Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow. Procurement: Gravimetric coal feeder components including back plate, discharge chute plate-2, discharge chute plate, and center coal feed pipe for coal handling systems. Location: ALIGARH, UTTAR PRADESH. EMD: ₹40,000. The buyer reserves quantity options up to +25% during contract and extended delivery periods with a mathematically defined time extension formula, minimum 30 days. GST implications are bidder’s responsibility; reimbursement follows actuals or capped by quoted rate. This tender lacks BOQ items and explicit technical specs but targets specific gravity-feeder components for coal handling plants within the Uttar Pradesh energy sector.
Product/service names: gravimetric coal feeder back plate, gravimetric coal feeder discharge chute plate-2, gravimetric coal feeder discharge chute plate, center coal feed pipe
Quantities: not specified in BOQ; total items: 0
Estimated value: not specified
Experience: supplier capability to furnish coal feeder components
Quality/standards: compliance with standard industry practices for coal handling equipment; IS/industry standards as applicable
Delivery: as per option clause in ATC; minimum 30 days for additional delivery time
Warranty/AMC: not specified in data
Key Term 1: EMD amount ₹40,000 and submission proof required
Key Term 2: Quantity flexibility up to 25% during and after contract
Key Term 3: GST compliance borne by bidder; reimbursement as actuals or capped
GST payable by bidder; reimbursement as actuals or at quoted rate; EMD submitted as per tender
Delivery period calculated per option clause with minimum 30 days; periods commence from last date of original delivery order
Not explicitly specified; apply standard government procurement LD terms per contract
Eligibility to supply gravimetric feeder components or similar coal handling equipment
Valid GST registration and PAN
Experience certificates for relevant supply contracts
OEM authorization if manufacturer is not bidder
Financial capacity evidenced by recent statements
Quantity
32
Category
CENTER COAL FEED PIPE
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
GRAVEMETRIC COAL FEEDER BACK PLATE , GRAVEMETRIC COAL FEEDER DISCHARGE CHUTE PLATE , GRAVEMETRIC COAL FEEDER DISCHARGE CHUTE PLATE-2 , CENTER COAL FEED PIPE
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
18
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Aligarh
Delivery Pincodes
202127
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Bijai Kumar Tiwari | 202127,Harduaganj Thermal Power Plant, P.O. Kasimpur | Aligarh | Uttar Pradesh | 202127 | 10 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
17-Sep-2026, 4:30 am
Opening Date
18-Sep-2026, 4:30 am
Extended Deadline
07-Sep-2026, 4:30 am
Opening Date
07-Sep-2026, 5:00 am
Extended Deadline
28-Aug-2026, 4:30 am
Opening Date
28-Aug-2026, 5:00 am
Discover companies most likely to bid on this tender
GST registration proof
Permanent Account Number (PAN) card
Experience certificates for similar gravimetric feeder components or coal handling equipment
Financial statements (last 2-3 years)
EMD submission proof (₹40,000)
Technical bid documents demonstrating product compatibility
OEM authorization or dealer certificate, if applicable
Key insights about UTTAR PRADESH tender market
Bidders should submit GST, PAN, and EMD ₹40,000 along with technical bid documents showing compatibility of back plate, discharge chute plates, and center feed pipe with existing gravimetric feeders. Ensure OEM authorizations if applicable and comply with GST reimbursement terms. Delivery terms follow the 25% quantity option rule and minimum 30 days extension.
Required documents include GST certificate, PAN, 2-3 years of financial statements, recent experience certificates for similar equipment, EMD proof of ₹40,000, technical bid detailing component specs, and OEM authorization if you are not the manufacturer.
Delivery starts from the last date of the original order; if quantity increases by up to 25%, the delivery period extends according to (increased/original) × original days, with a minimum extension of 30 days; extended time may apply under option clause.
Yes. Bidders must account for applicable GST; reimbursement will be on actuals or the lower of the quoted GST rate, ensuring compliance with tax regulations and tender terms.
No explicit ISI/ISO standards are listed in the tender data. Bidders should align with standard industry practices for gravimetric coal feeder components and confirm any organization-specific requirements during bidding.
The EMD is ₹40,000. Submit proof of payment online or as per tender instructions; ensure the EMD accompanies the technical bid to avoid disqualification.
Eligible bidders must show financial capability via recent statements, GST registration, PAN, and experience certificates for similar coal feeder or gravimetric feeder component supply. OEM authorizations are required if not the manufacturer, with compliance to delivery and GST terms.
Scope includes back plate, discharge chute plate-2, discharge chute plate, and center coal feed pipe for gravimetric coal feeders; BOQ items are not listed, so verify exact fit and interfaces with existing equipment before submission.