Bid Publish Date
16-Oct-2026, 12:10 pm
Bid End Date
27-Oct-2026, 11:00 am
Location
Progress
National Fertilizers Limited (NFL) invites bids for the supply of Cummins engine components including screw slotted set, gasket, and rocker lever cover. The procurement is restricted to OEM or their authorized dealers due to proprietary nature, with an interchangeability certificate required. The scope is limited to the supply of goods, not services, and the supplier must confirm materials are one-to-one replacements for existing 810 KVA DG Set components. An option clause allows up to 25% quantity variation at contracted rates, with delivery timing linked to the last delivery order date. The tender emphasizes adherence to OEM authenticity and supply continuity, with no BOQ items defined.
Key items include the screw slotted set for Cummins, gasket, and rocker lever cover for Cummins as proprietary parts. Bidders must provide OEM authorization or dealership certificate and an interchangeability certificate validating one-to-one material replacement. The bid allows a 25% quantity increase/decrease at contracted rates, and delivery periods commence from the last date of the original delivery order, with extension rules quantified by the formula (increase/original) × original period. The ATC requires uploading all applicable certificates to avoid rejection.
Critical terms include: only OEM or authorized dealers may participate; evidence of proprietary material and interchangeability must be provided; scope is limited to supply of goods; an option to adjust quantity by 25% during contract; delivery period starts from the last date of the original delivery order; bidders must upload required certificates and attest to authenticity of offered materials; no explicit EMD value is disclosed in the data.
Key Term 1: Only OEM or authorized dealers may participate; require dealership authorization
Key Term 2: Interchangeability certificate proving one-to-one replacement with existing DG Set components
Key Term 3: 25% quantity variation allowed at contracted rates during/after contract
Key Term 4: Scope limited to supply of goods, no services or installation
Key Term 5: Upload all required certificates; failure leads to rejection
Not specified in data; payment terms to be confirmed with successful bidder per NFL procurement norms.
Delivery period commences from the last date of the original delivery order; option clause may extend delivery time with calculated duration based on (increased quantity ÷ original quantity) × original delivery period, minimum 30 days.
Not provided in data; ensure bidder confirms NFL ATC for LD terms upon contract finalization.
OEM authorization or authorized dealer certificate for Cummins parts
Interchangeability certificate confirming one-to-one replacement
Proof of proprietary nature of items
Ability to supply goods only (no service/installation scope)
Compliance with certificate submission requirements per ATC
Quantity
24
Category
Screw slotted set for Cummins
Bid Type
Single Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
4 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Screw slotted set for Cummins , Gasket, Rocker lever cover for Cummins
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Rupnagar
Delivery Pincodes
140126
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jatinder Kumar Rajput | 140126,National Fertilizers Limited, Naya Nangal | Rupnagar | Punjab | 140126 | 12 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Bidders must be OEM or authorized Cummins dealers, submit OEM authorization along with an interchangeability certificate proving one-to-one replacement for the existing 810 KVA DG Set components, and upload all required certificates. The scope is strictly supply of goods; quantity may vary up to 25% as per option clause.
Submit OEM/dealer authorization, interchangeability certificate, proof of proprietary material, bid document uploads, and certificates requested in ATC. If the offer is from a dealer, provide dealership confirmation and material replacement evidence for existing DG set components.
Items include screw slotted set for Cummins, gasket, and rocker lever cover for Cummins. The supplier must provide one-to-one replacement certification and OEM authenticity; delivery terms align with the last date of the original order and may extend under the option clause.
Delivery starts from the last date of the original delivery order. If the option clause is exercised, extended time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum 30 days allowance.
Primary requirements are OEM authorization/Dealership certificate and interchangeability certificate proving one-to-one replacement. Certificates uploaded per ATC are mandatory; no explicit ISO or BIS standards are mentioned in the data.
NFL may increase/decrease the ordered quantity by up to 25% at contracted rates during contract placement and within the currency period; extended delivery time is calculated using the specified formula, ensuring minimum 30 days for additional time.
Scope is limited to the supply of goods only (no installation or services). Bidders must ensure offered materials are interchangeable with current 810 KVA DG Set components and provide the necessary interchangeability documentation.