Bharat Heavy Electricals Limited (BHEL), Department of Heavy Industry, seeks procurement of 6.6KV UE 3CX185 AL XLPE ARM FRLS and 6.6KV UE 3CX400 AL XLPE ARM FRLS cables for multiple units, located in SAMBALPUR, ODISHA. Estimated quantities include 3750 metres of 3CX185 and 500 metres of 3CX400 per unit, for units 8 and 9. The BoQ splits item 1 into A & B due to bid constraints, while item 2 mirrors item 1. The option clause allows a ±25% quantity variation during contract execution, with delivery time recalculated from the original order end date. No explicit estimated value or EMD details are provided in the data provided. BHEL requires adherence to ATC terms in the spec document. This tender focuses on specialized XLPE FRLS cable assemblies for high voltage service.

Technical Specifications & Requirements

  • Product category: 6.6KV XLPE FRLS cables (UE 3CX185 and UE 3CX400)
  • Lengths: 3750 metres (3CX185) per unit; 500 metres (3CX400) per unit
  • Applications: Armoured XLPE insulated, FRLS (fire-retardant low-smoke) cables
  • Configuration: Aluminium conductor (AL), unitized per set A/B and unit 8/9 differentiation
  • Key delivery constraint: BoQ items split for bidding constraints; provide compliant bundles A and B
  • Data gaps: No explicit standards or IS references stated in the available data

Terms, Conditions & Eligibility

  • EMD: Not disclosed in the provided data; bidders should verify via spec ATC
  • Delivery terms: Delivery period calculable via option clause; base delivery per original order timelines
  • Quantity variation: Purchaser may increase/decrease up to 25% during order and currency of contract
  • Authorizations: ATC document referenced; bidders must align with Buyer ATC terms in specification document
  • Payment terms: Not specified in available data; refer to ATC for schedules
  • Tender scope: Supply of XLPE FRLS cables for multiple units at Sambalpur, Odisha

Key Specifications

  • Product: 6.6KV UE 3CX185 AL XLPE ARM FRLS cable

  • Product: 6.6KV UE 3CX400 AL XLPE ARM FRLS cable

  • Length: 3750 metres for 3CX185 per unit; 500 metres for 3CX400 per unit

  • Construction: Aluminium conductor, XLPE insulation, ARM (armoured), FRLS jacket

  • Delivery: Based on BoQ sets A & B per Sl. No. 1 and 2; delivery period linked to original delivery date

  • Eligibility: Comply with ATC terms; no explicit standards listed in the data provided

Terms & Conditions

  • Quantity variation permitted up to 25% during order and currency of contract

  • Delivery period recalculated from last date of original delivery order; minimum extension rule

  • ATC terms govern all tender clauses; refer to spec document for full terms

Important Clauses

Payment Terms

Payment terms are defined in the ATC document; exact schedule not provided in the public data

Delivery Schedule

Delivery period commences from the last date of original delivery order; extension logic depends on quantity variation

Penalties/Liquidated Damages

Penalties or LD provisions are governed by ATC; not specified in the provided data

Bidder Eligibility

  • Experience in supplying high-voltage cables (6.6kV) with FRLS certification

  • Valid GST and PAN; financial stability demonstrated by turnover

  • Authorizations from OEM for 6.6kV XLPE FRLS cables

Tender Data

Bid Details

Quantity

8500

Category

PY9755591010_UNIT9

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

53

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

PY9755591010_UNIT8_A , PY9755591010_UNIT8_B , PY9755591028_UNIT8 , PY9755591010_UNIT9 , PY9755591028_UNIT9

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

160

Delivery Locations

1

Delivery Cities

Sambalpur

Delivery Pincodes

768212

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Subrahmanyam Teegireddy768212,Hindalco Industries Limited, Aditya Expansion Project - Smelter, Aditya Aluminium, Lapanga, Sambalpur -768212, Odisha.SambalpurOdisha7682123000160-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9817865.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Corrigendum Updates

1 Update
#1

Update

05-Sep-2026

Extended Deadline

15-Sep-2026, 9:30 am

Opening Date

16-Sep-2026, 9:30 am

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

PY9755591010_UNIT8_A

6.6KV UE 3CX185 AL XLPE ARM FRLS

3,000 metres Delivery: 160 days
#2

PY9755591010_UNIT8_B

6.6KV UE 3CX185 AL XLPE ARM FRLS

750 metres Delivery: 160 days
#3

PY9755591028_UNIT8

6.6KV UE 3CX400 AL XLPE ARM FRLS

500 metres Delivery: 160 days
#4

PY9755591010_UNIT9

6.6KV UE 3CX185 AL XLPE ARM FRLS

3,750 metres Delivery: 160 days
#5

PY9755591028_UNIT9

6.6KV UE 3CX400 AL XLPE ARM FRLS

500 metres Delivery: 160 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration

2

PAN Card

3

Experience Certificates for similar high-voltage cable supply

4

Financial Statements / Turnover documentation

5

EMD / Security Deposit submission details (as per ATC)

6

Technical bid documents demonstrating compliance with FRLS XLPE cable specs

7

OEM Authorization / Manufacturer’s Certificate for 6.6 kV cables

8

Any bid-specific documents as per Buyer ATC in the spec document

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid on Sambalpur 6.6kV cable tender in Odisha 2026

Bidders must submit the missing ATC-compliant documents, verify OEM authorizations, provide GST PAN details, and attach experience certificates for high-voltage cable supply. Ensure compliance with FRLS XLPE ARM specifications and submit EMD as per ATC. Review BoQ item splits A/B for correct quantity entries.

What documents are required for BHEL cable procurement in Sambalpur

Required documents include GST certificate, PAN, company financial statements, experience certificates for similar projects, OEM authorization for 6.6kV XLPE FRLS cables, technical compliance certificates, and EMD submission as per ATC. Ensure all documents reflect Odisha location and unit-specific cable types.

What are the technical specifications for 6.6kV XLPE FRLS cables in this tender

Cables are 6.6KV UE with 3CX185 and 3CX400 configurations, aluminium conductors, XLPE insulation, ARM armour, FRLS jacket. Lengths per unit are 3750 metres (3CX185) and 500 metres (3CX400). BoQ split into sets A and B; ensure bundles meet unit 8/9 requirements.

When is delivery expected for the Sambalpur cable order 6.6kV

Delivery timeline is tied to the original delivery order date; any extension is calculated as (increased quantity / original quantity) × original period, with a minimum 30 days, and may extend up to the original delivery period per option clause.

What are the EMD and payment terms for this BHEL tender

EMD amount is not disclosed in the available data; bidders must refer to the ATC for exact EMD and payment terms, including any advance or milestone payments and the schedule after approval of delivery.

What eligibility criteria must bidders meet for this Odisha cable tender

Bidders should have prior experience supplying high-voltage XLPE FRLS cables, demonstrate OEM authorization, provide financial statements showing stability, maintain GST/PAN compliance, and adhere to ATC terms governing quantity variation and delivery.

What is the scope of quantity variation allowed in this tender

Purchaser may increase or decrease quantity by up to 25% of bid or contracted quantity during order placement and currency of contract; delivery time scales accordingly, based on the extended quantity and measured from last delivery date.

What standards or branding requirements apply to the cables

The data references FRLS XLPE cables with aluminium conductors; OEM authorizations and ATC documents govern standards. No explicit IS or certification numbers are listed in the provided data; bidders must confirm via the ATC document.