Micro UAV Drishya Pro DPMK-II 291
Warranty: 6 to 12 months on repaired equipment
Inspection reference: SLBR52
Payment: 100% after successful completion and inspection with work completion certificate
Turnover: three-year average turnover requirement with audited statements or CA certificate
OEM: registered Indian office for imported UAV after-sales service
Documentation: single-upload rule, no duplicates
EMD/financial guarantee: Not specified in data; ensure turnover and warranty compliance
Delivery/installation: Complete scope including testing at buyer’s site
Warranty/Penalties: 6–12 months warranty; defect rejection rights with transport costs on vendor
100% payment upon successful work completion, installation, testing, and inspection with work completion certificate.
Scope includes supply, installation, testing, and commissioning at buyer's location; no specific dates provided.
No explicit LD figures stated; defects and non-conformities may be rejected with associated transport costs.
Minimum average annual turnover for last 3 years as per bid criteria
Experience in UAV repair or similar defense equipment within last 3–5 years
OEM authorization for imported UAVs or proof of Indian after-sales support
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
4
Past Performance
10 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair of Micro UAV Drishya Pro DPMK-II 291
Max Delivery Days
29
Delivery Locations
1
Delivery Cities
Dhemaji
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Dhemaji | Dhemaji | - | - | 1 | 29 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
01-Oct-2026, 4:30 am
Opening Date
02-Oct-2026, 4:30 am
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements or CA certificate indicating turnover for last 3 years
Experience certificates for similar UAV repair projects
OEM authorization or authorised seller certificate (for imported UAVs)
Work completion certificate or reference from buyer for similar repairs
Technical bid documents and inspection reports
Any other documents specifically requested in the terms
Key insights about ASSAM tender market
To bid, upload all required documents (GST, PAN, turnover certificates, OEM authorizations), ensure the UAV repair scope matches the bid, provide a 6–12 month warranty, and confirm 100% payment upon completion after buyer inspection and certification.
Submit GST certificate, PAN, three-year turnover audited statements, CA certificate, UAV repair experience certificates, OEM authorization for imported equipment, and the work completion certificate or reference from a similar project.
The contract requires repair, installation, testing, and commissioning of Micro UAV Drishya Pro DPMK-II 291, with 6–12 months warranty; SLBR52 inspection reference; all spares and labor to be supplied by the contractor.
Payment is released as 100% after successful completion, installation, testing, and buyer inspection, with a work completion certificate issued by the user/inspection authority.
A minimum warranty of 6 to 12 months is required for the repaired Micro UAV Drishya Pro DPMK-II 291, covering workmanship and replaced components as applicable.
Imported UAVs require an OEM or authorized seller with a registered office in India to provide after-sales service; submit the certificate proving this arrangement.
Buyer reserves the right to inspect and reject defective parts; SLBR52 is noted as the inspection reference, and all replacement costs are borne by the vendor for rejected parts.