TenderDekho Logo
Active GEM

Indian Army Department Of Military Affairs AC & Stabilizer Tender Nainital Uttarakhand 1.5 Ton AC ISO 9001 2026

Bid Publish Date

17-Oct-2026, 2:26 pm

Bid End Date

27-Oct-2026, 3:00 pm

Progress

Issue17-Oct-2026, 2:26 pm
AwardPending

Key Highlights

  • • ISO 9001 certification required for bidder or OEM (quality management)
  • • Up to 25% quantity variation allowed during contract with prorated delivery
  • • Scope includes supply, installation, testing, commissioning, training, and statutory clearances
  • • UPS specification: 1 KVA online; AC stands and stabilizers included

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for the procurement package covering 1.5 Ton ACs, AC stands, stabilizers for 1.5 ton AC, AC installation charges, and UPS 1 KVA online at NAINITAL, UTTARAKHAND. The scope includes supply, installation, testing, commissioning, operator training, and obtaining any required statutory clearances. The project emphasizes ISO 9001 certification for the bidder or OEM, ensuring standardized quality management across supplied units. The BOQ lists five items, though item-level quantities are not disclosed in the available data. The delivery model accommodates quantity adjustments up to 25% during contract execution, enabling flexibility for equipment parity and site readiness. The procurement is positioned as a government-tender with a focus on integrated HVAC and power backup solutions within a military context.

Technical Specifications & Requirements

  • Product categories: Air conditioning units (1.5 ton), installation components (stands, stabilizers), UPS (1 KVA online), and related installation charges.
  • Quality standard: ISO 9001 certification required for bidder or OEM.
  • Scope of supply: Includes supply, installation, testing, commissioning, operator training, and statutory clearances if applicable.
  • Delivery/quantity flexibility: Up to 25% increase/decrease in bid quantity and contracted quantity with proportional delivery time calculations.
  • Documentation expectations: ISO 9001 compliance proof; OEM authorization may be required; training and handover documentation.
  • Location: NAINITAL, UTTARAKHAND with unit installation at designated sites per Army requirements.
  • BOQ context: Total items: 5; specific item details not disclosed in the current data.

Terms, Conditions & Eligibility

  • Option clause: Quantity can be adjusted by up to 25% during contract, with delivery extension rules.
  • Assignment/Sub-contracting: Requires prior written consent from purchaser; ultimate liability remains with seller.
  • Scope of supply: Includes training and statutory clearances if required; all cost components included in bid price.
  • Certification: ISO 9001 certification mandatory for bidder or OEM.
  • ATC reference: Additional terms published in Buyer ATC document; ensure to view prior to submission.
  • General compliance: Bidder must meet all ATC terms and provide required documentation and assurances for performance.

Key Specifications

  • Product category: 1.5 ton air conditioner, AC stands, stabilizers for 1.5 ton AC

  • Power backup: UPS 1 KVA online

  • Installation charges included in scope

  • ISO 9001: certification required for bidder or OEM

  • Scope includes installation, testing, commissioning, and operator training

  • Delivery quantity flexibility up to 25% with extended delivery period rules

Terms & Conditions

  • Option clause allows ±25% quantity change during contract

  • ISO 9001 certification mandatory for bidder or OEM

  • Scope includes supply, installation, testing, commissioning, training

  • Delivery period adjustments tied to quantity changes with minimum 30 days

  • No sub-contracting without purchaser consent; joint liability remains

Important Clauses

Payment Terms

Not specified in provided data; bidders should verify ATC for payment milestones and invoicing requirements.

Delivery Schedule

Delivery period linked to last date of original delivery order; additional time formula applies during option exercise.

Penalties/Liquidated Damages

Not detailed in current data; ATC may specify LD terms and performance bonds.

Bidder Eligibility

  • Proven experience in supplying HVAC and UPS solutions to government or military agencies

  • ISO 9001 certified bidder or OEM

  • Financial ability to undertake integrated supply, installation, and training contract

Advertisement

Tender Data

Bid Details

Quantity

9

Category

1.5 Ton AC

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

1.5 Ton AC , Ac Stand , Stablizer for 1.5 ton AC , AC Installation charges , UPS 1 KVA online

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Nainital

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NainitalNainital--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10052121.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

1.5 Ton AC

1.5 Ton AC

2 pieces Delivery: 15 days
#2

Ac Stand

Ac Stand

2 pieces Delivery: 15 days
#3

Stablizer for 1.5 ton AC

Stablizer for 1.5 ton AC

2 pieces Delivery: 15 days
#4

AC Installation charges

AC Installation charges

2 pieces Delivery: 15 days
#5

UPS 1 KVA online

UPS 1 KVA online

1 pieces Delivery: 15 days
Advertisement

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar HVAC/UPS projects

4

Financial statements (as required by tender)

5

EMD related documents (as applicable per ATC) or equivalent security

6

Technical bid documents demonstrating ISO 9001 compliance

7

OEM authorization/certificates for offered products

8

Any statutory clearances or training plan documents

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for AC and UPS tender in Nainital Uttarakhand 2026

Bidders must submit GST, PAN, experience certificates, financials, and EMD as applicable per ATC. Ensure ISO 9001 certification proof for bidder or OEM, provide OEM authorizations, and detailed installation, testing, commissioning plans. Delivery terms allow up to 25% quantity variation with corresponding schedule adjustments.

What documents are required for Army HVAC tender submission in Uttarakhand

Required documents include GST registration, PAN, experience certificates for HVAC/UPS projects, financial statements, EMD documentation, ISO 9001 proof, OEM authorization, and installation/training plan. ATC may specify additional references; ensure all documents align with provided terms.

What standards must bidders meet for this Army procurement

Bidders must hold ISO 9001 certification for the bidder or OEM. Product offerings should align with military procurement expectations, and training/clearance provisions must be documented. Verify any additional standards in the Buyer ATC document before submission.

When is the delivery timeline and quantity variation allowed

Delivery timing depends on the last date of the original delivery order; if the option clause is exercised, additional time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.

How is payment structured for Army AC procurement in Uttarakhand

Payment terms are defined in ATC; bidders should anticipate milestone-based invoicing after supply, installation, testing, and commissioning. Ensure documentation aligns with the specified timeline and any required performance criteria in the ATC.

What is included in the scope of supply for this tender

Scope includes supply of 1.5 ton AC units, stands, stabilizers, UPS 1 KVA online, installation charges, testing, commissioning, operator training, and any statutory clearances required by regulations for Army sites.

Are OEM authorizations mandatory for this Army procurement

Yes, OEM authorizations are typically required if the offered products are not manufactured by the bidding firm. Provide official authorization letters and product-specific compliance documentation within the technical bid per ATC.

What are the key risk factors for bidders in this tender

Key risks include ensuring ISO 9001 compliance, meeting installation and training obligations, confirming quantity variation capabilities, coordinating with Army installation sites, and securing timely delivery to fulfill the 30+ day minimum schedule under varying demand.

Advertisement