TenderDekho Logo
Closed GEM

Rail Coach Factory Kapurthala Capacitors for Electric Fan Motors IS 1709 (V2) Tender 2026

Bid Publish Date

07-Sep-2026, 10:55 am

Bid End Date

18-Sep-2026, 9:00 am

Progress

Issue07-Sep-2026, 10:55 am
AwardPending

Tender Overview

The opportunity is issued by Rail Coach Factory Kapurthala under the Indian Railways umbrella for the procurement of Capacitors for Electric Fan Motors as per IS 1709 (V2) (Q3). The bid scope specifies Only supply of Goods with an emphasis on post-receipt verification at the consignee site (Rail Coach Factory, Kapurthala). Although the BOQ lists 0 items and the exact estimated value is not disclosed, the procurement centers on compliant, IS 1709 (V2) capacitors suitable for railway fan motors, with a focus on standard adherence and on-time delivery. This tender requires bidders to align with equipment-grade specifications and post-delivery inspection norms, differentiating suppliers by technical compliance and reliability. The unique context is a government rail equipment purchase with clear inspection at the consignee, not at the seller’s premises, and a zero-item BOQ implication encouraging readiness to scale per requirement.

Technical Specifications & Requirements

  • Product: Capacitors for Electric Fan Motors (as per IS 1709 (V2), Q3)
  • Inspection: Post Receipt Inspection at Rail Coach Factory, Kapurthala; no pre-dispatch inspection unless ATC clause indicates
  • Scope: Supply of Goods only; no service components
  • Standards: IS 1709 (V2); compliance demonstrated via test reports and OEM documentation
  • BOQ: Total Items: 0 (no itemized quantities provided); bidders should anticipate scope expansion on demand
  • Delivery/Acceptance: Per consignee inspection; documentation must accompany shipment
  • Location: Kapurthala, Punjab; focus on hardware-grade capacitors suitable for railway motors
  • Context: Government procurement with strict admission through inspection and quality verification

Terms, Conditions & Eligibility

  • EMD/Deposit: Not explicitly stated in available text; bidders should verify during ATC and tender portal
  • Experience: Prior proficiency in supplying railway-grade electrical components recommended; OEM authorizations may be required
  • Documentation: Submit GST, PAN, technical compliance certificates, OEM authorizations, and financial statements
  • Evaluation: Post-receipt inspection outcome may determine acceptance; focus on IS 1709 (V2) compliance
  • Payment: Information not provided; bidders should await ATC terms and standard Indian Railways payment norms
  • Penalties/LD: Not specified in available terms; expect standard performance penalties per Railways procurement norms

Key Specifications

  • Product/service names and category: Capacitors for Electric Fan Motors

  • Standards: IS 1709 (V2) (Q3) compliance

  • Delivery scope: Supply of Goods only; post-receipt inspection at Rail Coach Factory Kapurthala

  • Inspection: Post receipt at consignee site; no pre-dispatch inspection unless ATC triggers consideration

  • Quantities: Not specified (BOQ shows Total Items: 0); bidders to align with future orders

  • Eligibility: Likely need OEM authorization and railway-grade certification; references to IS 1709 (V2)

Terms & Conditions

  • Post-receipt inspection at Rail Coach Factory Kapurthala

  • IS 1709 (V2) compliance for capacitors

  • Only supply of goods; no service component included

Important Clauses

Payment Terms

Payment terms not specified in available data; bidders must confirm after ATC release and railway standard terms

Delivery Schedule

Delivery timeline to be defined in ATC; ensure readiness to scale for future item requirements

Penalties/Liquidated Damages

No LD details provided; expect penalties per Railways procurement policies upon inspection failure

Bidder Eligibility

  • Proven experience in supplying railway-grade electrical capacitors

  • Authorization from capacitor OEM or manufacturer

  • GST and PAN active with clean tax/compliance record

Advertisement

Authority & Contact

Department

Indian Railways

Office Name

Kapurthala

Grievance Contact

[email protected]

Financial Results

Rank Seller Price Item
L1
G S ENTERPRISES   Under PMA
Item Categories : Capacitors for Electric Fan Motors as per IS 1709 (V2)
L2
DADA ENERGIES PRIVATE LIMITED   Under PMA
Item Categories : Capacitors for Electric Fan Motors as per IS 1709 (V2)
L3
ARYA ENTERPRISES   Under PMA
Item Categories : Capacitors for Electric Fan Motors as per IS 1709 (V2)
L4
P R ENTERPRISES   Under PMA
Item Categories : Capacitors for Electric Fan Motors as per IS 1709 (V2)
L5
RADHE RADHE   Under PMA
Item Categories : Capacitors for Electric Fan Motors as per IS 1709 (V2)
L6
SHARVIL TRADING COMPANY   Under PMA
Item Categories : Capacitors for Electric Fan Motors as per IS 1709 (V2)
L7
R S SERVICES   Under PMA
Item Categories : Capacitors for Electric Fan Motors as per IS 1709 (V2)

Tender Data

Bid Details

Quantity

500

Bid Type

Single Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

12 months

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Capacitors for Electric Fan Motors as per IS 1709 (V2) (Q3)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Kapurthala

Delivery Pincodes

144602

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rabindra Nath Behera144602,Cheif Plant Engineer, Rail coach Factory, KapurthalaKapurthalaPunjab14460250030-

Authority Records

MINISTRY OF RAILWAYS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9854752.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Categories 6

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for railway-grade electrical components

4

Financial statements (latest audited)

5

EMD/Security deposit documentation (as applicable)

6

Technical bid documents confirming IS 1709 (V2) compliance

7

OEM authorizations or certifications from capacitor manufacturers

8

Quality/test reports demonstrating IS 1709 (V2) conformity

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid on capacitors tender in Kapurthala Rail Coach Factory 2026?

Bidders must meet eligibility for railway electrical components, submit GST, PAN, OEM authorizations, and financials. Include IS 1709 (V2) compliance, post-receipt inspection readiness, and post-delivery documentation. Confirm EMD requirements in ATC and satisfy manufacturer certification criteria for capacitors.

What documents are required for Rail Coach Factory Kapurthala capacitor bid?

Required documents include GST certificate, PAN card, experience certificates for railway-grade capacitors, audited financial statements, EMD documentation, technical compliance certificates, OEM authorization, and test reports demonstrating IS 1709 (V2) conformity.

What standards must capacitors meet for IS 1709 (V2) Q3 tender?

Capacitors must be IS 1709 (V2) compliant with Q3 specifications, supported by OEM test reports and conformity certificates. Suppliers should provide documentation validating electrical rating, tolerance, operating temperature, and case material suitable for railway fan motors.

When is the inspection conducted for Rail Coach Factory Kapurthala capacitor tender?

Inspection is conducted after receipt at the consignee site, Rail Coach Factory Kapurthala. No pre-dispatch inspection unless ATC specifies. Vendors should ensure packaging and labeling align with rail standards for smooth acceptance.

What is the delivery expectation for capacitors under this tender?

Delivery terms are defined by the consignee’s acceptance process. Since BOQ items are not listed, bidders should stay prepared to supply on notification, with quality checks conducted post-delivery. Timely shipment and conformance to IS 1709 (V2) are essential.

What are the eligibility criteria for railway-grade capacitor suppliers?

Eligibility includes prior railway or heavy electrical component experience, valid GST and PAN, OEM authorization, financial stability, and demonstrable IS 1709 (V2) test documentation. A clean track record with timely deliveries strengthens bid evaluation.

What documents prove IS 1709 (V2) compliance for bidders?

Provide IS 1709 (V2) certified test reports, manufacturer datasheets, OEM conformity letters, and supplier quality assurance documentation. Include batch consistency data and qualification/test certificates for the specific capacitor model proposed.

How does post-receipt inspection affect payment terms for this bid?

Payment terms hinge on Railways policy and ATC terms. Post-receipt inspection results may impact acceptance and final payment processing. Ensure all documentation aligns with inspection criteria and contract conditions for smooth settlement.

Advertisement