TenderDekho Logo
Active GEM

Bharat Petroleum Corporation Ltd fuel gas coalescer tender Mumbai Maharashtra 2026 ISI/ISO compliant

Bid Publish Date

31-Jul-2026, 6:47 pm

Bid End Date

15-Sep-2026, 2:00 pm

Generate Docs

Progress

Issue31-Jul-2026, 6:47 pm
Corrigendum07-Sep-2026
AwardPending

Key Highlights

  • Mandatory price-breakup submission in prescribed GeM format
  • 25% quantity variation rights at contract and during currency
  • NDA/Secrecy Declaration required for confidential technical documents
  • GeM-tender hierarchy prevails over portal numbers in contradictions

Tender Overview

Organization: Bharat Petroleum Corporation Ltd. Procuring fuel gas coalescer with mandatory spares, freight, and P&F including GST at Mumbai, Maharashtra. Tender scope references a seller providing a complete coalescing unit with related spares, freight, and handling charges. Estimated value and quantities are not disclosed. The tender emphasizes contractual flexibility for quantity variations up to 25%, and a delivery-time calculation method tied to the original delivery period. A strong emphasis is placed on price-break-up submission and compliance with confidentiality and NDA requirements for technical documents. Unique terms include option-based delivery extensions and adherence to GeM-Tender hierarchy in case of contradictions.

Technical Specifications & Requirements

  • No explicit technical specifications or BOQ items are provided in the tender data. Critical terms include: 25% quantity variation rights, delivery period alignment to last delivery order, and interim delivery-time calculation formula. Bidders must ensure their bid documents are consistent with tender-level terms and the NIT/Tender documents.
  • Price break-up must be uploaded in the prescribed format on GeM, separate from the unpriced bid. Access to technical MR documents is password protected and requires signing an NDA/secrecy declaration. Password sharing is restricted to compliant bidders only. The vendor must be prepared to access licensor confidential documents and adhere to EPCM secrecy requirements.

Terms, Conditions & Eligibility

  • Quantity variation up to 25% at contract placement and during currency with contracted rates.
  • Price-break-up must be uploaded in the prescribed GeM format; unpriced bids will be rejected.
  • Access to Technical MR documents requires a signed NDA/Secrecy Declaration; password shared only after compliance.
  • In case of contradictions between GeM portal numbers and tender document terms, tender documents prevail.
  • No explicit EMD, GST, or eligibility criteria are stated beyond confidentiality and bid format requirements.

Key Specifications

  • Product/service: fuel gas coalescer with mandatory spares and freight

  • Delivery terms: extended delivery period allowed with option clause

  • Contract terms: quantity variation up to 25% at placement and during currency

  • Documentation: price break-up in prescribed format; separate from unpriced bid

  • Confidential access: NDA/Secrecy Declaration required for technical documents

  • Compliance: adhere to tender document terms over portal data in conflicts

Terms & Conditions

  • Option quantity clause allowing up to 25% variation at contracted rates

  • Mandatory price-breakup submission format on GeM portal

  • Secrecy Declaration and NDA required for confidential technical documents

Important Clauses

Payment Terms

Not specified in tender data; verify in tender documents and GeM portal.

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time proportional to (increased quantity/original quantity) × original period, minimum 30 days.

Penalties/Liquidated Damages

Not specified in tender data; potential LD will be outlined in tender documents.

Bidder Eligibility

  • Experience in supplying fuel processing equipment or coalescers (preferred)

  • Ability to submit price-breakup in GeM prescribed format

  • Willingness to sign NDA/secrecy declaration and access Licensor Confidential Documents

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

FUEL GAS COALESCER included Mandatory spares, Freight, P&F, with GST

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

24

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

456

Delivery Locations

1

Delivery Cities

Mumbai Suburban

Delivery Pincodes

400074

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Vikram Ramkumar Gupta400074,BPCL Mumbai Refinery, Admin building, South block, Second floor, CPO RPP, Mahul, Mumbai - 400074Mumbai SuburbanMaharashtra4000741456-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASBHARAT PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 14

GeM-Bidding-9687048.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Projects Procurement Mr Mumbai

Grievance Contact

[email protected]

Corrigendum Updates

6 Updates
#1

Update

07-Sep-2026

Extended Deadline

15-Sep-2026, 8:30 am

Opening Date

16-Sep-2026, 8:30 am

#2

Update

27-Aug-2026

Extended Deadline

07-Sep-2026, 8:30 am

Opening Date

07-Sep-2026, 9:00 am

#3

Update

24-Aug-2026

Extended Deadline

31-Aug-2026, 8:30 am

Opening Date

31-Aug-2026, 9:00 am

#4

Update

17-Aug-2026
#5

Update

17-Aug-2026

Extended Deadline

24-Aug-2026, 8:30 am

Opening Date

24-Aug-2026, 9:00 am

#6

Update

14-Aug-2026

Extended Deadline

17-Aug-2026, 8:30 am

Opening Date

17-Aug-2026, 9:00 am

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (relevant to fuel gas coalescer or similar equipment)

4

Financial statements (as applicable to bid eligibility)

5

EMD/Security deposit details (not explicitly specified; bidders should verify on GeM)

6

Technical bid documents excluding confidential MR; NDA/Secrecy Declaration

7

OEM authorizations (if applicable for licensor confidential documents)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for BPCL fuel gas coalescer tender in Mumbai 2026?

Bidders must submit price-breakup in the GeM prescribed format and provide all required bid documents. Access to technical MR requires NDA/Secrecy Declaration; ensure compliance before download. The contract allows up to 25% quantity variation and delivery time is calculated from the last date of the original order.

What documents are required for BPCL fuel coalescer procurement in Mumbai 2026?

Submit GST registration, PAN card, experience certificates for similar equipment, and financial statements. Include OEM authorizations if applicable and ensure NDA/secrecy declaration is completed to access confidential technical documents. GeM bid must include separate priced bid and unpriced bid with no disclosure.

What are the delivery terms for BPCL Mumbai tender 2026?

Delivery starts from the last date of the original delivery order. If quantity increases, extended time equals (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. The purchaser may extend up to the original delivery period while exercising the option clause.

What is the required secrecy documentation for BPCL tender 2026?

Bidders must execute an NDA/Secrecy Declaration to access Technical MR documents. Password sharing is restricted; only compliant bidders receive the password. Non-compliance leads to bid rejection and potential legal action.

What constitutes the price-breakup submission for BPCL Mumbai tender?

Prices must be uploaded in the prescribed GeM price-breakup format, signed and stamped. The unpriced bid must not disclose pricing values. The priced bid must remain in the price bid section on GeM; violations lead to rejection.

Are there any warranty or penalty clauses stated for BPCL Mumbai 2026?

No explicit warranty or LD terms are disclosed in the tender data. Penalties, if any, will be detailed in the GeM tender documents or contract; bidders should verify during bid submission and check for LD provisions in the final contract.