TenderDekho Logo
Active GEM

Urban Development Department Uttar Pradesh Solar PV Water Pumping Systems (V2) MNRE Q3 Tender 2026

Bid Publish Date

12-Oct-2026, 2:00 pm

Bid End Date

28-Oct-2026, 1:00 pm

EMD

₹5,63,750

Generate Docs

Progress

Issue12-Oct-2026, 2:00 pm
Corrigendum22-Oct-2026
AwardPending

Tender Overview

Urban Development Department, Uttar Pradesh invites bids for Solar Photovoltaic Water Pumping Systems (V2) aligned with MNRE Specification (Q3) for deployment in Sant Ravidas Nagar, Uttar Pradesh 221301. Estimated scope includes Supply, Installation, Testing and Commissioning of PV water pumping solutions with an EMD of ₹5,63,750. The tender allows a 25% quantity variation at contract award and during the contract period, with delivery timelines recalculated accordingly. Bidders must demonstrate three-year turnover and OEM turnover compliance as per tender rules. The procurement targets a scalable solar irrigation solution, with emphasis on compliance to MNRE V2 standards and integration readiness. Unique aspects include OEM turnover criteria and option to increase quantity at contracted rates. The absence of a BOQ indicates a potentially modular or itemized scope later clarified by corrigenda.

Technical Specifications & Requirements

  • Scope: Supply, Installation, Testing and Commissioning of Solar PV Water Pumping Systems (V2) as per MNRE Specification (Q3)
  • EMD: ₹5,63,750 to be deposited with bid submission
  • Delivery/Option Clause: Purchaser may increase/decrease quantity up to 25% of bid quantity at contract, with time adjustments using the formula provided (minimum 30 days)
  • Experience/Turnover: Bidder and OEM must meet minimum average annual turnover requirements for the last three financial years; documented via audited statements or CA certification
  • Scope of Supply: Includes all cost components for supply, installation, testing, and commissioning; payment terms to be defined in tender or subsequent amendments
  • Location: Sant Ravidas Nagar, UP, 221301, with MNRE-aligned specifications

Terms, Conditions & Eligibility

  • Turnover Criteria: Minimum average annual turnover over the last three years (and OEM turnover) as specified in bid document; evidence via audited balance sheets or CA certificate
  • Financial Standing: Bidder must not be under liquidation, receivership, or bankruptcy; an undertaking to this effect is required
  • Delivery Timeline: Delivery period is tied to the original delivery order; option-driven extensions follow the formula with minimum 30 days
  • Scope of Supply: Bid price must include supply, installation, testing, and commissioning; after-sales service to be arranged by supplier
  • Warranty/Support: Not explicitly specified in available data; bidders should seek clarifications on post-warranty service expectations
  • Documentation: Standard government bid documents, GSTIN, PAN, experience certificates, and OEM authorizations may be required at bid submission

Key Specifications

  • Product: Solar Photovoltaic Water Pumping System (V2) per MNRE Specification (Q3)

  • EMD: ₹5,63,750

  • Delivery: As per contract with 25% quantity variation option

  • Scope: Supply, Installation, Testing and Commissioning

  • Standards: MNRE V2 Q3 alignment; IS/IEC where specified by MNRE guidance

Terms & Conditions

  • EMD Amount: ₹5,63,750 to accompany bid

  • Quantity variation: ±25% at award and during contract

  • Turnover: Three-year average turnover required for bidder and OEM

  • Scope: Supply, installation, testing and commissioning included

  • Delivery: Timelines recalculated with option clause, minimum 30 days

Important Clauses

Payment Terms

Payment terms to be defined in the bid or subsequent amendments; ensure alignment with supply, installation and commissioning milestones

Delivery Schedule

Delivery period starts from the last date of original delivery order; extended period follows formula and minimum 30 days

Penalties/Liquidated Damages

Penalty provisions not specified in available data; bidders should verify LD terms in final tender documents

Bidder Eligibility

  • Three-year average turnover requirement for bidder and OEM

  • Not under liquidation or bankruptcy; provide undertaking

  • Experience in supplying PV water pumping systems per MNRE standards

Advertisement

Tender Data

Bid Details

Quantity

5

Category

Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

15

OEM Avg. Turnover

25

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3)

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Bhadohi

Delivery Pincodes

221404

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Kamlesh Kumar Srivastava221404,Nagar Panchayat Gyanpur Sant Ravidas nagarBhadohiUttar Pradesh221404115-

Authority Records

URBAN DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-10020372.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Nagar Panchayat Gyanpur Bhadohi

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

22-Oct-2026

Extended Deadline

28-Oct-2026, 7:30 am

Opening Date

29-Oct-2026, 7:30 am

Advertisement

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

Pan card

3

Audited financial statements or CA certificate indicating turnover for the last three years

4

OEM authorization letter (if applicable)

5

Experience certificates for similar PV water pumping systems

6

Bidder Undertaking of financial solvency and non-liquidation

7

Technical compliance certificates as per MNRE V2 Q3 (if available)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for solar water pumping systems in Sant Ravidas Nagar UP 2026

Bidders must meet turnover criteria for three years, submit EMD ₹5,63,750, provide OEM authorization if applicable, and demonstrate experience with MNRE V2 Q3 compliant PV pumping systems. Include GST, PAN, and audited financials; ensure supply, installation, testing and commissioning scope is covered.

What documents are required for UP solar PV water pump tender

Submit GST certificate, PAN, three-year turnover evidence (audited statements or CA certificate), OEM authorization (if applicable), experience certificates for PV pumping projects, and an undertaking on financial standing; include bid security and technical compliance documents as applicable.

What are the key technical standards for MNRE V2 Q3 bidding

Tender requires MNRE Specification V2 Q3 alignment; ensure PV pumping units meet performance and safety guidelines specified by MNRE; include any IS/IEC certifications if mandated; confirm with tender corrigenda for final standard references.

What is the EMD amount for this UP PV pump tender

The EMD is ₹5,63,750 to accompany the bid submission; ensure payment method as per tender guidelines (online or demand draft as specified) and include EMD submission proof with the bid.

When is the delivery period and what extension rules apply

Delivery starts from the last date of the original delivery order; option to increase quantity up to 25% is allowed, with additional time calculated as (increase/original) × original period, minimum 30 days.

Who must meet OEM turnover criteria for the tender

The OEM of the offered product must meet the minimum average annual turnover for the last three years; if the OEM is under 3 years old, turnover is calculated from completed years post-constitution and should be supported by audited statements or CA certificates.

What is included in the scope of supply for this tender

Bid price must cover Supply, Installation, Testing and Commissioning of Solar PV Water Pumping Systems; any after-sales service or warranty terms should be clarified in final tender documents or amendments.

What location details are specified for this tender

Procurement is for Sant Ravidas Nagar, Uttar Pradesh (PIN 221301); bidders should verify local installation logistics, grid connectivity, and water pump requirements aligned with MNRE V2 Q3 standards.

Advertisement