Bid Publish Date
17-Oct-2026, 2:26 pm
Bid End Date
27-Oct-2026, 3:00 pm
Location
Progress
The Indian Army, Department Of Military Affairs, invites bids for the procurement package covering 1.5 Ton ACs, AC stands, stabilizers for 1.5 ton AC, AC installation charges, and UPS 1 KVA online at NAINITAL, UTTARAKHAND. The scope includes supply, installation, testing, commissioning, operator training, and obtaining any required statutory clearances. The project emphasizes ISO 9001 certification for the bidder or OEM, ensuring standardized quality management across supplied units. The BOQ lists five items, though item-level quantities are not disclosed in the available data. The delivery model accommodates quantity adjustments up to 25% during contract execution, enabling flexibility for equipment parity and site readiness. The procurement is positioned as a government-tender with a focus on integrated HVAC and power backup solutions within a military context.
Product category: 1.5 ton air conditioner, AC stands, stabilizers for 1.5 ton AC
Power backup: UPS 1 KVA online
Installation charges included in scope
ISO 9001: certification required for bidder or OEM
Scope includes installation, testing, commissioning, and operator training
Delivery quantity flexibility up to 25% with extended delivery period rules
Option clause allows ±25% quantity change during contract
ISO 9001 certification mandatory for bidder or OEM
Scope includes supply, installation, testing, commissioning, training
Delivery period adjustments tied to quantity changes with minimum 30 days
No sub-contracting without purchaser consent; joint liability remains
Not specified in provided data; bidders should verify ATC for payment milestones and invoicing requirements.
Delivery period linked to last date of original delivery order; additional time formula applies during option exercise.
Not detailed in current data; ATC may specify LD terms and performance bonds.
Proven experience in supplying HVAC and UPS solutions to government or military agencies
ISO 9001 certified bidder or OEM
Financial ability to undertake integrated supply, installation, and training contract
Quantity
9
Category
1.5 Ton AC
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
20 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
1.5 Ton AC , Ac Stand , Stablizer for 1.5 ton AC , AC Installation charges , UPS 1 KVA online
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Nainital
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Nainital | Nainital | - | - | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
1.5 Ton AC
1.5 Ton AC
Ac Stand
Ac Stand
Stablizer for 1.5 ton AC
Stablizer for 1.5 ton AC
AC Installation charges
AC Installation charges
UPS 1 KVA online
UPS 1 KVA online
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 1.5 Ton AC | 1.5 Ton AC | 2 | pieces | stnhq@buyer2 | 15 | |
| 2 | Ac Stand | Ac Stand | 2 | pieces | stnhq@buyer2 | 15 | |
| 3 | Stablizer for 1.5 ton AC | Stablizer for 1.5 ton AC | 2 | pieces | stnhq@buyer2 | 15 | |
| 4 | AC Installation charges | AC Installation charges | 2 | pieces | stnhq@buyer2 | 15 | |
| 5 | UPS 1 KVA online | UPS 1 KVA online | 1 | pieces | stnhq@buyer2 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar HVAC/UPS projects
Financial statements (as required by tender)
EMD related documents (as applicable per ATC) or equivalent security
Technical bid documents demonstrating ISO 9001 compliance
OEM authorization/certificates for offered products
Any statutory clearances or training plan documents
Key insights about UTTARAKHAND tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD as applicable per ATC. Ensure ISO 9001 certification proof for bidder or OEM, provide OEM authorizations, and detailed installation, testing, commissioning plans. Delivery terms allow up to 25% quantity variation with corresponding schedule adjustments.
Required documents include GST registration, PAN, experience certificates for HVAC/UPS projects, financial statements, EMD documentation, ISO 9001 proof, OEM authorization, and installation/training plan. ATC may specify additional references; ensure all documents align with provided terms.
Bidders must hold ISO 9001 certification for the bidder or OEM. Product offerings should align with military procurement expectations, and training/clearance provisions must be documented. Verify any additional standards in the Buyer ATC document before submission.
Delivery timing depends on the last date of the original delivery order; if the option clause is exercised, additional time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Payment terms are defined in ATC; bidders should anticipate milestone-based invoicing after supply, installation, testing, and commissioning. Ensure documentation aligns with the specified timeline and any required performance criteria in the ATC.
Scope includes supply of 1.5 ton AC units, stands, stabilizers, UPS 1 KVA online, installation charges, testing, commissioning, operator training, and any statutory clearances required by regulations for Army sites.
Yes, OEM authorizations are typically required if the offered products are not manufactured by the bidding firm. Provide official authorization letters and product-specific compliance documentation within the technical bid per ATC.
Key risks include ensuring ISO 9001 compliance, meeting installation and training obligations, confirming quantity variation capabilities, coordinating with Army installation sites, and securing timely delivery to fulfill the 30+ day minimum schedule under varying demand.