Progress
Organization: Kerala Electrical And Allied Engineering Co Ltd, under the Industries and Commerce Department Kerala, invites bids for a LED Floodlight conforming to IS 10322 (Part 5/Section 5), V3, under BIS Scheme II (PAC only) in Ernakulam, Kerala. The scope covers Supply, Installation, Testing and Commissioning with a total quantity subject to a 25% option clause. Bidders must demonstrate OEM experience with government projects and upload the product data sheet. The arrangement emphasizes post-sale support from India-based OEMs and compliance with the BIS testing framework.
LED floodlight conforming to IS 10322 Part 5 Section 5 V3
BIS Scheme II (PAC only) compliance
Scope: Supply, Installation, Testing and Commissioning (SITC)
OEM positive net worth in last audited financial statement
Data Sheet alignment with offered product parameters
Indian-based after-sales service for imported items
Quantity may vary ±25% at contract/extended period with minimum 30 days extension
3 years government/PSU supply experience required with contract copies
Data Sheet must match product specifications and be uploaded
Imported items require Indian OEM/authorized seller with service office
Positive net worth required; testing at AHSP/NABL labs with seller borne costs
If requested, End User Certificate must be provided in the buyer's standard format.
Delivery period linked to last date of original delivery order; option clause extension applies with prorated time.
Not explicitly stated; potential LDs apply as per contract and option clause governing delivery adherence.
Minimum 3 years of government/PSU supply of similar LED luminaires
Positive net worth as per last audited financial statement
Data Sheet must align with offered specifications and be uploaded
Quantity
20
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
Bid Splitting Applied
No
Past Performance
60 %
Warranty Period
5 days
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) ( PAC Only )
Max Delivery Days
75
Delivery Locations
1
Delivery Cities
Ernakulam
Delivery Pincodes
682036
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mohamed Abdul Salam.K.T | 682036,Kerala Electrical & Allied Engineering Co Ltd. Edarikode, Puthuparamba PO., Malappuram Dt. 676501 | Ernakulam | Kerala | 682036 | 20 | 75 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) cards
Experience certificates showing government/PSU supply in last 3 years
Audited financial statements demonstrating positive net worth
OEM authorization/agency agreement
Data Sheet of LED floodlight offered
End User Certificate (if required by buyer)
Any BIS/IS 10322 conformity certificates and testing reports
Proof of Indian office for after-sales service (for imported products)
Tender submission technical bid documents
Key insights about KERALA tender market
Bidders must meet 3 years of government/PSU supply experience, upload a matching Data Sheet, provide OEM authorization, and demonstrate positive net worth. Submit GST, PAN, and required certificates; ensure IS 10322 Part 5 V3 compliance and BIS PAC testing, with SITC scope included.
Required documents include GST certificate, PAN, last 3 years government/PSU contracts, audited financials showing positive net worth, OEM authorization, Data Sheet, End User Certificate if requested, and BIS/IS 10322 conformity certificates for the LED floodlight.
Qualification demands IS 10322 Part 5 Section 5 V3 compliance under BIS Scheme II; PAC-only procurement; NABL/AHSP lab testing; ensure data-sheet alignment and Indian OEM service support for imported goods.
Delivery timing follows the original delivery order; option for quantity extension is allowed up to 25% with prorated extension; minimum extension period is 30 days if original period exceeds zero.
EMD details are not specified in the data; bidders should prepare as per standard government practice, and ensure submission with bid as per Terms & Conditions; later official communique will specify EMD amount and mode.
Upload the Data Sheet with exact product parameters; buyers will match against the delivered product; mismatches can lead to bid rejection; ensure parameter parity for IS 10322 Part 5 V3 and BIS PAC certification.
Imported items must have an Indian-based OEM or authorized seller with a registered office for after-sales service; provide certificate of Indian service presence; ensure PAC/BIS compliance and data-sheet alignment.
Scope includes Supply, Installation, Testing and Commissioning of LED floodlights; ensure all components are included in bid price; items must conform to IS 10322 and BIS Scheme II requirements.