TenderDekho Logo
Active GEM

Invitation to Bid - Upgradation of existing SAS at Kurnool SS- Supply Portion,Upgradation of existing SAS at Kurnool SS

Bid Publish Date

03-Jul-2026, 9:31 am

Bid End Date

21-Sep-2026, 11:00 am

Generate Docs

Progress

Issue03-Jul-2026, 9:31 am
Corrigendum10-Sep-2026
AwardPending

A tender has been published for Power Grid Corporation Of India Limited Upgradation of existing SAS at Kurnool SS- Supply Portion, Upgradation of existing SAS at Kurnool SS- Service Portion, Upgradation of existing SAS at Raichur SS- Supply Portion, Upgradation of existing SAS at Raichur SS- Service Portion, Upgradation of existing SAS at Nellore PS- Supply Portion, Upgradation of existing SAS at Nellore PS- Service Portion. Quantity: 177 by. Submission Deadline: 21-09-2026 11: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

177

Category

Upgradation of existing SAS at Kurnool SS- Supply Portion

Bid Type

Single Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Upgradation of existing SAS at Kurnool SS- Supply Portion , Upgradation of existing SAS at Kurnool SS- Service Portion , Upgradation of existing SAS at Raichur SS- Supply Portion , Upgradation of existing SAS at Raichur SS- Service Portion , Upgradation of existing SAS at Nellore PS- Supply Portion , Upgradation of existing SAS at Nellore PS- Service Portion

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

34

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

06-07-2026 15:00:00

Pre-Bid Venue

Online mode

Delivery Details

Max Delivery Days

244

Delivery Locations

1

Delivery Cities

Kurnool

Delivery Pincodes

518010

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Gorkal Nagaraju518010,Power Grid Corporation of India Limited, Kurnool 765 kv SS, near 23 Km Mile Stone, Kurnool-Nandyal Road, Oravakal (PO & Mandal), Kurnool dist, Andhra Pradesh- 518010KurnoolAndhra Pradesh5180109244-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9524063.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Corporate Office Gurgaon

Grievance Contact

[email protected]

Corrigendum Updates

10 Updates
#1

Update

10-Sep-2026

Extended Deadline

21-Sep-2026, 5:30 am

Opening Date

22-Sep-2026, 5:30 am

#2

Update

10-Sep-2026

Extended Deadline

17-Sep-2026, 5:30 am

Opening Date

18-Sep-2026, 5:30 am

#3

Update

31-Aug-2026

Extended Deadline

10-Sep-2026, 5:30 am

Opening Date

10-Sep-2026, 6:00 am

#4

Update

20-Aug-2026

Extended Deadline

31-Aug-2026, 5:30 am

Opening Date

31-Aug-2026, 6:00 am

#5

Update

07-Aug-2026

Extended Deadline

20-Aug-2026, 5:30 am

Opening Date

20-Aug-2026, 6:00 am

#6

Update

05-Aug-2026

Extended Deadline

10-Aug-2026, 5:30 am

Opening Date

10-Aug-2026, 6:00 am

#7

Update

30-Jul-2026

Extended Deadline

04-Aug-2026, 5:30 am

Opening Date

04-Aug-2026, 6:00 am

#8

Update

20-Jul-2026

Extended Deadline

30-Jul-2026, 5:30 am

Opening Date

30-Jul-2026, 6:00 am

#9

Update

20-Jul-2026

Extended Deadline

25-Jul-2026, 5:30 am

Opening Date

25-Jul-2026, 6:00 am

#10

Update

13-Jul-2026

Extended Deadline

20-Jul-2026, 5:30 am

Opening Date

20-Jul-2026, 6:00 am

Bill of Quantities (BOQ) 39 Items Sign in for GEM prices

#1

Upgradation of existing SAS at Kurnool SS- Supply Portion

Supply of industrial grade PC with latest operating System (Windows 11) with 7 Years Support and with PC specifications as mentioned in SCOPE of work i Server- 02 nos ii Client- 02 nos iii Gateway- 02 nos iv DR-EWS PC- 01 no V Historians - 02 Nos

9 no Delivery: 244 days
#2

Upgradation of existing SAS at Kurnool SS- Supply Portion

Supply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications

2 no Delivery: 244 days
#3

Upgradation of existing SAS at Kurnool SS- Supply Portion

Monitors- 27 Inch

4 no Delivery: 244 days
#4

Upgradation of existing SAS at Kurnool SS- Supply Portion

Loading of latest SCADA and other software licensed version in Servers-HMIs- Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support

1 lot Delivery: 244 days
#5

Upgradation of existing SAS at Kurnool SS- Supply Portion

Configuration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed

1 lot Delivery: 244 days
#6

Upgradation of existing SAS at Kurnool SS- Supply Portion

Engineering, loading and testing & Commissioning of new database

1 lot Delivery: 244 days
#7

Upgradation of existing SAS at Kurnool SS- Supply Portion

Ethernet Switches with 12CU plus 12 FO.

2 ea Delivery: 244 days
#8

Upgradation of existing SAS at Kurnool SS- Supply Portion

GPS with POWERGRID TS

1 set Delivery: 244 days
#9

Upgradation of existing SAS at Kurnool SS- Supply Portion

Inverters 2KVA

2 set Delivery: 244 days
#10

Upgradation of existing SAS at Kurnool SS- Supply Portion

Bay control Unit ( For Swapping during Firmware Upgrdataion)

1 ea Delivery: 244 days
#11

Upgradation of existing SAS at Kurnool SS- Supply Portion

Patch Cords

2 set Delivery: 244 days
#12

Upgradation of existing SAS at Kurnool SS- Service Portion

Final Data base modification at site, testing and commissioning limited to 30 days

30 mandays Delivery: 244 days
#13

Upgradation of existing SAS at Kurnool SS- Service Portion

Installation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications

2 no Delivery: 244 days
#14

Upgradation of existing SAS at Raichur SS- Supply Portion

Supply of industrial grade PC with latest operating System(Windows 11) with 7 Years Support and with PC specifications as mentioned in SCOPE of work i) Server- 03 nos ii) Client- 02 nos iii) Gateway- 02 nos iv) DR/EWS PC- 01 no V)Historians - 02 Nos

10 no Delivery: 244 days
#15

Upgradation of existing SAS at Raichur SS- Supply Portion

Supply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications

2 no Delivery: 244 days
#16

Upgradation of existing SAS at Raichur SS- Supply Portion

Monitors- 27 Inch

4 no Delivery: 244 days
#17

Upgradation of existing SAS at Raichur SS- Supply Portion

Loading of latest SCADA and other software licensed version in Servers -HMIs-Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support

1 lot Delivery: 244 days
#18

Upgradation of existing SAS at Raichur SS- Supply Portion

Configuration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed

1 lot Delivery: 244 days
#19

Upgradation of existing SAS at Raichur SS- Supply Portion

Engineering, loading and testing & Commissioning of new database

1 lot Delivery: 244 days
#20

Upgradation of existing SAS at Raichur SS- Supply Portion

Ethernet Switches with 12CU plus 12 FO.

2 ea Delivery: 244 days
#21

Upgradation of existing SAS at Raichur SS- Supply Portion

GPS with POWERGRID TS

1 set Delivery: 244 days
#22

Upgradation of existing SAS at Raichur SS- Supply Portion

Inverters 2KVA

2 set Delivery: 244 days
#23

Upgradation of existing SAS at Raichur SS- Supply Portion

Bay control Unit ( For Swapping during Firmware Upgrdataion)

1 ea Delivery: 244 days
#24

Upgradation of existing SAS at Raichur SS- Supply Portion

Patch Cords

2 set Delivery: 244 days
#26

Upgradation of existing SAS at Raichur SS- Service Portion

Final Data base modification at site, testing and commissioning limited to 30 days

30 mandays Delivery: 244 days
#27

Upgradation of existing SAS at Raichur SS- Service Portion

Installation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications

2 no Delivery: 244 days
#28

Upgradation of existing SAS at Nellore PS- Supply Portion

Supply of industrial grade PC with latest operating System(Windows 11) with 7 Years Support. And with PC specifications as mentioned in SCOPE of work i) Server- 03 nos ii) Client- 02 nos iii) Gateway- 02 nos iv) DR/EWS PC- 02 no V)Historians - 02 Nos

11 no Delivery: 244 days
#29

Upgradation of existing SAS at Nellore PS- Supply Portion

Supply of Next Generation Fire Walls(NGFW) as per the POWERGRID specifications

2 no Delivery: 244 days
#30

Upgradation of existing SAS at Nellore PS- Supply Portion

Monitors- 27 Inch

4 no Delivery: 244 days
#31

Upgradation of existing SAS at Nellore PS- Supply Portion

Loading of latest SCADA and other software licensed version in Servers -HMIs- Gateways and DR-EWS PCs compatible with latest OS Version with Seven Year patch support

1 lot Delivery: 244 days
#32

Upgradation of existing SAS at Nellore PS- Supply Portion

Configuration and software loading in PC (Supply and installation of Antivirus, Network management system and other softwares ) licensed

1 lot Delivery: 244 days
#33

Upgradation of existing SAS at Nellore PS- Supply Portion

Engineering, loading and testing & Commissioning of new database

1 lot Delivery: 244 days
#34

Upgradation of existing SAS at Nellore PS- Supply Portion

Ethernet Switches with 12CU plus 12 FO.

2 ea Delivery: 244 days
#35

Upgradation of existing SAS at Nellore PS- Supply Portion

GPS with POWERGRID TS

1 set Delivery: 244 days
#36

Upgradation of existing SAS at Nellore PS- Supply Portion

Inverters 2KVA

2 set Delivery: 244 days
#37

Upgradation of existing SAS at Nellore PS- Supply Portion

Bay control Unit ( For Swapping during Firmware Upgrdataion)

1 ea Delivery: 244 days
#38

Upgradation of existing SAS at Nellore PS- Supply Portion

Patch Cords

2 set Delivery: 244 days
#39

Upgradation of existing SAS at Nellore PS- Service Portion

Final Data base modification at site, testing and commissioning limited to 30 days

30 mandays Delivery: 244 days
#40

Upgradation of existing SAS at Nellore PS- Service Portion

Installation and commissioning of Next Generation Fire Walls(NGFW) as per the Powergrid Specifications

2 no Delivery: 244 days

Categories 25

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer