Hindustan Petroleum Corporation Ltd Naukri Mumbai HPCL procurement security equipment? Not applicable here 2026

Bid Publish Date

18-Oct-2026, 8:40 pm

Bid End Date

29-Oct-2026, 3:00 pm

Progress

Issue18-Oct-2026, 8:40 pm
AwardPending

Key Highlights

  • • Option Clause enables ±25% quantity variation at contract placement and during currency
  • • Delivery period ties to last date of original order with calculated extension formula
  • • Mandatory ATC documentation: TReDS Confirmation, Land Border Declaration, QAP Declaration, Integrity Pact
  • • Local Content self-certificate required for Class-I / Class-II local supplier claims

Tender Overview

Organization: Hindustan Petroleum Corporation Ltd, Mumbai, Maharashtra. Product/Service: Procurement items under HPCL tender with 158 BOQ items; no specific technical specs published. Location: Mumbai, Maharashtra 400002. Estimated Value / EMD: Not disclosed. Context: Buyer requires adherence to ATC, TReDS confirmation, local content self-certificate for local suppliers, and integrity pact alongside standard GST/PAN documentation. Differentiator: Option clause allows ±25% quantity variation, with delivery timing tied to the original delivery order and extended period. This tender emphasizes governance checks (Land Border Declaration, Integrity Pact) and local content certification. Unique aspects: HPCL ATC and TReDS compliance, 25% quantity flexibility, and mandatory local supplier declarations.

Technical Specifications & Requirements

  • Status: No detailed product specifications published in the provided data.
  • Documentation requirements: Duly filled-in, signed copies of multiple documents including Bidder Declaration for Ban/Deviation, TReDS Confirmation, Land Border Declaration, QAP Declaration, Integrity Pact, and Local Content self-certificate if applicable.
  • BOQ: 158 total items, with item details listed as N/A in the provided snippet, indicating a broad procurement scope rather than a single-item list.
  • Delivery/Scope implication: Delivery period linked to original delivery order; quantity may be increased up to 25% during contract with a calculative extension rule.
  • Compliance framework: Includes ATC, commercial terms, and QAP declarations; emphasizes integrity and border declarations for eligibility.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% at contract; delivery extension formula described with a minimum of 30 days unless original period exceeds that.
  • ATC/Declarations: Submit filled copies of Bidder Declaration for Ban/Deviation, TReDS Confirmation, Land Border Declaration, QAP Declaration, Integrity Pact, and Local Content self-certificate where applicable.
  • Documentation: A comprehensive set of forms and declarations required at bid submission; no specific EMD value provided in the snippet.
  • Local content: HPCL format Local Content self-certificate required for Class-I/Class-II local supplier claims.
  • Compliance baseline: Bidders must comply with all Buyer Added Terms and Conditions (ATC and others) to participate.

Key Specifications

  • Product names and exact BOQ item descriptions not provided in data

  • Delivery period linked to original delivery order; extended delivery time formula present

  • Quantity variation up to 25% during contract and currency of contract

  • Number of BOQ items: 158

  • Mandatory declarations: Integrity Pact, ISI/ISO requirements not specified

  • Local content certification required for preference eligibility

Terms & Conditions

  • 25% quantity variation allowed during and after contract

  • Delivery period adjustments based on original and extended periods with minimum 30 days

  • Comprehensive ATC and compliance declarations required at bid submission

  • Local content self-certificate mandatory for local supplier preference claims

  • Integrity Pact and border declarations are mandatory

Important Clauses

Payment Terms

Not disclosed in provided data; terms to be specified in HPCL ATC/Commercial Terms document

Delivery Schedule

Delivery begins from last date of original delivery order; extra time is (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not detailed in the provided data; to be defined in Commercial Terms

Bidder Eligibility

  • Must submit all specified declarations and certificates as per HPCL ATC

  • Possess GST registration and PAN as a baseline documentation

  • Compliance with Land Border Declaration and Integrity Pact required

Advertisement

Tender Data

Bid Details

Quantity

14265

Category

FLNG,BLND,B16.5,CS,CL150,RF,NACE,0.75IN

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

56

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400071

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sagar Ramesh Daberao400071,HPCL, Mumbai Refinery, B.D.Patil Marg, Mahul Road, Mumbai-400074.Mumbai SuburbanMaharashtra4000719056-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10054669.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 158 Items Sign in for GEM prices

#1

FLNG,BLND,B16.5,CS,CL150,RF,NACE,0.75IN

Flange, BLIND RF, 0.75 Inch, 150 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

90 pieces Delivery: 56 days
#2

FLNG,BLND,B16.5,CS,CL300,0.75IN

Flange, Blind, 0.75 INCH, 300 POUND, CS, Service- Hydrogen, ASTM A-105, Dim Std. ANSI B16.5

70 pieces Delivery: 56 days
#3

FLNG,BLND,CS,CL150,10IN

Flange, Blind, 10 INCH, 150 POUND, CS, ASTM A-105

3 pieces Delivery: 56 days
#4

FLNG,BLND,CS,CL150,1.5IN

Flange, Blind, 1.5 INCH, 150 POUND, CS, ASTM A-105

182 pieces Delivery: 56 days
#5

FLNG,BLND,CS,CL150,12IN

Flange, Blind, 12 INCH, 150 POUND, CS, ASTM A-105

22 pieces Delivery: 56 days
#6

FLNG,BLND,CS,CL150,1IN

Flange, Blind, 1 INCH, 150 POUND, CS, ASTM A-105

63 pieces Delivery: 56 days
#7

FLNG,BLND,CS,CL150,2IN

Flange, Blind, 2 INCH, 150 POUND, CS, ASTM A-105

59 pieces Delivery: 56 days
#8

FLNG,BLND,CS,CL150,3IN

Flange, Blind, 3 INCH, 150 POUND, CS, ASTM A-105

140 pieces Delivery: 56 days
#9

FLNG,BLND,CS,CL150,4IN

Flange, Blind, 4 INCH, 150 POUND, CS, ASTM A-105

20 pieces Delivery: 56 days
#10

FLNG,BLND,CS,CL150,6IN

Flange, Blind, 6 INCH, 150 POUND, CS, ASTM A-105

45 pieces Delivery: 56 days
#11

FLNG,BLND,CS,CL150,8IN

Flange, Blind, 8 INCH, 150 POUND, CS, ASTM A-105

34 pieces Delivery: 56 days
#12

FLNG,BLND,CS,CL300,10IN

Flange, Blind, 10 INCH, 300 POUND, CS, ASTM A-105

3 pieces Delivery: 56 days
#13

FLNG,BLND,CS,CL300,1.5IN

Flange, Blind, 1.5 INCH, 300 POUND, CS, ASTM A-105

65 pieces Delivery: 56 days
#14

FLNG,BLND,CS,CL300,1IN

Flange, Blind, 1 INCH, 300 POUND, CS, ASTM A-105

50 pieces Delivery: 56 days
#15

FLNG,BLND,CS,CL300,2IN

Flange, Blind, 2 INCH, 300 POUND, CS, ASTM A-105

10 pieces Delivery: 56 days
#16

FLNG,BLND,CS,CL300,0.75IN

Flange, Blind, 0.75 INCH, 300 POUND, CS, ASTM A-105

675 pieces Delivery: 56 days
#17

FLNG,BLND,CS,CL300,4IN

Flange, Blind, 4 INCH, 300 POUND, CS, ASTM A-105

9 pieces Delivery: 56 days
#18

FLNG,BLND,CS,CL300,8IN

Flange, Blind, 8 INCH, 300 POUND, CS, ASTM A-105

5 pieces Delivery: 56 days
#19

FLNG,BLND,IBR,B16.5,CS,CL300,RF,0.75IN

Flange, BLRF, 0.75Inch, 300POUND, ASTM A105, ANSI B-16.5, IBR approved

40 pieces Delivery: 56 days
#20

FLNG,BLND,KCS,CL150,RF,0.75IN

Blind Flange RF, 0.75INCH 150 POUND, KCS, ASTM A-350 LF2

90 pieces Delivery: 56 days
#21

FLNG,BLND,KCS,CL300,RF,0.75IN

Blind Flange RF, 0.75INCH 300 POUND, KCS, ASTM A-350 LF2

60 pieces Delivery: 56 days
#22

FLNG,ORFC,A105,CS,CL300,40,3IN

Flange, Orifice flange, 3 INCH, Sch-40, 300 POUND, CS, ASTM A-105

14 pieces Delivery: 56 days
#23

FLNG,ORFC,A105,CS,CL300,40,4IN

Flange, Orifice flange, 4 INCH, Sch-40, 300 POUND, CS, ASTM A-105

10 pieces Delivery: 56 days
#24

FLNG,ORFC,A105,CS,CL300,80,2IN

Flange, Orifice flange, 2 INCH, Sch-80, 300 POUND, CS, ASTM A-105

8 pieces Delivery: 56 days
#25

FLNG,SO,CS,CL150,RF,0.5IN

Flange, SORF, 0.5 INCH, 150 POUND, CS, ASTM A-105

5 pieces Delivery: 56 days
#26

FLNG,SO,CS,CL150,RF,12IN

Flange, SORF, 12 INCH, 150 POUND, CS, ASTM A-105

30 pieces Delivery: 56 days
#27

FLNG,SO,CS,CL150,RF,14IN

Flange, SORF, 14 INCH, 150 POUND, CS, ASTM A-105

55 pieces Delivery: 56 days
#28

FLNG,SO,CS,CL150,RF,1IN

Flange, SORF, 1 INCH, 150 POUND, CS, ASTM A-105

15 pieces Delivery: 56 days
#29

FLNG,SO,CS,CL150,RF,20IN

Flange, SORF, 20 INCH, 150 POUND, CS, ASTM A-105

7 pieces Delivery: 56 days
#30

FLNG,SO,CS,CL150,RF,2IN

Flange, SORF, 2 INCH, 150 POUND, CS, ASTM A-105

100 pieces Delivery: 56 days
#31

FLNG,SO,CS,CL150,RF,0.75IN

Flange, SORF, 0.75 INCH, 150 POUND, CS, ASTM A-105

175 pieces Delivery: 56 days
#32

FLNG,SO,CS,CL300,RF,1.5IN

Flange, SORF, 1.5 INCH, 300 POUND, CS, ASTM A-105

30 pieces Delivery: 56 days
#33

FLNG,SO,CS,CL300,RF,1IN

Flange, SORF, 1 INCH, 300 POUND, CS, ASTM A-105

50 pieces Delivery: 56 days
#34

FLNG,SO,CS,CL300,RF,2IN

Flange, SORF, 2 INCH, 300 POUND, CS, ASTM A-105

10 pieces Delivery: 56 days
#35

FLNG,SO,CS,CL300,RF,3IN

Flange, SORF, 3 INCH, 300 POUND, CS, ASTM A-105

15 pieces Delivery: 56 days
#36

FLNG,SO,CS,CL300,RF,4IN

Flange, SORF, 4 INCH, 300 POUND, CS, ASTM A-105

15 pieces Delivery: 56 days
#37

FLNG,SO,CS,CL300,RF,6IN

Flange, SORF, 6 INCH, 300 POUND, CS, ASTM A-105

5 pieces Delivery: 56 days
#38

FLNG,SO,CS,CL300,RF,8IN

Flange, SORF, 8 INCH, 300 POUND, CS, ASTM A-105

13 pieces Delivery: 56 days
#39

FLNG,SW,B16.5,CS,CL150,RF,0.5IN

Flange, SWRF, 0.5 Inch, Class 150, CS, ASTM-A105, Dim Std. ANSI B16.5

55 pieces Delivery: 56 days
#40

FLNG,SW,B16.5,CS,CL150,RF,1.5IN

Flange, SWRF, 1.5 Inch, Class 150, CS, ASTM-A105, Dim Std. ANSI B16.5

315 pieces Delivery: 56 days
#41

FLNG,SW,B16.5,CS,CL150,RF,160,0.5IN

Flange, SWRF, 0.5 Inch, Sch-160, 150POUND, ASTM A105, ANSI B-16.5, H2 service

100 pieces Delivery: 56 days
#42

FLNG,SW,B16.5,CS,CL150,RF,160,0.75IN

Flange, SWRF, 0.75Inch, Sch-160, 150POUND, ASTM A105, ANSI B-16.5, H2 service

115 pieces Delivery: 56 days
#43

FLNG,SW,B16.5,CS,CL150,RF,1IN

Flange, SWRF, 1 Inch, Class 150, CS, ASTM-A105, Dim Std. ANSI B16.5

190 pieces Delivery: 56 days
#44

FLNG,SW,B16.5,CS,CL150,RF,0.75IN

Flange, SWRF, 0.75 Inch, Class 150, CS, ASTM-A105, Dim Std. ANSI B16.5

200 pieces Delivery: 56 days
#45

FLNG,SW,B16.5,CS,CL300,RF,1.5IN

Flange, SWRF, 1.5 Inch, 300 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

100 pieces Delivery: 56 days
#46

FLNG,SW,B16.5,CS,CL300,RF,160,0.75IN

Flange, SWRF, 0.75Inch, Sch-160, 300POUND, ASTM A105, ANSI B-16.5, H2 service

40 pieces Delivery: 56 days
#47

FLNG,SW,B16.5,CS,CL300,RF,1IN

Flange, SWRF, 1 Inch, 300 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

20 pieces Delivery: 56 days
#48

FLNG,SW,B16.5,CS,CL3000,RF,1IN

Flange, SWRF, 1 Inch, 3000 Pound, CS, ASTM-A105, Dim Std. ANSI B16.5

35 pieces Delivery: 56 days
#49

FLNG,SW,CS,CL150,RF,160,0.75IN

Flange, 0.75 INCH, sch-160, SWRF, 150 Lb, CS, ASTM A-105

320 pieces Delivery: 56 days
#50

FLNG,SW,CS,CL150,RF,80,1IN

Flange, 1 INCH, sch-80, SWRF, 150 Lb, CS, ASTM A-105

40 pieces Delivery: 56 days
#51

FLNG,SW,CS,CL300,RF,160,0.75IN

Flange, 0.75 INCH, sch-160, SWRF, 300 Lb, CS, ASTM A-105

985 pieces Delivery: 56 days
#52

FLNG,WN,B16.5,CS,CL150,RF,160,1.5IN

Flange, WNRF, 1.5 Inch, SCH160 150 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

10 pieces Delivery: 56 days
#53

FLNG,WN,B16.5,CS,CL150,RF,80,3IN

Flange, WNRF, 3 Inch, SCH80 150 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

10 pieces Delivery: 56 days
#54

FLNG,WN,B16.5,CS,CL150,RF,80,4IN

Flange, WNRF, 4 Inch, SCH80 150 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

30 pieces Delivery: 56 days
#55

FLNG,WN,B16.5,CS,CL150,RF,NACE,160,0.75IN

Flange, WNRF, 0.75 Inch, SCH160 150 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

20 pieces Delivery: 56 days
#56

FLNG,WN,B16.5,CS,CL150,RF,NACE,40,6IN

Flange, WNRF, 6 Inch, SCH40 150 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

30 pieces Delivery: 56 days
#57

FLNG,WN,B16.5,CS,CL300,RF,160,1.5IN

Flange, WNRF, 1.5Inch, Sch-160, 300POUND, ASTM A-105, ANSI B-16.5, NACE conforming to MR0175

5 pieces Delivery: 56 days
#58

FLNG,WN,B16.5,CS,CL300,RF,40,4IN

Flange, WNRF, 4 INCH, Sch-40, 300 POUND, CS, ASTM A-105, Service- Hydrogen, Dim Std. ANSI B16.5

20 pieces Delivery: 56 days
#59

FLNG,WN,B16.5,CS,CL300,RF,80,2IN

Flange, WNRF, 2 INCH, Sch-80, 300 POUND, CS, Service- Hydrogen, ASTM A-105, Dim Std. ANSI B16.5

45 pieces Delivery: 56 days
#60

FLNG,WN,B16.5,CS,CL300,RF,80,3IN

Flange, WNRF, 3 Inch, SCH80 300 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

20 pieces Delivery: 56 days
#61

FLNG,WN,B16.5,CS,CL300,RF,80,4IN

Flange, WNRF, 4 Inch, SCH80 300 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

30 pieces Delivery: 56 days
#62

FLNG,WN,B16.5,CS,CL300,RF,80,6IN

Flange, WNRF, 6 Inch, SCH80 300 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

10 pieces Delivery: 56 days
#63

FLNG,WN,B16.5,CS,CL300,RF,NACE,160,2IN

Flange, WNRF, 2 Inch, SCH160 300 Pound, CS, ASTM-A105, NACE, Dim Std. ANSI B16.5

76 pieces Delivery: 56 days
#64

FLNG,WN,CS,CL150,RF,160,1.5IN

Flange, WNRF, 1.5 INCH, Sch-160, 150 POUND, CS, ASTM A-105

175 pieces Delivery: 56 days
#65

FLNG,WN,CS,CL150,RF,160,1IN

Flange, WNRF, 1 INCH, Sch-160, 150 POUND, CS, ASTM A-105

270 pieces Delivery: 56 days
#66

FLNG,WN,CS,CL150,RF,40,10IN

Flange, WNRF, 10 INCH, Sch-40, 150 POUND, CS, ASTM A-105

59 pieces Delivery: 56 days
#67

FLNG,WN,CS,CL150,RF,40,18IN

Flange, WNRF, 18 INCH, Sch-40, 150 POUND, CS, ASTM A-105

18 pieces Delivery: 56 days
#68

FLNG,WN,CS,CL150,RF,40,20IN

Flange, WNRF, 20 INCH, Sch-40, 150 POUND, CS, ASTM A-105

8 pieces Delivery: 56 days
#69

FLNG,WN,CS,CL150,RF,40,6IN

Flange, WNRF, 6 INCH, Sch-40, 150 POUND, CS, ASTM A-105

413 pieces Delivery: 56 days
#70

FLNG,WN,CS,CL150,RF,40,8IN

Flange, WNRF, 8 INCH, Sch-40, 150 POUND, CS, ASTM A-105

234 pieces Delivery: 56 days
#71

FLNG,WN,CS,CL150,RF,80,0.5IN

Flange, WNRF, 0.5 INCH, Sch-80, 150 POUND, CS, ASTM A-105

30 pieces Delivery: 56 days
#72

FLNG,WN,CS,CL150,RF,80,1.5IN

Flange, WNRF, 1.5 INCH, Sch-80, 150 POUND, CS, ASTM A-105

42 pieces Delivery: 56 days
#73

FLNG,WN,CS,CL150,RF,80,1IN

Flange, WNRF, 1 INCH, Sch-80, 150 POUND, CS, ASTM A-105

83 pieces Delivery: 56 days
#74

FLNG,WN,CS,CL150,RF,80,2IN

Flange, WNRF, 2 INCH, Sch-80, 150 POUND, CS, ASTM A-105

1,309 pieces Delivery: 56 days
#75

FLNG,WN,CS,CL150,RF,80,4IN

Flange, WNRF, 4 INCH, Sch-80, 150 POUND, CS, ASTM A-105

15 pieces Delivery: 56 days
#76

FLNG,WN,CS,CL150,RF,80,6IN

Flange, WNRF, 6 INCH, Sch-80, 150 POUND, CS, ASTM A-105

20 pieces Delivery: 56 days
#77

FLNG,WN,CS,CL150,RF,80,8IN

Flange, WNRF, 8 INCH, Sch-80, 150 POUND, CS, ASTM A-105

10 pieces Delivery: 56 days
#78

FLNG,WN,CS,CL150,RF,NACE,40,3IN

Flange, WNRF, 3INCH, Sch-40, 150POUND, CS, ASTM A 105, NACE

50 pieces Delivery: 56 days
#79

FLNG,WN,CS,CL150,RF,NACE,80,2IN

Flange, WNRF, 2INCH, Sch-80, 150POUND, CS, ASTM A 105, NACE

88 pieces Delivery: 56 days
#80

FLNG,WN,CS,CL150,RF,STD,12IN

Flange, WNRF, 12 INCH, Standard weight, 150 POUND, CS, ASTM A-105

39 pieces Delivery: 56 days
#81

FLNG,WN,CS,CL300,RF,160,1IN

Flange, WNRF, 1 INCH, Sch-160, 300 POUND, CS, ASTM A-105

10 pieces Delivery: 56 days
#82

FLNG,WN,CS,CL300,RF,160,2IN

Flange, WNRF, 2 INCH, Sch-160, 300 POUND, CS, ASTM A-105

10 pieces Delivery: 56 days
#83

FLNG,WN,CS,CL300,RF,40,10IN

Flange, WNRF, 10 INCH, Sch-40, 300 POUND, CS, ASTM A-105

96 pieces Delivery: 56 days
#84

FLNG,WN,CS,CL300,RF,40,3IN

Flange, WNRF, 3 INCH, Sch-40, 300 POUND, CS, ASTM A-105

159 pieces Delivery: 56 days
#85

FLNG,WN,CS,CL300,RF,40,4IN

Flange, WNRF, 4 INCH, Sch-40, 300 POUND, CS, ASTM A-105

269 pieces Delivery: 56 days
#86

FLNG,WN,CS,CL300,RF,40,6IN

Flange, WNRF, 6 INCH, Sch-40, 300 POUND, CS, ASTM A-105

218 pieces Delivery: 56 days
#87

FLNG,WN,CS,CL300,RF,40,8IN

Flange, WNRF, 8 INCH, Sch-40, 300 POUND, CS, ASTM A-105

134 pieces Delivery: 56 days
#88

FLNG,WN,CS,CL300,RF,80,0.5IN

Flange, WNRF, 0.5 INCH, Sch-80, 300 POUND, CS, ASTM A-105

25 pieces Delivery: 56 days
#89

FLNG,WN,CS,CL300,RF,80,1IN

Flange, WNRF, 1 INCH, Sch-80, 300 POUND, CS, ASTM A-105

10 pieces Delivery: 56 days
#90

FLNG,WN,CS,CL300,RF,80,2IN

Flange, WNRF, 2INCH, Sch-80, 300POUND, CS, ASTM A 105, NACE

50 pieces Delivery: 56 days
#91

FLNG,WN,CS,CL300,RF,80,0.75IN

Flange, WNRF, 0.75 INCH, Sch-80, 300 POUND, CS, ASTM A-105

35 pieces Delivery: 56 days
#92

FLNG,WN,CS,CL300,RF,80,3IN

Flange, WNRF, 3 INCH, Sch-80, 300 POUND, CS, ASTM A-105

65 pieces Delivery: 56 days
#93

FLNG,WN,CS,CL300,RF,80,4IN

Flange, WNRF, 4 INCH, Sch-80, 300 POUND, CS, ASTM A-105

20 pieces Delivery: 56 days
#94

FLNG,WN,CS,CL300,RF,80,8IN

Flange, WNRF, 8 INCH, Sch-80, 300 POUND, CS, ASTM A-105

10 pieces Delivery: 56 days
#95

FLNG,WN,CS,CL300,RF,NACE,80,8IN

Flange, WNRF, 8INCH, Sch-80, 300POUND, CS, ASTM A 105, NACE

9 pieces Delivery: 56 days
#96

FLNG,WN,CS,CL600,RF,40,4IN

Flange, WNRF, 4 INCH, Sch-40, 600 POUND, CS, ASTM A-105

25 pieces Delivery: 56 days
#97

FLNG,WN,KCS,CL150,RF,40,3IN

Flange, WNRF, 3 INCH, Sch-40, 150 POUND, KCS, ASTM A-350 LF2

10 pieces Delivery: 56 days
#98

FLNG,WN,KCS,CL150,RF,80,2IN

Flange, WNRF, 2 INCH, Sch-80, 150 POUND, KCS, ASTM A-350 LF2

12 pieces Delivery: 56 days
#99

FLNG,WN,KCS,CL300,RF,40,2IN

Flange, WNRF, 2 INCH, Sch-40, 300 POUND, KCS, ASTM A-350 LF2

10 pieces Delivery: 56 days
#100

FLNG,WN,KCS,CL300,RF,40,4IN

Flange, WNRF, 4 INCH, Sch-40, 300 POUND, KCS, ASTM A-350 LF2

15 pieces Delivery: 56 days
#101

FLNG,WN,KCS,CL300,RF,80,2IN

Flange, WNRF, 2 INCH, Sch-80, 300 POUND, KCS, ASTM A-350 LF2

21 pieces Delivery: 56 days
#102

FLANGE, 1.5 INCH, SCH-80, SWRF, 300 L

Flange, 1.5 INCH, sch-80, SWRF, 300 Lb, CS, ASTM A-105

95 pieces Delivery: 56 days
#103

FLANGE, 1.5 INCH, SCH-80, SWRF, 150 L

Flange, 1.5 INCH, sch-80, SWRF, 150 Lb, CS, ASTM A-105

40 pieces Delivery: 56 days
#104

FLANGE, 1 INCH, SCH-80, SWRF, 300 LB, C

Flange, 1 INCH, sch-80, SWRF, 300 Lb, CS, ASTM A-105

140 pieces Delivery: 56 days
#105

FLNG,BLND,B16.5,A105,CL300,RF,0.75IN,H2

Flange, BLRF, 0.75Inch, 300POUND, ASTM A105, ANSI B-16.5, H2 service

30 pieces Delivery: 56 days
#106

FLNG,BLND,B16.5,A105,CL150,RF,3IN,FIG8

Flange, FIG8 BLIND RF, 3 Inch, 150 Pound, CS, ASTM-A105, Dim Std. ANSI B16.5

5 pieces Delivery: 56 days
#107

FLANGE, BLIND RF, 0.75 INCH, 150 POUND

Flange, BLIND RF, 0.75 Inch, 150 Pound, CS, ASTM-A105, Dim Std. ANSI B16.5

410 pieces Delivery: 56 days
#108

FLANGE, BLIND RF, 0.5 INCH, 300 POUND

Flange, BLIND RF, 0.5 Inch, 300 Pound, CS, ASTM-A105, Dim Std. ANSI B16.5

50 pieces Delivery: 56 days
#109

FLNG,BLND,B16.5,CS,A105,CL150,RF,0.5IN

Flange, BLIND RF, 0.5 Inch, 150 Pound, CS, ASTM-A105, Dim Std. ANSI B16.5

55 pieces Delivery: 56 days
#110

FLANGE, SORF, 24 INCH, 150 POUND, CS

Flange, SORF, 24 INCH, 150 POUND, CS, ASTM A-105

8 pieces Delivery: 56 days
#111

FLNG,SO,CS,A105,CL150,RF,10IN

Flange, SORF, 10 INCH, 150 POUND, CS, ASTM A-105

64 pieces Delivery: 56 days
#112

FLNG,SO,CS,A105,CL150,RF,8IN

Flange, SORF, 8 INCH, 150 POUND, CS, ASTM A-105

126 pieces Delivery: 56 days
#113

FLNG,SO,CS,A105,CL150,RF,4IN

Flange, SORF, 4 INCH, 150 POUND, CS, ASTM A-105

99 pieces Delivery: 56 days
#114

FLNG,SO,CS,A105,CL150,RF,3IN

Flange, SORF, 3 INCH, 150 POUND, CS, ASTM A-105

260 pieces Delivery: 56 days
#115

FLANGE, WNRF, 2 INCH, EXTRA STRONG, 300

Flange, WNRF, 2 INCH, Extra strong, 300 POUND, CS, ASTM A-105

1,002 pieces Delivery: 56 days
#116

FLANGE, WNRF, 4 INCH, SCH-40, 150 POUND

Flange, WNRF, 4 INCH, Sch-40, 150 POUND, CS, ASTM A-105

708 pieces Delivery: 56 days
#117

FLANGE, WNRF, 3 INCH, SCH-40, 150 POUND

Flange, WNRF, 3 INCH, Sch-40, 150 POUND, CS, ASTM A-105

770 pieces Delivery: 56 days
#118

FLNG,THD,CS,A105,CL150,RF,0.75IN

Flange, RF, Threaded, 0.75 INCH, 150 POUND, CS, ASTM A-105

50 pieces Delivery: 56 days
#119

FLNG,LAP JNT,B16.5,CS,A105,CL150,FF,2IN

Flange, Lap Joint FF, 2 Inch, 150 Pound, CS, ASTM-A105, Dim Std. ANSI B16.5

125 pieces Delivery: 56 days
#120

FLNG,WN,IBR,CS,A105,CL300,RF,80,2IN

Flange, WNRF(IBR certified), 2 INCH, Sch-80, 300 POUND, CS, ASTM A-105

40 pieces Delivery: 56 days
#121

FLNG,WN,IBR,B16.5,CS,CL300,RF,STD,8IN

Flange, WNRF, 8 INCH, Sch.-STD, 300 POUND, 125AARH, CS, ASTM A 105, Dim. Std. B 16.5, IBR Approved

5 pieces Delivery: 56 days
#122

FLNG,WN,IBR,B16.5,CS,CL300,RF,STD,6IN

Flange, WNRF, 6 INCH, Sch.-STD, 300 POUND, 125AARH, CS, ASTM A 105, Dim. Std. B 16.5, IBR Approved

46 pieces Delivery: 56 days
#123

FLNG,WN,IBR,B16.5,CS,CL300,RF,STD,4IN

Flange, WNRF, 4 INCH, Sch.-STD, 300 POUND, 125AARH, CS, ASTM A 105, Dim. Std. B 16.5, IBR Approved

21 pieces Delivery: 56 days
#124

FLNG,WN,IBR,B16.5,CS,CL150,RF,STD,4IN

Flange, WNRF, 4 INCH, Sch.-STD, 150 POUND, 125AARH, CS, ASTM A 105, Dim. Std. B 16.5, IBR Approved

15 pieces Delivery: 56 days
#125

FLNG,WN,IBR,B16.5,CS,CL300,RF,STD,3IN

Flange, WNRF, 3 INCH, Sch.-STD, 300 POUND, 125AARH, CS, ASTM A 105, Dim. Std. B 16.5, IBR Approved

65 pieces Delivery: 56 days
#126

FLNG,WN,IBR,B16.5,CS,CL150,RF,STD,3IN

Flange, WNRF, 3 INCH, Sch.-STD, 150 POUND, 125AARH, CS, ASTM A 105, Dim. Std. B 16.5, IBR Approved

30 pieces Delivery: 56 days
#127

FLNG,WN,IBR,B16.5,CS,CL150,RF,XS,2IN

Flange, WNRF, 2 INCH, Sch.-XS, 150 POUND, 125AARH, CS, ASTM A 105, Dim. Std. B 16.5, IBR Approved

26 pieces Delivery: 56 days
#128

FLNG,BLND,IBR,B16.5,CS,CL300,RF,6IN

Flange, BLRF, 6 INCH, 300 POUND, 125AARH, CS, ASTM A 105, Dim. Std. B 16.5, IBR Approved

5 pieces Delivery: 56 days
#129

FLNG,BLND,IBR,B16.5,CS,CL300,RF,4IN

Flange, BLRF, 4 INCH, 300 POUND, 125AARH, CS, ASTM A 105, Dim. Std. B 16.5, IBR Approved

15 pieces Delivery: 56 days
#130

FLNG,BLND,IBR,B16.5,CS,A105,CL150,0.75IN

Flange, Blind, 0.75 INCH, 150 POUND, CS, ASTM A 105, Service- IBR, Dim. Std. ASME B16.5

20 pieces Delivery: 56 days
#131

FLNG,BLND,B16.5,CS,A105,CL150,RF,0.75IN

Flange, BLIND RF, 0.75 Inch, 150 Pound, CS, ASTM-A105, Galvanised, Dim Std. ANSI B16.5

25 pieces Delivery: 56 days
#132

FLNG,SO,CS,A105,CL300,RF,NACE,1IN

Flange, SORF, 1INCH, SCH-80, 300POUND, CS, ASTM A 105, NACE

10 pieces Delivery: 56 days
#133

FLNG,SO,CS,A105,CL150,RF,6IN

Flange, SORF, 6 INCH, 150 POUND, CS, ASTM A-105

60 pieces Delivery: 56 days
#134

FLNG,SW,CS,A105,CL150,RF,NACE,0.75IN

Flange, Socket Weld, 0.75 INCH, 150 POUND, CS, ASTM A 105, NACE

40 pieces Delivery: 56 days
#135

FLNG,SW,CS,A105,CL300,RF,NACE,160,0.5IN

Flange, SWRF, 0.5INCH, Sch-160, 300POUND, CS, ASTM A 105, NACE

80 pieces Delivery: 56 days
#136

FLNG,BLND,A105,1500,RF,3IN,NACE

Flange, BLRF, 3INCH, 150POUND, CS, ASTM A 105, NACE

20 pieces Delivery: 56 days
#137

FLNG,BLND,A350GRLF2,CL1500,12IN

Flange, Blind, 12 INCH, 150 POUND, KCS, ASTM A-350 LF2

3 pieces Delivery: 56 days
#138

FLNG,BLND,A105,CL1500,24IN

Flange, Blind, 24 INCH, 150 POUND, CS, ASTM A-105

3 pieces Delivery: 56 days
#139

FLNG,BLND,A105,CL1500,18IN

Flange, Blind, 18 INCH, 150 POUND, CS, ASTM A-105

3 pieces Delivery: 56 days
#140

FLNG,BLND,A105,CL1500,16IN

Flange, Blind, 16 INCH, 150 POUND, CS, ASTM A-105

6 pieces Delivery: 56 days
#141

FLNG,WN,A105,CL300,RF,160,1.5IN

Flange, WNRF, 1.5 INCH, Sch-160, 300 POUND, CS, ASTM A-105

45 pieces Delivery: 56 days
#142

FLNG,WN,A105,CL150,RF,160,2IN

Flange, WNRF, 2 INCH, Sch-160, 150 POUND, CS, ASTM A-105

20 pieces Delivery: 56 days
#143

FLANGE,LAP JNT,CS,A105,FF,CL150,3IN

Flange, Lap Joint FF, 3 Inch, 150 Pound, CS, ASTM-A105, Dim Std. ANSI B16.5

5 pieces Delivery: 56 days
#144

FLNG,SW,AS,CL300,RF,160,0.75IN

Flange, SWRF, 0.75 INCH, Sch-160, 300 POUND, AS, ASTM A-182 F5

20 pieces Delivery: 56 days
#145

FLNG,WN,A182GRF5,CL300,RF,80,4IN

Flange, WNRF, 4 INCH, Sch-80, 300 POUND, AS, ASTM A-182 F5

23 pieces Delivery: 56 days
#146

FLNG,BLND,B16.5,SS,CL150,RF,0.75IN

Flange, BLIND RF, 0.75 Inch, 150 Pound, SS, ASTM-A182GRF304, Dim Std. ANSI B16.5

15 pieces Delivery: 56 days
#147

FLNG,BLND,B16.5,SS,CL150,RF,3IN

Flange, BLIND RF, 3 Inch, 150 Pound, SS, ASTM-A182GRF316L, Dim Std. ANSI B16.5

15 pieces Delivery: 56 days
#148

FLNG,BLND,SS,CL150,RF,0.75IN

Flange, Blind RF, 0.75 INCH, 150 POUND, SS, ASTM A-182 F316L

80 pieces Delivery: 56 days
#149

FLNG,SW,B16.5,SS,CL3000,RF,1IN

Flange, SWRF, 1 Inch, 3000 Pound, SS, ASTM-A182GRF316L, Dim Std. ANSI B16.5

5 pieces Delivery: 56 days
#150

FLNG,SW,SS,CL150,RF,0.75IN

Flange, SWRF, 0.75 INCH, 150 POUND, SS, ASTM A-182 F316L

20 pieces Delivery: 56 days
#151

FLNG,SW,SS,CL150,RF,80S,0.5IN

Flange, SWRF, 0.5 INCH, Sch-80S, 150 POUND, SS, ASTM A-182 F316L

140 pieces Delivery: 56 days
#152

FLNG,SW,SS,CL300,RF,80S,1IN

Flange, SWRF, 1 INCH, Sch-80S, 300 POUND, SS, ASTM A-182 F316L

5 pieces Delivery: 56 days
#153

FLNG,WN,B16.5,SS,CL150,RF,40,1.5IN

Flange, WNRF, 1.5 Inch, SCH40 150 Pound, SS, ASTM-A182GRF316L, Dim Std. ANSI B16.5

64 pieces Delivery: 56 days
#154

FLNG,WN,B16.5,SS,CL150,RF,40,2IN

Flange, WNRF, 2INCH, Sch-40, 150POUND, SS, ASTM A-182 F316 Dim Std. B 16.5

5 pieces Delivery: 56 days
#155

FLNG,SW,CS,A105,CL6000,RF,0.75IN

Flange, SWRF, 0.75 Inch, 6000 Pound, CS, ASTM-A105, Dim Std. ANSI B16.5

10 pieces Delivery: 56 days
#156

FLNG,SW,CS,A105,CL6000,RF,0.5IN

Flange, SWRF, 0.5 Inch, 6000 Pound, CS, ASTM-A105, Dim Std. ANSI B16.5

5 pieces Delivery: 56 days
#157

FLNG,WN,B16.5,AS,CL300,RF,80,2IN

Flange, WNRF, 2 Inch, Sch-80, 300 POUND, AS, ASTM A-182 Gr.F5, Dim. Std. ANSI-B16.5

4 pieces Delivery: 56 days
#158

FLNG,SW,CS,A105,CL150,RF,H2,0.75IN

Flange, SW, 0.75 INCH, 150 POUND, CS, ASTM A-105 H2 Class

20 pieces Delivery: 56 days
Advertisement

Categories 13

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Duly filled-in, complete and signed copies of Bidder Declaration for Ban and Deviation

2

TReDS Confirmation

3

Land Border Declaration

4

Commercial Terms & Conditions

5

QAP Declaration

6

Integrity Pact

7

Local Content self-certificate (HPCL format) for Class-I/Class-II local suppliers

8

GST certificate

9

PAN card

10

Experience certificates (if applicable)

11

Financial statements (as required by HPCL terms)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid on HPCL tender in Mumbai with local content requirements

Bidders must submit all mandatory declarations: Ban/Deviation, TReDS Confirmation, Land Border Declaration, QAP, Integrity Pact, and Local Content self-certificate. Ensure GST registration, PAN, and relevant experience/financial documents are ready. The option clause allows ±25% quantity variation, with delivery extensions calculated from the original period.

What documents are required for HPCL Mumbai procurement bid 2026

Submit filled Bidder Declaration for Ban/Deviation, TReDS Confirmation, Land Border Declaration, QAP Declaration, Integrity Pact, Local Content certificate, GST, PAN, and financial statements. Include any vendor-specific experience certificates and technical compliance proofs as per HPCL ATC.

What is the delivery extension rule for HPCL contract in Mumbai

Delivery extension uses this formula: Additional time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Maximum extension may align with original delivery period while exercising the option clause.

What is the scope of HPCL tender items in Mumbai 2026

The tender includes 158 BOQ items; exact item descriptions are not disclosed in the provided data. Vendors should prepare to address a broad procurement scope and expect to submit declarations and compliance documents for all items as per HPCL ATC.

What are the key compliance declarations for HPCL procurement

Key declarations include Integrity Pact, QAP Declaration, Land Border Declaration, and Local Content self-certificate. Bidders must also adhere to ATC and commercial terms and conditions, submitting signed copies with the bid.

When is the bid submission for HPCL Mumbai tender 2026

Exact bid submission dates are not provided in the snippet. Bidders should monitor HPCL procurement portal for start/end dates and ensure timely submission of all mandatory documents, declarations, and certificates to avoid disqualification.

What standards or certifications are required by HPCL Mumbai tender

The provided data does not specify technical standards like ISI/ISO; however, bidders must submit QAP Declaration and Integrity Pact, with Local Content certification if claiming class-based local supplier benefits.