TenderDekho Logo
Active GEM

District Panchayat Anand High Mast Lighting Octagonal Tower with LED Flood Lighting System Tender Gujarat 2026 ISO 9001

Bid Publish Date

17-Oct-2026, 2:51 pm

Bid End Date

27-Oct-2026, 3:00 pm

Progress

Issue17-Oct-2026, 2:51 pm
AwardPending

Key Highlights

  • • ISO 9001 certification mandatory for bidder or OEM
  • • Supply, Installation, Testing and Commissioning included in contract scope
  • • High Mast Lighting Octagonal Tower with LED Flood Lighting System (V2) for small area
  • • Delivery quantity can increase up to 25% during contract at contracted rates

Tender Overview

The District Panchayat Anand, Gujarat invites bids for a High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) in Anand, Gujarat. The scope includes Supply, Installation, Testing and Commissioning of the lighting solution. The project emphasizes ISO 9001 certification for bidders or OEMs and requires a dedicated service support channel. With 25% flexible quantity under option and extended delivery provisions, the contract accommodates scale adjustments while maintaining contracted rates. The procurement targets a streamlined deployment within the local governance framework, leveraging standard-compliant equipment for public lighting enhancements.

Technical Specifications & Requirements

  • Product category: High Mast Lighting Octagonal Tower with LED Flood Lighting System (V2) for small area
  • Scope: Supply, Installation, Testing and Commissioning of the complete system
  • Standards: ISO 9001 certification required for bidder or OEM
  • Service support: Dedicated/toll-free service contact must be available from bidder/OEM
  • Delivery flexibility: Option to increase quantity up to 25% during contract; delivery period adjusted based on original timelines with minimum 30 days
  • Delivery location: Gujarat, Anand district, installation at designated public lighting sites
  • BOQ: No items listed in the provided data; indicative project scope remains for a compact high mast package
  • ATC/ATC document: Buyer uploaded ATC terms to be reviewed by bidders

Terms, Conditions & Eligibility

  • EMD: Not specified in the tender data
  • Contract scope: Includes Supply, Installation, Testing and Commissioning of the lighting system
  • Certification: ISO 9001 mandatory for bidder or OEM
  • Support: Bidders must offer a dedicated toll-free service line
  • Option clause: 0–25% quantity adjustment during contract with rates fixed
  • Delivery timing: Delivery schedule tied to original delivery period, extended by option calculations (minimum 30 days)
  • Other terms: Compliance with buyer ATC terms; installation and commissioning as part of Scope of Supply

Key Specifications

  • Product: High Mast Lighting Octagonal Tower with LED Flood Lighting System (V2)

  • Scope: Supply, Installation, Testing and Commissioning

  • Standards: ISO 9001 certification required for bidder or OEM

  • Performance: LED flood lighting system suitable for small area applications

  • Service: Dedicated toll-free support line required

Terms & Conditions

  • EMD amount not specified in current tender data

  • 25% quantity increase option at contracted rates

  • Delivery period starts from last date of original delivery order

  • ISO 9001 certification mandatory for bidder or OEM

  • Dedicated toll-free service support must be provided by bidder/OEM

Important Clauses

Delivery & Quantity Flexibility

Option to increase quantity by up to 25% with adjusted delivery time; minimum 30 days extension when applicable.

Scope of Supply

Bid price must include supply, installation, testing and commissioning of the high mast lighting system.

Certifications

ISO 9001 certification required for the bidder or the OEM.

Bidder Eligibility

  • Experience in supplying similar high mast lighting towers with LED systems

  • ISO 9001 certified bidder or OEM

  • Demonstrated service capability with dedicated toll-free support

Advertisement

Tender Data

Bid Details

Quantity

4

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

2

OEM Avg. Turnover

8

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2)

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

1

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Anand

Delivery Pincodes

388180

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Zala Ajitsinh388180,TARAPUR TALUKA PANCHAYAT , RAILWAY STATION ROAD, OPPOSITE, CHC TARAPUR AT. TARAPURAnandGujarat388180430-

Authority Records

PANCHAYATS AND RURAL HOUSING DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-10052335.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar high mast lighting projects

4

Financial statements demonstrating financial stability

5

EMD documents if specified in later addenda (not provided here)

6

Technical bid documents demonstrating ISO 9001 compliance

7

OEM authorization or manufacturer certification (if bidding as OEM/partner)

8

Any dedicated service/support contact details

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for high mast lighting tender in Anand Gujarat 2026?

To bid, ensure ISO 9001 certification is valid for your organization or OEM partner. Prepare documents including GST, PAN, financials, and experience certificates for similar projects. The scope covers supply, installation, testing and commissioning of LED high mast towers in Anand.

What documents are required for Anand lighting tender submission?

Submit GST certificate, PAN, company financial statements, experience certificates for similar projects, ISO 9001 certificate, OEM authorization if applicable, and technical bid detailing installation and commissioning capabilities; include service support contact details.

What standards and certifications are mandatory for the Anand LED tower bid?

Mandatory ISO 9001 certification for bidder or OEM. Ensure documentation proves certification scope, plus any local/Gujarat compliance. The tender may require ISI/IEC components if specified later in ATC terms; verify the ATC document before submission.

When is the delivery timeline for the Anand high mast project?

Delivery period starts from the last date of the original delivery order. If the quantity increases by 25%, the extended period is recalculated as (Increased quantity ÷ Original quantity) × Original period, with a minimum of 30 days.

What is included in the scope of supply for this procurement?

The bid must cover full supply, installation, testing and commissioning of the High Mast Lighting Octagonal Tower with LED Flood Lighting System (V2) for small area, installed at designated sites in Anand district.

How is service support structured for the Anand lighting tender?

Bidders must provide a dedicated toll-free service contact. This includes post-installation support, troubleshooting and maintenance coordination, ensuring rapid response for public lighting infrastructure in Gujarat.

What is the impact of the 25% option clause on tender pricing?

If quantity increases, unit rates remain fixed per contract. The option allows a 25% rise in quantity and requires recalculation of delivery time per the formula, ensuring delivery commitments stay aligned with contracted rates.

Are there any BOQ items listed for this tender in Anand?

No BOQ items are listed in the current data. Bidders should closely review the ATC document for any implicit itemization or specification references and prepare a flexible technical bid that aligns with a compact high mast lighting package.

Advertisement