Bid Publish Date
08-Sep-2026, 8:32 am
Bid End Date
18-Sep-2026, 9:00 am
Location
Progress
The Indian Coast Guard intends to procure Repair and Overhauling Service - cars and manufacture of AC condenser end cover with on-site measurement requirements and material parity to existing system. The scope includes removal/refitting of the condenser end cover, inclusion of consumables and mandatory spares, and an anode provision with one new anode supplied with the end cover. A pre-bid meeting is mandatory to address defect criticality and scope clarity. The contract offers scope modification up to 50% of quantity or duration, subject to bidder consent. This procurement targets timely, site-specific execution and material integrity for onboard cooling systems.
End cover manufacturing: material must be identical to existing system material
Anode: one anode supplied with newly manufactured end cover
On-site measurements: all dimensional verification performed at location
Removal/refit: included as part of scope with associated consumables
Pre-bid meeting: mandatory attendance and certificate required
50% quantity/duration variation allowed
Mandatory pre-bid meeting with certificate
End cover material must match original system material
Not specified in data
Not specified in data
Not specified in data
Eligibility criteria not specified in data
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
10 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair and Overhauling Service - cars; E 436 Manufacturing of AC Condenser End Cover; No; Buyer Premises
Pre-Bid Date
11-09-2026 11:00:00
Pre-Bid Venue
ICGS Rajveer
Delivery Locations
1
Delivery Cities
South Andaman
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | South Andaman | South Andaman | - | - | 1 | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about ANDAMAN & NICOBAR tender market
Bidders must attend the mandatory pre-bid meeting, confirm scope with ship staff, and submit the bid with on-site measurement reports. Ensure end cover material parity, include one anode with the new cover, and plan for up to 50% quantity/duration variation if the contract is issued. Ensure design compliance.
Though not specified, bidders should prepare organization credentials, GST, PAN, experience certificates, financial statements, and OEM authorizations. Include technical compliance documents demonstrating material parity and manufacturing capabilities for AC condenser end covers, plus pre-bid meeting certificate.
End cover must use the same material as fitted in the system; no substitutes. Supply one anode with the new end cover. All measurements must be undertaken on site with no sample provided, and installation should follow the original design specifications.
Pre-bid meeting attendance is mandatory and a certificate must be enclosed with the bid. The session addresses critical defect scope and ensures agreement on the on-site measurement process and material parity requirements.
Scope includes removal and refit of the condenser end cover, associated inputs and consumables, on-site measurements, and manufacturing of the end cover using the same material as the original system, with anode installation per design.
Yes. The buyer may increase contract quantity or duration up to 50 percent at contract issuance, and up to 50 percent thereafter, subject to bidder consent and service scope feasibility for the repair and manufacturing work.