Progress
Organization: Indian Army (Department Of Military Affairs). Product/service: Provn of 30 Fast Erection Foldable Shelters (5 M). Location: India. Estimated value / EMD: Not disclosed. Context: Military shelter provisioning under government defense procurement. Unique aspect: Option clause allows quantity variation up to 50% with contracted rates and extension rules tied to delivery periods. This tender enforces extended delivery timing based on the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Key Term 1: 50% quantity variation allowed at contract and during currency
Key Term 2: Delivery extension formula with minimum 30 days
Key Term 3: Review ATC document for any specific standards or brand requirements
Not specified in data; bidders should verify ATC for payment conditions in final contract
Delivery period begins from last date of original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in data; check ATC for LD clauses and performance guarantees
Experience in supplying rapid-deploy shelters or military-grade portable shelters
Compliance with ATC document requirements and any IS/defense standards
Financial capability to support procurement, with turnover evidence and stability
Quantity
30
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
99
OEM Avg. Turnover
99
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Provn of Qty 30 x Fast Erection Foldable Shelter (5 M)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Pre-Bid Date
20-10-2026 10:00:00
Pre-Bid Venue
12 Engineer Regiment, Tenali TCP, Dinjan, 786189
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Tinsukia
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Tinsukia | Tinsukia | - | - | 30 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar shelter or military-grade tents/shelters
Financial statements / turnover evidence
EMD submission proof (as per ATC guidance, if applicable)
Technical bid documentation and compliance matrix
OEM authorizations or brand certifications (if required by ATC)
Any ISI/ISO certifications or defense-specific standards (as per ATC)
Key insights about ASSAM tender market
Bidders must review the ATC document uploaded by the Army and submit compliant technical bids with proof of GST, PAN, and financials. Ensure experience in rapid-deploy shelters, and align delivery schedules to the original delivery order while accounting for the 50% quantity variation clause.
Required documents include GST certificate, PAN, experience certificates for similar shelters, financial statements, EMD submission proof if applicable, OEM authorizations, and technical compliance documents. Prepare ATC-aligned certificates to satisfy defense procurement norms.
Delivery extensions follow the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days. The Purchaser may extend this during the currency of contract, up to 50% quantity variation as per option clause.
The tender data references an ATC document for standards; no explicit IS/ISO standard is listed here. Bidders must review the ATC to confirm ISI/ISO or defense-specific standard compliance before submission.
The purchaser may increase or decrease the quantity up to 50% of bid quantity at the time of placement and during contract currency. All variations must be at contracted rates.
Delivery commencement starts from the last date of the original delivery order. If option clauses extend delivery, the additional time follows the extension formula with a minimum 30 days.
Scope includes provision of 30 fast erection foldable shelters (5 M). Exact installation or site-works, and any customization, should be clarified in the ATC and subsequent contract schedule.
Eligibility requires GST, PAN, experience certificates for similar rapid shelters, financials proving stability, and OEM authorizations if mandated by ATC. Compliance with ATC terms is mandatory for bid acceptance.