TenderDekho Logo
Active GEM

Indian Army UAV Tender East Sikkim for Long-Endurance UAV with EO Payload & Smart Battery Hub 2026

Bid Publish Date

05-Sep-2026, 1:40 pm

Bid End Date

15-Sep-2026, 2:00 pm

Progress

Issue05-Sep-2026, 1:40 pm
AwardPending

Tender Overview

The opportunity is issued by the Indian Army (Department Of Military Affairs) for the procurement of a Long-Endurance Unmanned Aerial Vehicle (UAV) with an Electro-Optical Imaging Payload and a UAV Smart Battery Charging Hub, located in East Sikkim, 737101. The bid covers the entire scope: supply, installation, testing, commissioning, operator training, and any statutory clearances. The contract may include an option to increase quantity by up to 25% of the bid quantity during or after award, with delivery timelines adjusted accordingly. The emphasis is on integrated drone systems capable of extended mission endurance with compliant payloads and charging infrastructure.

Technical Specifications & Requirements

  • Product category: Long-Endurance UAV with EO imaging payload and Smart Battery Charging Hub; exact model not disclosed in data.
  • Certification requirements: ISO 9001 certification for bidder or OEM; BIS licence and type-test certificates may be required; material certificates to be submitted with supply.
  • Service support: dedicated/toll-free service number and escalation matrix; required to have a functional service centre in the state of each consignee location or establish one within 30 days of award.
  • Quality & acceptance: Material Test Certificate must accompany supply; buyer lab results to be sole acceptance criterion.
  • Scope of supply: includes supply, installation, testing, commissioning, operator training, and statutory clearances, if any.
  • Delivery mechanics: option clause governs extended delivery periods; delivery begins from the last date of the original delivery order.
  • Documentation: OEM authorizations and all relevant certificates as per product specification.

Terms, Conditions & Eligibility

  • EMD: amount not disclosed in available data.
  • Delivery & quantity: option to increase quantity by up to 25%; extended delivery period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
  • Payment terms: not disclosed in data; contract requires compliance with scope including installation and commissioning.
  • Warranty/after-sales: service centres required in consignee state; escalation matrix to be provided; on-site or carry-in warranty terms depend on product.
  • Documentation: bidders must upload ISO 9001 certificate, BIS/type-test certificates, and other certificates as per product specification; material test certificates to be included.
  • Compliance: non-submission of certificates may lead to rejection; dedicated service support must be provided by OEM/bidder.

Key Specifications

  • Product: Long-Endurance UAV with Electro-Optical Imaging Payload

  • Auxiliary: UAV Smart Battery Charging Hub

  • Standards: ISO 9001; BIS licence; type-test certificates

  • Delivery: flexible up to 25% quantity increase with calculated extended delivery period

  • Service: dedicated toll-free support; service centers in each consignee state or 30-day establishment window

  • Documentation: Material Test Certificate; OEM authorization; product-specific certificates

Terms & Conditions

  • Option clause allows up to 25% quantity increase during contract

  • ISO 9001 certification required for bidder or OEM

  • Material Test Certificate and BIS/type-test certificates mandatory

  • Dedicated service support and regional service centres required

  • Delivery timeline adjusts with extended period formula

Important Clauses

Payment Terms

Not disclosed in data; typical defense procurement terms apply per contract

Delivery Schedule

Delivery commences from the last date of the original delivery order; option quantity adjustments possible with extended delivery period calculation

Penalties/Liquidated Damages

Not specified in data; penalties to be defined in bid document per normative terms

Bidder Eligibility

  • ISO 9001 certified bidder or OEM for offered UAV systems

  • BIS licence and type-test certificates for the product

  • Functional service centre or proven establishment plan in each consignee state within 30 days of award

Tender Data

Bid Details

Quantity

2

Category

Long-Endurance Unmanned Aerial Vehicle (UAV) with Electro-Optical Imaging Payload

Bid Type

Two Packet Bid

Bid Validity

110 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Long-Endurance Unmanned Aerial Vehicle (UAV) with Electro-Optical Imaging Payload , UAV Smart Battery Charging Hub

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

East Sikkim

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-East SikkimEast Sikkim--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9851175.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 6

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for UAV/defense procurement

4

Financial statements (as required by terms)

5

EMD/Security deposit documentation (if applicable)

6

ISO 9001 certificate (bidder or OEM)

7

BIS licence and type-test certificates

8

Material Test Certificate

9

OEM authorization letter (if applicable)

10

Service centre details and escalation matrix

Frequently Asked Questions

Key insights about SIKKIM tender market

How to bid for the UAV tender in East Sikkim for 2026?

Bidders must meet ISO 9001 certification (bidder or OEM), BIS/type-test certificates, and provide Material Test Certificate. Include OEM authorization, service centre plan, and escalation matrix. Ensure supply, installation, testing, commissioning, operator training, and any statutory clearances are covered in the bid.

What documents are required for the Indian Army UAV procurement bid in East Sikkim?

Submit GST and PAN, experience certificates in UAV/defense, financial statements, EMD documentation (if applicable), ISO 9001, BIS license, type-test certificates, OEM authorization, Material Test Certificate, and service centre details with escalation matrix.

What standards and certifications must the UAV supplier meet for this tender?

Suppliers must hold ISO 9001 certification; BIS licence; product type-test certificates; Material Test Certificate; OEM authorizations where required. Compliance ensures acceptance by the Indian Army under the East Sikkim tender.

What is the delivery and quantity flexibility in this UAV contract?

The purchaser may increase quantity up to 25% of bid quantity during contract; extended delivery period formula applies: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

What is required for after-sales support in this UAV tender?

Bidder/OEM must provide a dedicated toll-free service number, an escalation matrix, and establish or demonstrate functional service centres in each consignee state, within 30 days of award, with documentary evidence prior to payment release.

What components are included in the scope of supply for this UAV tender?

Scope includes supply, installation, testing, commissioning, operator training, and providing any statutory clearances required, plus integration with the UAV smart battery charging hub and EO payload system.

What acceptance criteria are specified for delivered UAV equipment?

Material Test Certificate accompanies supply; buyer’s laboratory results are the sole acceptance criterion; conformity to ISO 9001, BIS/type-test certificates, and product-specific requirements must be demonstrated.

How should bidders demonstrate service capability for this Indian Army tender?

Provide dedicated service contact, escalation details, and evidence of a regional service centre or plan to establish one within 30 days; ensure on-site or carry-in warranty terms as applicable.