Bid Publish Date
08-Sep-2026, 12:32 pm
Bid End Date
29-Sep-2026, 1:00 pm
Location
Progress
Organization: National Institute Of Technology Hamirpur (Department Of Higher Education) in Hamirpur, Himachal Pradesh. Procurement for a Wind Tunnel system (category: Wind Tunnel) with scope covering Supply, Installation, Testing, Commissioning, and Operator Training, plus any required statutory clearances. The contract includes a 1-year warranty from final acceptance and a mandatory OEM warranty submission at delivery. Bidder must specify make and model and upload a detailed product catalogue. Prior experience supplying similar equipment to IITs/NITs or Central/State government institutions is required. An option clause allows up to 25% quantity variation during and after contract execution. Delivery timelines tie to the original delivery period with adjustments for added quantity.
Product/service names: Wind Tunnel system
Quantities/volume: not specified
EMD/Estimated value: not specified
Experience: prior supply to IITs/NITs or central/state government institutions
Quality/Standards: not specified; rely on BoQ and ATC documents
Warranty: 1 year; OEM warranty certificates required
Option clause permits +/-25% quantity variation at contracted rates
Delivery starts from the last date of original delivery order; time extended for added quantity
1-year warranty from final acceptance; OEM warranty certificates required at delivery
Not specified in data; please refer to the main bid document and ATC for terms
Delivery period commences from the last date of the original delivery order; extended time applies with a minimum 30 days
Not detailed in provided data; check ATC/bid document for LD rates
Must have prior experience supplying wind tunnel equipment to IITs/NITs or central/state government institutions
Must provide make/model and detailed product catalogue
Must upload OEM authorizations or confirmations
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
70 %
Warranty Period
1 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Wind Tunnel
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
12
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Hamirpur
Delivery Pincodes
177005
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ashok Kumar | 177005,Registrar, National Institute of Technology Hamirpur | Hamirpur | Himachal Pradesh | 177005 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar wind tunnel equipment supplied to IITs/NITs or government institutions
Financial statements demonstrating financial capacity
EMD submission document (if applicable) or equivalent security
Technical bid documents and product catalogue with make/model
OEM authorization letters (if not the manufacturer)
Service centre/network details for after-sales support
Key insights about HIMACHAL PRADESH tender market
Bidders must submit detailed product catalogue with make and model, provide ISO/industry certifications if specified, attach experience certificates for similar equipment delivered to IITs/NITs or central/state government bodies, and comply with mandatory BoQ alignment. Include OEM authorizations and service network details; ensure EMD/document uploads as required by ATC.
Required documents include GST certificate, PAN, financial statements, experience certificates for similar wind tunnel projects, OEM authorizations, technical bid with product catalogue, and service centre details. Upload OEM warranty information and any statutory clearance certificates if applicable to installation.
Eligibility requires prior experience supplying wind tunnel systems to IITs/NITs or central/state government institutions, proven installation/training capabilities in India, and a detailed product catalogue with explicit make/model. Compliance with BoQ and ATC terms is mandatory for bid acceptance.
Delivery begins from the last date of the original delivery order; if quantity increases, extended delivery time is calculated as (additional quantity/original quantity) × original delivery period, minimum 30 days. The buyer may extend the period to match contracted quantities.
A 1-year warranty from final acceptance or post-installation testing is required. OEM warranty certificates must be provided at delivery. The bidder must have established service centers across India with installation, commissioning, training, troubleshooting, and maintenance capabilities.
Bidders must quote strictly based on the specified BoQ items and buyer-added ATC clauses; failure to align with BoQ or missing a required item catalog may lead to rejection. Ensure all certificates, product specifications, and model numbers match the tender’s stated requirements.
Submit experience certificates showing successful supply and deployment of similar wind tunnel systems to IITs/NITs or central/state government institutions, including installation/commissioning records, and contactable references. Include project values and delivery milestones where possible.
Provide OEM authorization letters or confirmations from the manufacturer, plus a verifiable list of Indian service centers near consignee locations. Include contact details and service response times to demonstrate robust after-sales support.