Bid Publish Date
29-Jul-2026, 1:15 pm
Bid End Date
04-Sep-2026, 1:00 pm
Value
₹60,00,000
Location
Progress
National Institute Of Animal Biotechnology (niab) invites bids for Rheometer, Peltier based temperature control system, Measuring systems for shear rheology, Air dryer, Compressor, Software and testing protocols, Demonstration Installation and Commissioning Site Acceptance Testing and User Training in Rangareddi, TELANGANA. Quantity: 7. Submission Deadline: 04-09-2026 13: 00: 00. Submit your proposal before the deadline.
Quantity
7
Category
Rheometer
Bid Type
Two Packet Bid
Bid Validity
100 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
30
OEM Avg. Turnover
100
Past Performance
70 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Rheometer , Peltier based temperature control system , Measuring systems for shear rheology , Air dryer , Compressor , Software and testing protocols , Demonstration Installation and Commissioning Site Acceptance Testing and User Training
Advisory Bank
PUNJAB NATIONAL BANK
ePBG Percentage
5%
ePBG Duration (Months)
62
Pre-Bid Date
04-08-2026 11:00:00
Pre-Bid Venue
NIAB conference room
Max Delivery Days
75
Delivery Locations
1
Delivery Cities
Ranga Reddy
Delivery Pincodes
500032
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Santosh Namdeo | 500032,National Institute of Animal Biotechnology (NIAB), Opp. Journalist Colony, Near Gowlidoddy,Extended Q City Road, Gachibowli, Hyderabad, Telangana, India PIN: 500 032 | Ranga Reddy | Telangana | 500032 | 1 | 75 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Rheometer
Rheometer (All technical details as per Bid Specification)
Peltier based temperature control system
Peltier based temperature control system (All technical details as per Bid Specification)
Measuring systems for shear rheology
Measuring systems for shear rheology (All technical details as per Bid Specification)
Air dryer
Air dryer (All technical details as per Bid Specification)
Compressor
Compressor (All technical details as per Bid Specification)
Software and testing protocols
Software and testing protocols (All technical details as per Bid Specification)
Demonstration Installation and Commissioning Site Acceptance Testing and User Training
Demonstration Installation and Commissioning Site Acceptance Testing and User Training (All technical details as per Bid Specification)
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Rheometer | Rheometer (All technical details as per Bid Specification) | 1 | no | [email protected] | 75 | |
| 2 | Peltier based temperature control system | Peltier based temperature control system (All technical details as per Bid Specification) | 1 | no | [email protected] | 75 | |
| 3 | Measuring systems for shear rheology | Measuring systems for shear rheology (All technical details as per Bid Specification) | 1 | set | [email protected] | 75 | |
| 4 | Air dryer | Air dryer (All technical details as per Bid Specification) | 1 | no | [email protected] | 75 | |
| 5 | Compressor | Compressor (All technical details as per Bid Specification) | 1 | no | [email protected] | 75 | |
| 6 | Software and testing protocols | Software and testing protocols (All technical details as per Bid Specification) | 1 | no | [email protected] | 75 | |
| 7 | Demonstration Installation and Commissioning Site Acceptance Testing and User Training | Demonstration Installation and Commissioning Site Acceptance Testing and User Training (All technical details as per Bid Specification) | 1 | lot | [email protected] | 75 |
Extended Deadline
04-Sep-2026, 7:30 am
Opening Date
04-Sep-2026, 8:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer