Bharat Petroleum Corporation Ltd Switch & Differential Pressure Gauges Tender Mumbai Maharashtra 2026

Bid Publish Date

03-Sep-2026, 7:57 pm

Bid End Date

17-Sep-2026, 2:00 pm

Progress

Issue03-Sep-2026, 7:57 pm
AwardPending

Key Highlights

  • Brand/OEM requirements referenced by item names (Switzer/GE 201) suggest potential OEM authorization needs
  • Technical scope includes differential pressure switches and gauges with multiple pressure ranges
  • Option clause allowing ±25% quantity variation during contract and currency
  • Delivery period linked to last date of original DO with formula-based extensions

Tender Overview

Bharat Petroleum Corporation Ltd invites bids for switches and differential pressure gauges at Mumbai, Maharashtra. The procurement references multiple gear-specific items, including differential pressure switches and gauges, with a catalog indicating ranges from 0.1–1.5 bar to 0–4 KG/cm² and additional 50 KG/cm² capacity notes. The BOQ lists 5 total items but provides no explicit quantities or values. The buyer emphasizes quantity flexibility up to 25% and a delivery timeline tied to the original delivery order with extensions governed by a calculated formula. This reflects BPCL’s need for modular stock and responsive supply, with a strong emphasis on adherence to the option clause and delivery-time adjustments within contract duration.

Technical Specifications & Requirements

  • Product/service names: differential pressure gauges, differential pressure switches (Switzer/Ge 201 variant references appear in category), high-capacity switches up to 50 KG/cm².
  • Delivery/installation context: procurement for refinery or gas-plant instrumentation alignment in Mumbai region; no explicit installation scope stated.
  • Quantities/values: 5 BOQ items; exact quantities not disclosed; estimated value not specified.
  • Standards/Compliance: references to pressure measurement devices imply general instrument standards; no explicit IS/ISO numbers specified.
  • Experience/Capabilities: bidders should demonstrate capability to supply pressure instrumentation at scales used by gas/oil sector; OEM authorizations may be implied

Terms, Conditions & Eligibility

  • Quantity variation: Purchaser may increase/decrease quantity up to 25% during contract and extended periods.
  • Delivery timeline: Delivery period starts from last date of original DO; time extensions follow the stated formula and minimum 30 days.
  • Option clause delivery: Additional time calculation ensures minimum 30 days and can extend up to original delivery period.
  • ATC compliance: Bidders must comply with the buyer’s ATC terms; an ATC document is referenced for view.
  • Documentation: Emphasis on submitting compliance with terms and agreement to option clauses; no explicit payment or warranty terms detailed here.

Key Specifications

    • Product/service names: differential pressure gauge, differential pressure switch (Switzer, GE 201 02), high-capacity 50 KG/cm² switch
    • Capacities/ranges: 0.1–1.5 bar (switch diff.press), 0.2–4 KG/cm² (diff pressure switches), 50 KG/cm² (maximum gauge switch capacity)
    • Delivery location: Mumbai, Maharashtra (400002) with refinery/instrumentation scope implied
    • Quantity/BOQ: 5 items in BOQ; exact quantities not disclosed
    • Standards/quality: explicit standards not listed; bidders should cite applicable instrumentation standards and OEM approvals
    • Brand/OEM: possible Switzer/GE 201 model references; OEM authorization may be required

Terms & Conditions

  • Quantity flexibility up to 25% at contracting and during contract currency

  • Delivery period defined from last date of original delivery order with minimum 30 days

  • Extension of delivery time follows calculated formula and may extend to original delivery period

Important Clauses

Payment Terms

Payment terms are not detailed in the excerpt; bidders should verify in the ATC/documentation and terms.

Delivery Schedule

Delivery timeline begins from the last date of the original DO; extensions follow option clause calculations with a minimum 30 days.

Penalties/Liquidated Damages

No LD details provided; bidders should confirm LD/penalties in full terms.

Bidder Eligibility

  • Experience in supplying differential pressure instrumentation to oil/gas or BPCL-scale needs

  • Valid GST and PAN with financial stability demonstrating bid readiness

  • OEM authorization for differential pressure gauges/switches (if required by OEM terms)

Tender Data

Bid Details

Quantity

47

Category

59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer , 59.80.79.743.5 Switch Diff.Press 0.2 4 Kg cm2 switzer , 60.32.89.749.5SWITCH PR SWITZER GE 201 02 0 50KG CM2 , 59.80.79.740.5 DIFFERENTIAL PR GAUGE SWITZER 0 4 KG CM , 59.80.79.739.5 DIFFERENTIAL PR GAUGE SWITZER 0 2.5KG CM

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

56

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400071

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Neha Dilip Malve400071,BHARAT PETROLEUM CORPN LTD MUMBAI REFINERY , MAHUL , CHEMBURMumbai SuburbanMaharashtra4000711056-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9840111.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer

59.80.79.742.5 Switch Diff.Press 0.1 1.5 bar switzer

10 piece Delivery: 56 days
#2

59.80.79.743.5 Switch Diff.Press 0.2 4 Kg cm2 switzer

59.80.79.743.5 Switch Diff.Press 0.2 4 Kg cm2 switzer

20 piece Delivery: 56 days
#3

60.32.89.749.5SWITCH PR SWITZER GE 201 02 0 50KG CM2

60.32.89.749.5 SWITCH PR SWITZER GE 201 02 0 50KG CM2

5 piece Delivery: 56 days
#4

59.80.79.740.5 DIFFERENTIAL PR GAUGE SWITZER 0 4 KG CM

59.80.79.740.5 DIFFERENTIAL PR GAUGE SWITZER 0 4 KG CM

6 piece Delivery: 56 days
#5

59.80.79.739.5 DIFFERENTIAL PR GAUGE SWITZER 0 2.5KG CM

59.80.79.739.5 DIFFERENTIAL PR GAUGE SWITZER 0 2.5KG CM

6 piece Delivery: 56 days

Categories 3

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar instrumentation supply

4

Financial statements / turnover proof

5

EMD deposit proof (as applicable under terms)

6

Technical bid documents showing compliance with differential pressure gauges/switches

7

OEM authorization or dealer authorization documents (if OEM-specific)

8

Technical compliance certificates (if any) referenced in ATC

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for Mumbai BPCL pressure gauge tender 2026?

Bidders should review the ATC, ensure OEM authorization, and submit GST, PAN, and experience certificates. Provide technical bid for differential pressure gauges and switches, with documentation showing ability to supply up to 25% additional quantity and compliance with delivery extension terms plus the last DO date delivery rule.

What documents are required for BPCL instrumentation tender in Mumbai?

Submit GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD proof, technical bid, OEM authorizations, and any applicable compliance certificates. Ensure all documents align with the buyer's ATC terms and the provision for option quantity.

What are the key technical specs for BPCL pressure switches tender Maharashtra?

Key specs include differential pressure switches ranging from 0.1–1.5 bar and 0.2–4 KG/cm², with some items up to 50 KG/cm², and references to Switzer/GE 201 variants. Provide OEM-approved, ISI/IS standards-compliant options if required by terms.

When is the delivery timeline for BPCL Mumbai instrumentation order?

Delivery starts from the last date of the original delivery order. The option clause allows up to 25% quantity variations and extensions calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.

What is the supplier eligibility for BPCL Mumbai pressure equipment tender?

Eligibility includes prior experience in supplying differential pressure devices, valid GST/PAN, financial robustness, and OEM authorizations if applicable. Bidders must comply with the ATC and option-quantity terms to qualify.

What standards or certifications are required for BPCL pressure devices tender?

The tender implies quality/compliance for pressure instrumentation; bidders should reference IS/ISO where applicable and provide OEM authorization certificates; verify any explicit standard numbers in the ATC document and terms.

How to verify OEM authorization for BPCL differential pressure equipment?

Check the ATC and supplier's OEM authorization letter matching the listed model references (Switzer/GE 201). Provide valid authorization to bid on differential pressure gauges and switches used in BPCL procurement.

What is the role of the 25% quantity option in BPCL tender?

The buyer may increase/decrease quantities by up to 25% at contract placement and during currency. Bidders should plan stock, confirm pricing for variations, and align delivery schedules to potential quantity changes.