Bid Publish Date
07-Sep-2026, 3:55 pm
Bid End Date
22-Sep-2026, 10:00 am
EMD
₹2,35,046
Value
₹1,38,67,686
Location
Progress
Public procurement opportunity for Airports Authority Of India HDPE of 40 mm diameter, Optical Fiber Cable 12 Core, OFC Patch Cords as per specifications, Cat 6 Patch Cords 1. 5 Mtr. , 24 Ports LIU fully loaded, 9 RU Wall Mountable Rack, 24 Port OFC Jointing Enclosures, SITC of Inspection chamber Manhole for Optical fiber. , Laying, Pulling of HDPE Pipe and backfilling, using HDD technology, Manually Laying, Pulling of HDPE Pipe and backfilling, Optical Fiber Cable Laying and Pulling, GI Pipe supply and installation. , Cable Route Markers, Surge protectors Devices for non PoE network as per specifications, Surge protectors Devices for PoE network as per specifications, Installation Testing and Commissioning in AMRITSAR, PUNJAB. Quantity: 47420 issued by. Submission Deadline: 22-09-2026 10: 00: 00. View full details and respond.
Quantity
47420
Category
Optical Fiber Cable 12 Core
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
46
OEM Avg. Turnover
552
Past Performance
50 %
Warranty Period
3 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
HDPE of 40 mm diameter , Optical Fiber Cable 12 Core , OFC Patch Cords as per specifications , Cat 6 Patch Cords 1.5 Mtr. , 24 Ports LIU fully loaded , 9 RU Wall Mountable Rack , 24 Port OFC Jointing Enclosures , SITC of Inspection chamber Manhole for Optical fiber. , Laying, Pulling of HDPE Pipe and backfilling, using HDD technology , Manually Laying, Pulling of HDPE Pipe and backfilling , Optical Fiber Cable Laying and Pulling , GI Pipe supply and installation. , Cable Route Markers , Surge protectors Devices for non PoE network as per specifications , Surge protectors Devices for PoE network as per specifications , Installation Testing and Commissioning
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
39
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Amritsar
Delivery Pincodes
143101
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ajay Kumar | 143101,AIRPORTS AUTHORITY OF INDIA, SGRDJ INTERNATIONAL AIRPORT, RAJASANSI, AMRITSAR (PUNJAB) | Amritsar | Punjab | 143101 | 11000 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
HDPE of 40 mm diameter
PLB HDPE of 40 mm diameter for underground Laying of OFC CableArmoured 12 Core Fiber Cable Single Mode
Optical Fiber Cable 12 Core
Armored 12 Core Fiber Cable Single Mode
OFC Patch Cords as per specifications
SC-SC Fiber Patch Cords Single Mode 10 Mtrs. as per Specification.
Cat 6 Patch Cords 1.5 Mtr.
Cat 6 Patch Cords of 1.5 Mtrs. as per Specification.
24 Ports LIU fully loaded
24 Port LIU Loaded Single Mode loaded with SC Coupler and pigtails.
9 RU Wall Mountable Rack
9U Rack with all accessories
24 Port OFC Jointing Enclosures
24 Port OFC Jointing Enclosure with all accessories
SITC of Inspection chamber Manhole for Optical fiber.
SITC of Inspection chamber Manhole for Optical fiber.
Laying, Pulling of HDPE Pipe and backfilling, using HDD technology
Laying, (using HDD technology) Pulling of HDPE Pipe and backfilling of pits.
Manually Laying, Pulling of HDPE Pipe and backfilling
Manually Laying, Pulling of HDPE Pipe and backfilling of trenches and pits etc.
Optical Fiber Cable Laying and Pulling
Laying, Pulling of OFC cable through HDPE duct, wall, raceway, ceiling, and through GI pipe etc.
GI Pipe supply and installation.
GI Pipe (40 mm) with couplings as per specification
Cable Route Markers
Cable Route Markers as per specifications
Surge protectors Devices for non PoE network as per specifications
19 inches patch panel surge protector, 24 ports (non-PoE) as per specifications.
Surge protectors Devices for PoE network as per specifications
19 inches patch panel surge protector, 24 ports (PoE) as per specifications.
Installation Testing and Commissioning
Laying of cable, installation, testing and commissioning of the above supplied items, splicing, documentation and integration of complete OFC network with required accessories as per specifications
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | HDPE of 40 mm diameter | PLB HDPE of 40 mm diameter for underground Laying of OFC CableArmoured 12 Core Fiber Cable Single Mode | 11,000 | meters | navaids_amritsar | 90 | |
| 2 | Optical Fiber Cable 12 Core | Armored 12 Core Fiber Cable Single Mode | 12,500 | meters | navaids_amritsar | 90 | |
| 3 | OFC Patch Cords as per specifications | SC-SC Fiber Patch Cords Single Mode 10 Mtrs. as per Specification. | 24 | nos | navaids_amritsar | 90 | |
| 4 | Cat 6 Patch Cords 1.5 Mtr. | Cat 6 Patch Cords of 1.5 Mtrs. as per Specification. | 120 | nos | navaids_amritsar | 90 | |
| 5 | 24 Ports LIU fully loaded | 24 Port LIU Loaded Single Mode loaded with SC Coupler and pigtails. | 5 | nos | navaids_amritsar | 90 | |
| 6 | 9 RU Wall Mountable Rack | 9U Rack with all accessories | 5 | nos | navaids_amritsar | 90 | |
| 7 | 24 Port OFC Jointing Enclosures | 24 Port OFC Jointing Enclosure with all accessories | 10 | nos | navaids_amritsar | 90 | |
| 8 | SITC of Inspection chamber Manhole for Optical fiber. | SITC of Inspection chamber Manhole for Optical fiber. | 30 | nos | navaids_amritsar | 90 | |
| 9 | Laying, Pulling of HDPE Pipe and backfilling, using HDD technology | Laying, (using HDD technology) Pulling of HDPE Pipe and backfilling of pits. | 10,500 | meters | navaids_amritsar | 90 | |
| 10 | Manually Laying, Pulling of HDPE Pipe and backfilling | Manually Laying, Pulling of HDPE Pipe and backfilling of trenches and pits etc. | 500 | meters | navaids_amritsar | 90 | |
| 11 | Optical Fiber Cable Laying and Pulling | Laying, Pulling of OFC cable through HDPE duct, wall, raceway, ceiling, and through GI pipe etc. | 12,500 | meters | navaids_amritsar | 90 | |
| 12 | GI Pipe supply and installation. | GI Pipe (40 mm) with couplings as per specification | 70 | meters | navaids_amritsar | 90 | |
| 13 | Cable Route Markers | Cable Route Markers as per specifications | 150 | nos | navaids_amritsar | 90 | |
| 14 | Surge protectors Devices for non PoE network as per specifications | 19 inches patch panel surge protector, 24 ports (non-PoE) as per specifications. | 3 | nos | navaids_amritsar | 90 | |
| 15 | Surge protectors Devices for PoE network as per specifications | 19 inches patch panel surge protector, 24 ports (PoE) as per specifications. | 2 | nos | navaids_amritsar | 90 | |
| 16 | Installation Testing and Commissioning | Laying of cable, installation, testing and commissioning of the above supplied items, splicing, documentation and integration of complete OFC network with required accessories as per specifications | 1 | nos | navaids_amritsar | 90 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer