Bid Publish Date
03-Sep-2026, 7:57 pm
Bid End Date
17-Sep-2026, 2:00 pm
Location
Progress
Bharat Petroleum Corporation Ltd invites bids for switches and differential pressure gauges at Mumbai, Maharashtra. The procurement references multiple gear-specific items, including differential pressure switches and gauges, with a catalog indicating ranges from 0.1–1.5 bar to 0–4 KG/cm² and additional 50 KG/cm² capacity notes. The BOQ lists 5 total items but provides no explicit quantities or values. The buyer emphasizes quantity flexibility up to 25% and a delivery timeline tied to the original delivery order with extensions governed by a calculated formula. This reflects BPCL’s need for modular stock and responsive supply, with a strong emphasis on adherence to the option clause and delivery-time adjustments within contract duration.
Quantity flexibility up to 25% at contracting and during contract currency
Delivery period defined from last date of original delivery order with minimum 30 days
Extension of delivery time follows calculated formula and may extend to original delivery period
Payment terms are not detailed in the excerpt; bidders should verify in the ATC/documentation and terms.
Delivery timeline begins from the last date of the original DO; extensions follow option clause calculations with a minimum 30 days.
No LD details provided; bidders should confirm LD/penalties in full terms.
Experience in supplying differential pressure instrumentation to oil/gas or BPCL-scale needs
Valid GST and PAN with financial stability demonstrating bid readiness
OEM authorization for differential pressure gauges/switches (if required by OEM terms)
Quantity
47
Category
59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer , 59.80.79.743.5 Switch Diff.Press 0.2 4 Kg cm2 switzer , 60.32.89.749.5SWITCH PR SWITZER GE 201 02 0 50KG CM2 , 59.80.79.740.5 DIFFERENTIAL PR GAUGE SWITZER 0 4 KG CM , 59.80.79.739.5 DIFFERENTIAL PR GAUGE SWITZER 0 2.5KG CM
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
18
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
56
Delivery Locations
1
Delivery Cities
Mumbai Suburban
Delivery Pincodes
400071
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Neha Dilip Malve | 400071,BHARAT PETROLEUM CORPN LTD MUMBAI REFINERY , MAHUL , CHEMBUR | Mumbai Suburban | Maharashtra | 400071 | 10 | 56 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer
59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer
59.80.79.743.5 Switch Diff.Press 0.2 4 Kg cm2 switzer
59.80.79.743.5 Switch Diff.Press 0.2 4 Kg cm2 switzer
60.32.89.749.5SWITCH PR SWITZER GE 201 02 0 50KG CM2
60.32.89.749.5 SWITCH PR SWITZER GE 201 02 0 50KG CM2
59.80.79.740.5 DIFFERENTIAL PR GAUGE SWITZER 0 4 KG CM
59.80.79.740.5 DIFFERENTIAL PR GAUGE SWITZER 0 4 KG CM
59.80.79.739.5 DIFFERENTIAL PR GAUGE SWITZER 0 2.5KG CM
59.80.79.739.5 DIFFERENTIAL PR GAUGE SWITZER 0 2.5KG CM
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer | 59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer | 10 | piece | buycon859 | 56 | |
| 2 | 59.80.79.743.5 Switch Diff.Press 0.2 4 Kg cm2 switzer | 59.80.79.743.5 Switch Diff.Press 0.2 4 Kg cm2 switzer | 20 | piece | buycon859 | 56 | |
| 3 | 60.32.89.749.5SWITCH PR SWITZER GE 201 02 0 50KG CM2 | 60.32.89.749.5 SWITCH PR SWITZER GE 201 02 0 50KG CM2 | 5 | piece | buycon859 | 56 | |
| 4 | 59.80.79.740.5 DIFFERENTIAL PR GAUGE SWITZER 0 4 KG CM | 59.80.79.740.5 DIFFERENTIAL PR GAUGE SWITZER 0 4 KG CM | 6 | piece | buycon859 | 56 | |
| 5 | 59.80.79.739.5 DIFFERENTIAL PR GAUGE SWITZER 0 2.5KG CM | 59.80.79.739.5 DIFFERENTIAL PR GAUGE SWITZER 0 2.5KG CM | 6 | piece | buycon859 | 56 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar instrumentation supply
Financial statements / turnover proof
EMD deposit proof (as applicable under terms)
Technical bid documents showing compliance with differential pressure gauges/switches
OEM authorization or dealer authorization documents (if OEM-specific)
Technical compliance certificates (if any) referenced in ATC
Key insights about MAHARASHTRA tender market
Bidders should review the ATC, ensure OEM authorization, and submit GST, PAN, and experience certificates. Provide technical bid for differential pressure gauges and switches, with documentation showing ability to supply up to 25% additional quantity and compliance with delivery extension terms plus the last DO date delivery rule.
Submit GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD proof, technical bid, OEM authorizations, and any applicable compliance certificates. Ensure all documents align with the buyer's ATC terms and the provision for option quantity.
Key specs include differential pressure switches ranging from 0.1–1.5 bar and 0.2–4 KG/cm², with some items up to 50 KG/cm², and references to Switzer/GE 201 variants. Provide OEM-approved, ISI/IS standards-compliant options if required by terms.
Delivery starts from the last date of the original delivery order. The option clause allows up to 25% quantity variations and extensions calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Eligibility includes prior experience in supplying differential pressure devices, valid GST/PAN, financial robustness, and OEM authorizations if applicable. Bidders must comply with the ATC and option-quantity terms to qualify.
The tender implies quality/compliance for pressure instrumentation; bidders should reference IS/ISO where applicable and provide OEM authorization certificates; verify any explicit standard numbers in the ATC document and terms.
Check the ATC and supplier's OEM authorization letter matching the listed model references (Switzer/GE 201). Provide valid authorization to bid on differential pressure gauges and switches used in BPCL procurement.
The buyer may increase/decrease quantities by up to 25% at contract placement and during currency. Bidders should plan stock, confirm pricing for variations, and align delivery schedules to potential quantity changes.