Progress
The procurement is led by the Gujarat Panchayats And Rural Housing Department for submersible pumpsets conforming to IS 8034 (V2) (Q2). The contract covers supply, installation, testing, commissioning, operator training, and associated statutory clearances, with the bidder required to operate within Gujarat state. The scope includes delivery, integration with existing systems, and training, with emphasis on adherence to State Government Purchase Policy 2024 and a strict non-negotiation stance on specifications.
Product: Submersible Pumpsets (Three Phase) conforming to IS 8034 (V2), Q2
Quantity: Not specified in BOQ; subject to 25% variation during contract
Delivery/installation: Supply, Installation, Testing, Commissioning, Operator Training
Standards: IS 8034 (V2); optional ISO certification as per ATC
Warranty/AMC: Not specified in data; verify during bid submission
EMD amount and payment terms determined by ATC; ensure submission with bid
Bidder must operate within Gujarat state; turnover requirement as per ATC
Installation certificate to be collected through the supplier; no specification negotiation
Scope includes statutory clearances and operator training; adherence to State Policy 2024
Payment terms to be defined in ATC; ensure alignment with delivery milestones and statutory clearances
Delivery period commences from last date of original order; extension per option clause with minimum 30 days
LDs to be specified in ATC; ensure timely delivery and commissioning
Turnover at least twice the average annual turnover over the last 3 years
Bidder must be physically located within Gujarat state
Compliance with State Government Purchase Policy-2024 and ISO requirements
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Submersible Pumpsets (Three Phase) Conforming To IS 8034 (V2) (Q2)
Payment Timelines
Payments shall be made to the Seller within 20 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Mahesana
Delivery Pincodes
384002
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Parmar Bhaveshkumar Mahendrabhai | 384002,Near Jilla Panchayat mehsana | Mahesana | Gujarat | 384002 | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar pumpset supply/installation
Financial statements (last 3 years) demonstrating turnover
EMD submission proof (mode and amount as per ATC)
Technical bid documents (compliance with IS 8034 (V2))
OEM authorization / authorized distributor certificate
ISO certification copy (as required by ATC)
Installation certificate (collected through supplier)
Any other statutory clearance documents if applicable
Key insights about GUJARAT tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD, technical compliance with IS 8034 (V2), OEM authorizations, and ISO certificates. Ensure Gujarat-state eligibility, turnover criteria, and installation certificate collection through supplier. Follow ATC terms, provide total bid price inclusive of supply, installation, testing, commissioning, and training.
Required documents include GST registration, PAN, 3-year financials, turnover proof (twice average), experience certificates for pumps installation, EMD, technical compliance, OEM authorization, and installation certificate collection process. Attach ISO certificate if applicable and ensure bid includes all cost components.
Pumps must conform to IS 8034 (V2) for three-phase submersible pumps. Purchaser may require additional certifications such as ISO; installation must be performed by the bidder with installation certificate collected via supplier. No negotiation on specifications is allowed.
Applicants must be Gujarat-based, with turnover at least twice the average annual turnover for the last three years. They must comply with the State Government Purchase Policy 2024, provide installation certificates through supplier, and hold ISO certification if required by ATC.
Delivery schedule follows the original order dates; option to increase quantities up to 25% with extended duration. The added time uses a calculation: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Scope includes supply, installation, testing, commissioning, operator training, and statutory clearances if needed. Installation certificates must be collected through the supplier, and training of operators is included in the bid price.
Submit your ISO certification copy as specified in ATC; if not mandatory, include any available ISO-related compliance documents. Ensure warranty/AMC terms are clarified in the bid and compatible with the IS 8034 (V2) requirement.