TenderDekho Logo
Active GEM

ONGC supply and termination of 12 Nos 22kV 3*300sqmm XLPE Aluminium heat shrinkable outdoor cable termination kit tender 2026

Bid Publish Date

02-Sep-2026, 10:11 am

Bid End Date

16-Sep-2026, 12:00 pm

Location

RAIGAD , MAHARASHTRA

Progress

Issue02-Sep-2026, 10:11 am
AwardPending

Tender Overview

  • Organization: Oil And Natural Gas Corporation Limited. - Product/service: supply and termination of 12 Nos of 22kV 3*300sqmm XLPE Aluminium heat shrinkable outdoor cable termination kit. - Location: India (onsite at ONGC assets, generic location details not specified). - Estimated value and exact EMD: not disclosed. - Scope context: specialized termination kits for high-voltage outdoor cables, aligned with ONGC electrical maintenance needs. - Unique differentiator: strict post-completion warranty and 25% bid quantity/duration flexibility in ATC. - Tender nuance: tied to standard contractual terms for service-type procurement with fixed completion and warranty obligations.

    Technical Specifications & Requirements

  • Item/Category: 12 kV high-voltage cable termination kit with XLPE aluminium construction; outdoor, heat shrinkable. - Voltage rating and conductor: 22kV, 3*300sqmm cross-section. - Construction: XLPE insulation; aluminium conductor; heat shrinkable material suitable for outdoor use. - Delivery/work scope: complete termination kit supply and on-site termination within project scope; no BOQ lines. - Quality/standards notes: explicit standards not specified; warranty period defined in terms. - Performance/installation: need for secure, weather-resistant termination compatible with 22kV networks. - Delivery location: not specified; anticipated at ONGC facilities. - Experience: while not enumerated, typical HV cable termination work requires electrical installation capability.

    Terms, Conditions & Eligibility

  • Contract period: validity for 6 months from LOA date; completion within 1 month from start intimation. - Payment terms: 100% payment after work completion, payment within 10 calendar days of invoice; no advance mobilization/demobilization charges. - Warranty: 12 months defect-free performance warranty from completion; contractor to repair/replace at no cost during warranty. - Quantity flexibility: buyer may adjust contract quantity/duration up to 25% at issue and post-issue within specified limits; price/scope adjustments require consent for Lump-sum contracts. - Invoicing: through VIMS Portal; comply with GST and tax deductions as per law. - Delivery/penalties: standard non-specified penalties apply if terms breached; manufacturer or OEM warranties to be honored by contractor. - Documentation: adherence to T&C and submission of required compliance documents upon award.

Key Specifications

    • Product name: 22kV XLPE Aluminium heat shrinkable outdoor cable termination kit
    • Quantity: 12 Nos
    • Voltage rating: 22kV
    • Conductor size: 3*300sqmm
    • Material: XLPE insulation, aluminium conductors
    • Environment: outdoor, heat shrinkable application
    • Warranty: 12 months from completion

Terms & Conditions

  • Completion within one month from start intimation is mandatory

  • Contract validity for six months from LOA date

  • 100% payment after completion within 10 days of invoice

  • No advance payment; mobilization/demobilization charges not payable

  • 25% quantity/duration variation permitted by ATC at award and post-award

  • 12-month warranty with defect-free performance and repair/replacement obligations

Important Clauses

Payment Terms

100% payment after work completion; payment within 10 calendar days from invoice; no advance payment; VAT/GST as applicable; invoices via VIMS Portal

Delivery Schedule

Complete job within 1 month of intimation; LOA validity 6 months; supplier must align with ONGC start date and coordinate for on-site termination work

Penalties/Liquidated Damages

Standard penalties for delays and non-conformity; warranty breach leads to cost recovery for defectives and potential damages; contractor may be required to repair/replace at own cost

Bidder Eligibility

  • Experience in supply and termination of high-voltage cable terminations

  • Financial capability to handle HV electrical procurement without advance payments

  • Ability to operate under ONGC VIMS invoicing and compliance framework

Tender Data

Bid Details

Quantity

1

Similar Category

Electric Cabling Service Operation And Maintenance Of Electro-Mechanical Installations Operation and Maintenance Of Electrical Systems/Electrical Installations

Bid Type

Single Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

No

MII Compliance

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

No

Item Category

Custom Bid for Services - Supply and termination of 12 Nos 22kV 3*300sqmm XLPE Aluminium heat shrinkable Outdoor cable termination kit

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

20

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Raigad

Delivery Pincodes

400702

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vishal Thakur400702,Uran Plant, ONGC Dronagiri BVhavan Uran Distt RaigadRaigadMaharashtra400702Project / Lumpsum Based--

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9829445.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

400702

Grievance Contact

[email protected]

Categories 18

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates related to HV cable termination

4

Financial statements (as applicable)

5

EMD/Security deposit documentation (if applicable per ATC)

6

Technical bid documents indicating kit specifications

7

OEM authorizations or certifications for XLPE aluminium termination kits

8

Any on-site safety and quality assurances

Frequently Asked Questions

How to bid for the ONGC 22kV termination kit tender 2026?

Bidders should prepare the required legal and financial documents, demonstrate HV termination experience, ensure capability to supply 12 Nos of 22kV 3*300sqmm XLPE aluminium kits, and submit through the VIMS portal. The contract requires a 1-month completion window and 12-month warranty post-completion.

What documents are required for ONGC termination kit submission?

Submit GST certificate, PAN, HV experience certificates, OEM authorizations for XLPE termination kits, financial statements, and technical bid detailing kit specifications (22kV, 3*300sqmm). Include EMEs as applicable and ensure VIMS portal uploads.

What are payment terms for ONGC supply and termination work?

ONGC offers 100% payment after completion, with payment due within 10 calendar days of invoice receipt. No advance payments applicable; ensure compliance with GST and tax deductions as per law.

What is the warranty period for the termination kit contract in ONGC tender?

The contractor provides a 12-month defect-free warranty from completion. If defects arise, ONGC can demand repairs/replacements at contractor cost or compensate accordingly; warranty terms align with standard contract conditions.

What is the completion timeline and contract validity for this ONGC tender?

Complete the job within one month from intimation. The contract remains valid for six months from the LOA date, with possible quantity and scope adjustments up to 25% under ATC.

Are there quantity flexibility provisions for ONGC 22kV kit tender?

Yes. The buyer can adjust contract quantity up to 25% at contract issue and post-issue, subject to consent for scope changes in lump-sum arrangements; bidders must plan capacity accordingly.