Bid Publish Date
17-Oct-2026, 2:22 am
Bid End Date
27-Oct-2026, 5:00 pm
Location
Progress
The procurement is issued by the Durgapur Steel Plant, part of the Steel Authority of India Limited (SAIL), for a set of mechanical assemblies including the ASSLY. OF SIDE GUIDE ROLLER: TP11436/1/M, ASSY OF LT DRIVE, PART NO. TP11467/1, COUPLER BUFFER TP5793/1, SPINDLE ROD ASSY TP574812/4, BUFFER ASSY TP5801/2/M, and ELECON SHAFT & SPROC ASSY FOR OPERATIONAL LIMIT. The BOQ reports 0 items and there are no explicit quantities or values disclosed in the available data. The tender appears to be anchored to standard internal SI/IS mechanical assemblies typical of rolling mill or material handling equipment in a large steel plant environment. The lack of BOQ detail and missing dates implies a need to review the ATC document for scope confirmation and technical compliance criteria. This summary highlights the specific part numbers and assembly names to guide bidders in preparing component-level supply and integration plans for Durgapur’s production line.
EMD amount and payment terms to be confirmed in ATC
Delivery schedule and penalties to be specified in ATC
OEM authorizations and technical compliance required per ATC
Details to be clarified in ATC; bidders should expect milestones and potential advance payments as per standard SAIL procurement.
Delivery windows, inspection, and acceptance criteria to be defined in ATC; ensure alignment with plant production timelines.
LD provisions and cure periods will be specified in ATC; prepare for potential penalties on late deliveries or non-conformity.
Experience in supplying mechanical assemblies for large steel plants
Demonstrated OEM authorization or approved distributor status
Financial stability with verifiable turnover and tax registrations
Quantity
7
Category
ASSLY. OF SIDE GUIDE ROLLER: TP11436/1/M
Bid Type
Two Packet Bid
Bid Validity
75 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ASSLY. OF SIDE GUIDE ROLLER: TP11436/1/M , ASSY OF LT DRIVE, PART NO. TP11467/1 , ASSEMBLY OF COUPLER BUFFER TP5793/1 , SPINDLE ROD ASSY, PART NO TP574812/4 , BUFFER ASSY, TP5801/2/M, ELECON , SHAFT & SPROC ASSY FOR OPERATIONAL LIMIT
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Paschim Bardhaman
Delivery Pincodes
713203
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| VIVEK KUMAR MAURYA | 713203,Central Stores Building, Central Stores Department, Durgapur Steel Plant, Durgapur-713203 | Paschim Bardhaman | West Bengal | 713203 | 1 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates from similar procurements
Financial statements (last 1-2 years)
EMD/Security deposit details (as per ATC)
Technical bid documents demonstrating compliance with required assemblies
OEM authorizations or authorized distributor certificates
Bidders should review the ATC to confirm exact scope, submit the required documents (GST, PAN, experience certificates, financials, OEM authorizations), and ensure compliance with any OEM-specific standards. Prepare a detailed technical proposal aligned with TP11436/1, TP11467/1, and TP5793/1 assemblies.
Required documents typically include GST certificate, PAN card, annual financial statements, experience certificates for similar projects, OEM authorization, and technical bid documents proving compliance with the specified assemblies TP11436/1, TP11467/1, TP5793/1.
Exact specifications are provided in the ATC; bidders should verify side guide roller assembly TP11436/1/M and LT DRIVE assembly TP11467/1 requirements, including dimensions, tolerances, and OEM references, to ensure compatibility with existing plant interfaces.
Delivery windows are defined in the ATC; bidders must align proposed schedules with plant production needs and confirm inspection/acceptance timing as per the ATC terms.
Payment terms are clarified in the ATC; proposers should expect milestone-based release, possible advance, and final payment upon successful delivery and acceptance, subject to compliance checks.
The ATC will specify mandatory standards (e.g., IS/ISO/BIS) and OEM certifications; bidders must provide corresponding compliance documents and OEM authorizations.
Eligibility requires past performance on similar projects, valid GST/PAN, financial viability, and OEM authorization; confirm if turnover thresholds or experience years are mandated in the ATC.
Scope includes multiple mechanical assemblies: SIDE GUIDE ROLLER, LT DRIVE, COUPLER BUFFER, SPINDLE ROD, BUFFER, and SHAFT & SPROCKET for operational limit; verify quantities and interfaces in the ATC.