TenderDekho Logo
Active GEM

Indian Air Force Stahlwille Tool Trolley Tender 2026 Maharashtra Procurement

Bid Publish Date

09-Sep-2026, 2:06 pm

Bid End Date

21-Sep-2026, 9:00 am

Progress

Issue09-Sep-2026, 2:06 pm
AwardPending

Tender Overview

Indian Air Force invites bids for a Stahlwille tool trolley under a government procurement process. The tender currently provides no detailed specifications or BOQ items, indicating a broad equipment category rather than a fixed model. The category focus is on a portable, organized tool trolley suitable for maintenance operations. A key differentiator is the explicit quantity option clause allowing up to 25% increase/decrease at contract award and during currency of the contract, at contracted rates. The absence of start/end dates requires bidders to prepare for alignment with the government’s delivery framework while ensuring compliance with the ATC document uploaded by the buyer and the general procurement processes for the Indian Air Force.

Technical Specifications & Requirements

  • Product: Stahlwille tool trolley as the primary procurement object
  • No BOQ items or explicit quantity disclosed; bidders must infer scope from standard maintenance workshop trolley needs
  • Important commercial terms present: quantity variation up to 25%, delivery period calculated from extended/original dates, minimum extension time of 30 days if needed
  • Delivery timing is linked to the last date of the original delivery order; extended periods apply when option clause is exercised
  • An ATC document is uploaded by the buyer and must be reviewed for any hidden or supplementary requirements
  • The buyer reserves rights to modify quantity and schedule within the stated contract framework; bidders should prepare for flexible scheduling and pricing adjustments

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity by up to 25% of bid quantity at contract placement and during currency
  • Delivery Timeframe: Additional time calculation based on (Extended/Original quantity) × (Original delivery period), minimum 30 days; extended time may be allowed up to original delivery period
  • Delivery Commencement: From the last date of the original delivery order; extended periods start from last date of extended period
  • Bidders must comply with the option clause and general procurement terms; review ATC document uploaded by buyer for any additional conditions
  • Specific EMD, GST, PAN, or warranty details are not disclosed in the provided data; bidders should await final tender terms and ATC documents

Key Specifications

    • Product name: Stahlwille tool trolley
    • Category: Tool trolley for maintenance operations
    • Quantity: Not disclosed; subject to up to 25% change during contract
    • Estimated value: Not specified
    • Delivery terms: Based on last date of original delivery order; extended delivery based on option clause with minimum 30 days
    • Standards/Certification: Not specified in the provided data; check ATC document for specifics
    • OEM/Brand: Stahlwille brand implied by product name; no explicit brand requirement stated beyond product name

Terms & Conditions

  • Quantity flexibility: up to 25% increase/decrease at contract award and during currency

  • Delivery extensions: calculated via (extended/original quantity) × original period with minimum 30 days

  • ATC/document review: bidders must examine the uploaded ATC for additional terms

Important Clauses

Payment Terms

Not specified in the provided data; review ATC for any payment milestones or terms

Delivery Schedule

Delivery period commences from the last date of the original delivery order; extended delivery time follows the option clause with minimum 30 days

Penalties/Liquidated Damages

Not specified; bidders should consult ATC for LD clauses or performance penalties

Bidder Eligibility

  • Eligibility criteria not disclosed in the provided tender data; bidders should verify ATC and organization-specific requirements

  • Must comply with the option clause and delivery flexibility terms

  • Adequate technical capability to supply Stahlwille tool trolley and handle potential quantity fluctuations

Tender Data

Bid Details

Quantity

2

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

STAHLWILLE TOOL TROLLEY

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

RANGAREDDY

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-RANGAREDDYRANGAREDDY--230-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9765342.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Air Force

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

How to bid for Stahlwille tool trolley tender in India Air Force 2026

Bidders should review the uploaded ATC, confirm product scope for the Stahlwille tool trolley, and prepare to satisfy quantity variation terms up to 25%. Gather GST, PAN, and prior supplier references for workshop equipment; align pricing with potential delivery extensions and maintain compliance with delivery terms.

What documents are required for IAF tool trolley procurement bids

Submit vendor registration, GST certificate, PAN card, and valid financial statements. Include prior experience certificates for similar workshop equipment, OEM authorizations for Stahlwille products, and any technical compliance certificates required by the ATC; ensure the EMD, if applicable, is ready per tender guidance.

What are the delivery terms for the IAF Stahlwille trolley tender

Delivery begins after the last date of the original delivery order; if the contract allows quantity expansion, the extended delivery period is calculated as (Extended quantity / Original quantity) × Original delivery period, with a minimum of 30 days.

What is the impact of the 25% quantity option clause in this tender

Purchaser may adjust the ordered quantity by up to 25% at contract award and during the contract term at contracted rates; bidders should plan for flexible manufacturing and logistics, with pricing valid for the extended period as per the option clause.

Are there any brand or OEM requirements for the tool trolley

The tender mentions the product as a Stahlwille tool trolley; while explicit brand-only requirements are not stated, ensure authenticity via OEM authorizations and confirm product conformity with Stahlwille specifications through the ATC.

What standards or certifications are required for this procurement

Specific standards are not listed in the data; bidders must review the ATC document for any required certifications or conformity marks, and verify if IS or ISO standards apply to Stahlwille tool trolleys as per the buyer’s ATC guidelines.

When is the bid submission deadline for the IAF trolley tender

The provided data does not include dates; bidders should check the official portal for the ATC document and subsequent tender notices to confirm the submission deadline and required bid formats.

What is the payment terms for the IAF tool trolley supply contract

Payment terms are not specified in the extract; bidders must refer to the ATC document for milestones, advances, or post-delivery payment conditions and ensure compliance with government procurement norms.

Explore More Opportunities

Quick Access