Bid Publish Date
11-Aug-2026, 7:23 pm
Bid End Date
28-Aug-2026, 8:00 pm
EMD
₹40,400
Value
₹32,24,373
Location
Progress
South Eastern Coalfields Limited invites bids for Dismantling and Laying of Haulage Track Line in KORIYA, CHHATTISGARH. Estimated value: ₹3,224,373.28 incl. GST; EMD: ₹40,400. Scope includes dismantling 200m of 30lbs rail (100m length x 2), erection of accessories, transportation and stacking of rails and sleepers within 100m lead, and subsequent laying of track line with sleepers and rails on both sides. The contract specifies GMSOR 2019 reference items for cost benchmarks and manpower requirements (18 unskilled for dismantling; 20 unskilled for laying). This is a percentage-quote based handling/transport and other mining service contract under Coal India Limited framework.
Dismantling of Haulage track line: 100m length per unit, 30lbs rail, 18 unskilled manpower
Laying of Haulage track line: 100m length per unit, 30lbs rail on both sides, 20 unskilled manpower
Material handling within 100m lead, stacking of sleepers and rails at end of track line
GMSOR 2019 item references for unit rates; 18% GST on total value
EMD ₹40,400 required with bid submission
Delivery based on 100m track unit execution under GMSOR 2019
Payment terms aligned to BOQ-based rates with GST 18%
BOQ-based payment with GST at 18%; EMD submitted at bid time; no advance mentioned
Execution tied to 100m track unit work; coordination with Engineer-In-Charge; on-site directives govern progress
Not explicitly specified in provided terms
Experience in track dismantling and laying within mining or heavy industry
Ability to mobilize 18-20 unskilled workers for 8-hour shifts
Financial stability with GST compliance and clear EMD submission
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
7 Days
EMD Required
Yes
MII Compliance
Yes
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Experience Required
3 Year (s)
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Handling ,Transport and Other Mining Services - Percentage quote based - Dismantling of track line cleaning and removal of soil mulma packing ballast excavated material floor cutting in stone relaying of track line packing of Relaid track line in the..
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
GST certificate
PAN card
Experience certificates demonstrating similar track dismantling/laying work
Financial statements or solvency documents
EMD payment proof (DD/online transfer receipt)
Technical bid documents showing compliance to GMSOR 2019 references
OEM authorizations or equipment-specific certifications if applicable
Key insights about CHHATTISGARH tender market
Bidders must submit GST certificate, PAN, experience certificates, financial statements, EMD receipt of ₹40,400, technical bid with GMSOR 2019 references, and OEM authorizations if applicable. Ensure alignment with 18% GST on total value and provide track-work experience evidence.
The BOQ references GMSOR 2019 items for 100m units: item 41 for dismantling and item 38 for laying; unit rates given per meter or cubic measurements in the reference table, with lead distances up to 100m and corresponding material handling tasks.
EMD is ₹40,400. Estimated contract value is ₹3,224,373.28 inclusive of GST; GST rate is 18%. Payments follow BOQ-based rates with material handling and labor requirements specified.
Dismantling requires 18 unskilled workers; laying requires 20 unskilled workers, both on an 8-hour shift. Supervision by Engineer-In-Charge remains mandatory during execution.
Work is governed by GMSOR 2019 references for item numbers 41 (dismantling) and 38 (laying). Specific IS or BIS standards are not listed; ensure compliance with on-site directives from the Engineer-In-Charge.
Submit bids with all mandatory documents, EMD, and technical compliance as per T&C. While exact dates are not provided here, prepare and submit promptly following the standard SECL procurement deadlines.
Key deliverables include dismantled rails and sleepers stacked at the end of the track line, transportation within 100m lead, installation of dog nails and fish plates, and proper alignment of rails with sleepers on both sides of the track.
Ensure GST registration is active and reflect 18% GST in billing. Submit tax invoices with the EMD and BOQ-based itemization; payments follow the stated BOQ rates and are processed per the contract terms after delivery and acceptance.