TenderDekho Logo
Closed GEM

Telangana Postal Circle Signage Board Tender Warangal 2026 V4 Q3 - Signage Equipment Procurement

Bid Publish Date

12-Oct-2026, 6:14 pm

Bid End Date

22-Oct-2026, 7:00 pm

Progress

Issue12-Oct-2026, 6:14 pm
AwardPending

Key Highlights

  • • Critical: Option Clause allowing ±25% quantity adjustment at contract placement and during currency
  • • Critical: Delivery time calculations based on original and extended delivery periods with minimum 30 days
  • • Critical: Reference to an uploaded ATC document; bidders should review for exact eligibility and requirements
  • • Critical: Absence of BOQ items and explicit EMD/estimated value in tender data

Tender Overview

** Telangana Postal Circle** invites bids for Signage Board (V4) Q3 in Warangal, Telangana 506008. The procurement scope centers on signage boards, with an option clause allowing quantity adjustments up to 25% of bid quantity and contract quantity, at contracted rates. Delivery timelines hinge on the last delivery order date, with extended-time calculations based on the formula provided in the ATC. The ATC terms indicate bidders must comply with purchaser rights to modify order quantities during the contract term. Unique aspects include vendor adherence to the option-clause delivery methodology and the absence of BOQ items in the tender data.

Technical Specifications & Requirements

  • Product category: Signage Board (V4) (Q3) for Telangana Postal Circle
  • No explicit technical specifications or BOQ items are provided in the tender data
  • EMD: not specified in the tender data
  • Delivery terms: as per option clause, delivery from the last date of the original delivery order; additional time calculation: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • ATC/ATC document referenced; bidders should view uploaded ATC for compliance and any additional requirements
  • No explicit standards or certifications listed in the provided data

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% during and after contract
  • Delivery period: calculated per order cadence; extended delivery time applies; minimum 30 days for extended period
  • Bidders must comply with these terms and view the uploaded ATC document for any additional conditions
  • No BOQ items, no estimated value, and no explicit EMD amount provided in the data
  • GST/PAN/experience documentation requirements are not detailed in the supplied information

Key Specifications

  • Product: Signage Board (V4) Q3

  • Quantity: Not specified in tender data

  • EMD: Not specified

  • Delivery: Calculated per original and extended periods with minimum 30 days

  • Standards/Certificates: Not specified in tender data; ATC to be consulted

Terms & Conditions

  • Key Term 1: Quantity adjustment up to 25% during contract

  • Key Term 2: Delivery period determined from last date of original order

  • Key Term 3: Review of uploaded ATC for full terms and conditions

Important Clauses

Payment Terms

Not specified in tender data; ATC document may define payment terms

Delivery Schedule

Delivery starts from last date of original delivery order; extended time calculation applies with minimum 30 days

Penalties/Liquidated Damages

Not specified in tender data; ATC may include penalties

Bidder Eligibility

  • Eligibility to view and comply with ATC

  • Experience in supplying signage boards or related equipment

  • Compliance with local procurement requirements for Telangana

Advertisement

Authority & Contact

Office Name

Cpmg Hyderabad

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

197

Bid Type

Single Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

5

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Signage Board (V4) (Q3)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Hanumakonda

Delivery Pincodes

506001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Kappala Sivaji506001,O/o Supdt. of Post Offices, Hanamkonda Division, Opp: Court, Adalath Circle, Subedari, Hanumakonda - 506001HanumakondaTelangana50600119715-

Authority Records

MINISTRY OF COMMUNICATIONSPOSTS DEPARTMENTTELANGANA POSTAL CIRCLE

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9993587.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 1

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for signage boards or similar contracts

4

Financial statements (audit report or balance sheet for last 2-3 years)

5

EMD/Security deposit proof (if required by ATC)

6

Technical bid documents as per ATC

7

OEM authorizations or supplier certifications (if required by ATC)

Frequently Asked Questions

Key insights about TELANGANA tender market

How to bid for signage board tender in Warangal 2026?

Bidders must review the uploaded ATC, submit GST and PAN, provide experience certificates for signage projects, and supply technical bid documents. The option clause permits ±25% quantity changes, with delivery calculated from the original delivery order date and extended periods; ensure compliance with delivery calculations.

What documents are required for Telangana Postal Circle signage bid?

Submit: GST certificate, PAN card, 2-3 years of financial statements, prior signage project experience certificates, EMD proof if required by ATC, and OEM authorizations or supplier certifications as specified in the ATC; ensure the technical bid aligns with ATC directives.

What are the delivery terms for the V4 Q3 signage tender?

Delivery begins after the last date of the original delivery order. If quantities increase, extended time equals (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; the purchaser may extend the period up to the original delivery duration.

What is the significance of the ATC document in this tender?

The ATC contains bidder-specific terms and conditions, including eligibility criteria, submission requirements, and any additional technical standards or certifications; bidders must view and comply with its contents to participate successfully.

Are there any standard certifications required for signage boards in this tender?

The tender data does not specify standards; bidders should confirm via the ATC document for any required certifications or quality standards and ensure conformity to any referenced ISI/ISO if listed there.

How will quantity variations impact delivery timelines for this tender?

Quantities may vary by up to 25% during contract; delivery time adjusts as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days; ensure project planning accommodates potential timeline changes.

What is the bidding location and organization for this signage project?

Bidders should engage with Telangana Postal Circle, Warangal 506008 for the Signage Board (V4) Q3 tender; review the ATC for any region-specific procurement terms and submission instructions.

What steps to take if EMD is not specified in the tender?

If EMD is not specified, verify with the ATC; otherwise prepare standard bid security per typical postal tender practices and confirm with the procurement a day before submission to avoid last-minute issues.

Advertisement