Bid Publish Date
25-Aug-2026, 7:22 pm
Bid End Date
15-Sep-2026, 8:00 pm
EMD
₹7,000
Value
₹7,08,000
Location
Progress
Public procurement opportunity for Uttar Pradesh Power Corporation Limited (uppcl) Industrial Ethernet Switch (V2) (Q2) in GAUTAM BUDDHA NAGAR, UTTAR PRADESH. Quantity: 4 issued by. Submission Deadline: 15-09-2026 20: 00: 00. View full details and respond.
Quantity
4
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
OEM Avg. Turnover
3
Past Performance
50 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Industrial Ethernet Switch (V2) (Q2)
Advisory Bank
PUNJAB NATIONAL BANK
ePBG Percentage
5%
ePBG Duration (Months)
12
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Gautam Buddha Nagar
Delivery Pincodes
201301
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Purnesh Rao | 201301,ELECTRICITY TRANSMISSION SUB DIVISION-I NOIDA | Gautam Buddha Nagar | Uttar Pradesh | 201301 | 4 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
CATALOG Specification
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Port Configuration | Total Copper Ethernet Ports | 4, 8, 16, 24 Or higher |
| Port Configuration | Copper Port Speed | 10/100 Mbps, 10/100/1000 Mbps, 1G/2.5G, 1G/2.5G/5G, 1G/2.5G/5G/10G Or higher |
| Port Configuration | Fibre / Uplink Interface | No Fibre/Uplink Interface, 100Mbps SFP, 1G SFP, 10G SFP+ Or higher |
| Port Configuration | Number of Fibre / Uplink Ports | Not Applicable, 2 Ports, 4 Ports, 8 Ports Or higher |
| Power Features | PoE Power (Per Port) | Non-PoE, PoE up to 15 W, PoE+ up to 30 W, High Power PoE up to 60 W, High Power PoE up to 90 W Or higher |
| Power Features | Total PoE Power Budget Band (in Watt) | Not Applicable, Up to 60, 61 to 120, 121 to 240, 241 to 480, 481 to 720 Or higher |
| Power Features | Industrial Power Input and Connector | Single DC Terminal Block Input, Dual Redundant DC Terminal Block Input, Dual Redundant AC Terminal Input |
| Deployment Features | Industrial Mounting and Deployment | DIN Rail Mounted Industrial Switch, Wall Mounted Industrial Switch, Panel Mounted Industrial Switch, Rack Mounted Hardened Industrial Switch |
| Deployment Features | Enclosure and Ingress Protection | Rugged Metal Enclosure with IP30, Rugged Metal Enclosure with IP40, Rugged Metal Enclosure with IP54, Rugged Metal Enclosure with IP60, Rugged Metal Enclosure with IP65 Or higher |
| Management Features | Switch Management | Unmanaged, Smart/Web Managed, L2 Managed, L3 Managed |
| Compliance | Certification from TEC as per Standard for Generic Requirements (GR)/Interface Requirements (IR) | Yes, No |
| Compliance | Warranty (in Year) | 1, 2, 3 Or higher |