Bid Publish Date
18-Oct-2026, 8:58 am
Bid End Date
28-Oct-2026, 9:00 am
Location
Progress
The Indian Army, Department Of Military Affairs, seeks procurement of critical vehicle and engine components including HEAD LAMP HIGH BEAM, HEAD LAMP LOW BEAM, OIL SEAL, DELETED HOSE, PART KIT PRESSURE REGULATIONG VALVE, and ASSY FUEL LINE FUEL FEED PUMP TO FUEL FILTER. The BOQ lists 6 items with unspecified quantities, targeting standard automotive and military-spec parts. Key differentiators include the option to adjust quantities by up to 25%, with extended delivery time based on the ratio of additional to original quantities, subject to a minimum of 30 days. The contract emphasizes compliance, sample submission before technical opening, and bank-certified EFT mandates. Location and start/end dates are not disclosed.
Product names: HEAD LAMP HIGH BEAM, HEAD LAMP LOW BEAM, OIL SEAL, DELETED HOSE, PART KIT PRESSURE REGULATIONG VALVE, ASSY FUEL LINE FUEL FEED PUMP TO FUEL FILTER
Quantities: 6 items with unspecified quantities
EMD/Estimated value: Not specified
Category: Automotive/military vehicle spare parts
Delivery: delivery period formula (additional quantity ÷ original quantity) × Original delivery period; minimum 30 days
Compliance: bid with Advance Sample before technical bid opening; no liquidation or bankruptcy; bank-issued EFT mandate
Quantity fluctuation up to 25% at contract award and during currency
Advance sample required before technical bid opening
Mandatory documents: PAN, GSTIN, Cancelled cheque, EFT mandate
Payment terms subject to ATC; bank EFT mandate must be provided; no fixed milestone details specified
Delivery period calculated as (additional quantity / original quantity) × Original delivery period; minimum 30 days
Not explicitly specified; subject to contract terms and ATC; sample submission prerequisite noted
Not under liquidation or court receivership
Able to provide PAN, GSTIN, EFT Mandate
Capable of supplying automotive/military spare parts and complying with advance sample requirement
Quantity
9
Bid Validity
30 (Days)
Bid Type
Service
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
HEAD LAMP HIGH BEAM , HEAD LAMP LOW BEAM , OIL SEAL , DELETED HOSE , PART KIT PRESSURE REGULATIONG VALVE , ASSY FUEL LINE FUEL FEED PUMP TO FUEL FILTER
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
Nagaon
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Nagaon | Nagaon | - | - | 2 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
HEAD LAMP HIGH BEAM
MAHINDRA SCORPIO
HEAD LAMP LOW BEAM
MAHINDRA SCORPIO
OIL SEAL
TATA 3 5 TON FAT
DELETED HOSE
5 TON STLN
PART KIT PRESSURE REGULATIONG VALVE
5 TON STLN
ASSY FUEL LINE FUEL FEED PUMP TO FUEL FILTER
TATA 3 5 TON FAT
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | HEAD LAMP HIGH BEAM | MAHINDRA SCORPIO | 2 | nos | [email protected] | 21 | |
| 2 | HEAD LAMP LOW BEAM | MAHINDRA SCORPIO | 2 | nos | [email protected] | 21 | |
| 3 | OIL SEAL | TATA 3 5 TON FAT | 2 | nos | [email protected] | 21 | |
| 4 | DELETED HOSE | 5 TON STLN | 1 | nos | [email protected] | 21 | |
| 5 | PART KIT PRESSURE REGULATIONG VALVE | 5 TON STLN | 1 | nos | [email protected] | 21 | |
| 6 | ASSY FUEL LINE FUEL FEED PUMP TO FUEL FILTER | TATA 3 5 TON FAT | 1 | nos | [email protected] | 21 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Advance sample submission before technical bid opening
Certificates as per Bid Document / ATC
Undertaking stating non-liquidation / non-bankruptcy
Any additional OEM authorizations if required by ATC
Bidders must submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate; provide Advance Sample before technical bid opening; ensure non-liability status and certificate uploads per ATC; follow quantity adjustment clause up to 25% and delivery formula with minimum 30 days.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, Advance Sample, and any certificates specified in Bid Document/ATC; bidder must confirm non-liquidation status with an undertaking.
Specifications mention HEAD LAMP HIGH BEAM, HEAD LAMP LOW BEAM, OIL SEAL, DELETED HOSE, PART KIT PRESSURE REGULATIONG VALVE, and FUEL LINE/FUEL FEED PUMP ASSEMBLY; exact part numbers not provided; compliance with applicable standards is required per ATC.
Advance sample submission is required prior to opening of technical bids; failure to submit may lead to rejection; ensure samples are representative of the six listed parts and conform to requested standards.
Delivery time follows: (additional quantity ÷ original quantity) × Original delivery period, with a minimum of 30 days; extended delivery time can be used when quantity increases occur during the contract period.
Explicit LD/penalty details are not provided in the ATC; penalties would be governed by the contract terms and standard government procurement rules; bidders should look for ATC clarifications and ensure timely delivery.
Bidders must certify they are not under liquidation or bankruptcy; provide an undertaking with bid; ensure financial stability with supporting statements as required by the Bid Document.
BOQ includes six items: HEAD LAMP HIGH BEAM, HEAD LAMP LOW BEAM, OIL SEAL, DELETED HOSE, PART KIT PRESSURE REGULATIONG VALVE, ASSY FUEL LINE FUEL FEED PUMP TO FUEL FILTER; quantities unspecified.