Progress
Samastipur District Panchayats of the Department Of Panchayati Raj, Bihar invites bids for a High Mast Lighting Octagonal Tower with Solar Based LED Street Light (V2) in Samastipur, Bihar (PIN 848101). The procurement covers the supply, installation, testing and commissioning of octagonal poles with integrated solar LED luminaires. Key scope elements include height specification, LED rating and pole wall thickness, with delivery to the Gram Panchayat area Ajnool, Samastipur. The ATC terms authorize quantity variation up to 25% and require a complete bid price covering installation, testing, and commissioning. The contract emphasizes on-site post-sale support via a network of service centers in India and a 1-year warranty from final acceptance.
High Mast Lighting Octagonal Tower with Solar Based LED Street Light
Pole height in meters (exact value not disclosed)
LED luminaires per pole (quantity per pole not disclosed)
Thickness of octagonal pole sheet in mm (exact value not disclosed)
LED rating/system wattage per luminaire (exact wattage not disclosed)
1-year OEM warranty; on-site service network in India
Delivery quantity may vary up to 25% during contract at contracted rates
Scope includes Supply, Installation, Testing and Commissioning
Warranty of 1 year with OEM certificates at delivery and service center details
Not specified in data; scope indicates payment aligned with supply, I&C and acceptance milestones
Delivery period will follow option clause; extended delivery time formula applies with minimum 30 days
No explicit LD details provided; bidders should assume standard contract penalties for delays
Experience in solar-based LED street lighting projects
Demonstrated installation and commissioning capability in rural Bihar or similarly located sites
Financial stability evidenced by recent financial statements and GST compliance
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
8
Past Performance
20 %
Warranty Period
1 years
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
High Mast Lighting Octagonal Tower With Solar Based LED Street Light (V2) (Q2)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Samastipur
Delivery Pincodes
848114
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Tejnarayan Ray | 848114,Panchayat - Salkhani, Samastipur Bihar | Samastipur | Bihar | 848114 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Certificate
PAN Card
Experience certificates demonstrating relevant street lighting or solar LED deployments
Financial statements showing turnover and stability
EMD/Security deposit (if applicable) and payment terms
Technical bid documents and OEM authorizations
Warranty certificates and OEM service center details
Installation, Commissioning, Testing documentation
| Category | Specification | Requirement |
|---|---|---|
| Generic | Height of Octagonal Pole (in meter) | 9.0 |
| Generic | Number of LED Street Light Luminaire for Each Octagonal Pole | 4 |
| Octagonal Pole Construction | Thickness of Octagonal Pole Sheet (in mm) | 3.0 |
| LED Luminaire | LED Rating/ System Wattage/ Rated Power (in Watt) | 40 |
Key insights about BIHAR tender market
Bidders should prepare GST, PAN, experience certificates, financial statements, and OEM authorizations; submit technical bid with installation capabilities, service centers in India, and compliance with the 1-year OEM warranty. Ensure on-site I&C scope and adaptation to Gram Panchayat Ajnool delivery address.
Required documents include GST registration, PAN, detailed experience certificates for solar street lighting, financial statements, EMD/security deposit if applicable, OEM authorization letters, and installation/commissioning plan with service center information in India.
Specifications cover pole height, octagonal pole thickness in mm, number of luminaires per pole, and LED wattage; exact values are not disclosed but bidders must provide standard compliance and installation capability, along with warranty certificates.
Delivery is governed by the option clause with potential 25% quantity variation; extended delivery time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days from the last delivery order date.
A 1-year warranty from final acceptance or after completion of installation; OEM warranty certificates must be supplied at delivery; post-sale service centers across India must be identified and shared with the bid.
Scope includes Supply, Installation, Testing and Commissioning of the High Mast Octagonal Tower with Solar LED luminaires; payment terms align with delivery milestones; ensure full lifecycle support and on-site commissioning.