TenderDekho Logo
Active GEM

Action Construction Systems 22 KL Mild Steel Lube Oil Storage Tank Tender Palwal Haryana IS 2062 2026

Bid Publish Date

04-Sep-2026, 10:26 am

Bid End Date

16-Sep-2026, 11:00 am

Progress

Issue04-Sep-2026, 10:26 am
AwardPending

Key Highlights

  • Notable clause enabling up to 25% quantity variation at contract award and a further 25% increase during currency
  • Specific project scope: design, fabrication, supply, third-party inspection, loading/unloading, and installation of a 22 KL prefabricated mild steel lube oil storage tank
  • IS compliance focus: IS 2062 steel plates for shell/end plates; GA drawing adherence; IS standards referenced
  • Critical deliverables: Dip Rod provided free of cost; Dip Chart and Calibration Chart included; Oil Level Indicator visible from ground

Tender Overview

Action Construction Systems (ACS) invites bids for design, engineering, fabrication, supply, testing, transportation, unloading and installation of one 22 KL Prefabricated Mild Steel Lube Oil Storage Tank at ACS premises, Village Dudhola, District Palwal, Haryana. Scope follows GA drawing and applicable IS Standards, with steel plates and mains fittings supplied under vendor scope. The tender covers third-party inspection, loading/unloading, and on-site installation. The order contemplates a single tank with integrated inspection and calibration components; the supplier must provide a Dip Rod, Dip Chart, and Calibration Chart, with mounting and earthing provisions. The contract allows a quantity variation of up to 25% and potential 25% increase at contracted rates.

Technical Specifications & Requirements

  • Tank capacity: 22 KL prefab mild steel tank
  • Location: ACS Premises, Village Dudhola, District Palwal, Haryana
  • Standards & materials: shell/end plates using IS 2062 steel; supplier to provide tested steel and invoices with test certificates
  • Complete scope: design, fabrication, supply, third-party inspection, loading/unloading, installation
  • Fittings & accessories: suction pipe, fill pipe, vent pipe, dip rod (free of cost), earthing plates, automation ATG probe riser with cap, removable waterproof plug
  • Instrumentation: Oil Level Indicator visible from ground, Dip Chart and Calibration Chart
  • Delivery terms: aligned to GA drawing; delivery period subject to contract terms; option clause may extend delivery period as per calculation

Terms & Eligibility

  • EMD amount and exact deadline not disclosed; bidders should anticipate standard bid security as per procurement norms
  • Delivery-time flexibility: 25% quantity variation permissible during contract
  • Documentation: submission of GST, PAN, experience certificates, financial statements, OEM authorizations, and technical bid documents as per contract requirements
  • Warranty/Support: not explicitly stated; ensure alignment with IS standards and installation scope
  • Qualification: experience with prefabricated steel tanks and IS-compliant fabrication is expected

Key Specifications

  • Tank capacity: 22 KL

  • Material standard: IS 2062 steel

  • Fittings: suction pipe, fill pipe, dip rod, dip chart, calibration chart, vent pipe, earthing plates, ATG probe riser

  • Indicated documents: GA drawing adherence, third-party inspection

  • Location: ACS Premises, Palwal, Haryana; delivery and installation included

Terms & Conditions

  • Option Clause: quantity can increase up to 25% at contract rates

  • Delivery period may be adjusted based on quantity variation

  • EMD amount and payment terms not explicitly disclosed; bidders must follow standard norms

Important Clauses

Payment Terms

Not explicitly disclosed; bidders to align with standard procurement norms and contract terms

Delivery Schedule

Delivery period governed by GA drawing approval and option clause; extended delivery time may apply per quantity variation formula

Penalties/Liquidated Damages

Not specified in available data; procurement terms may include LDs per standard govt procurement guidelines

Bidder Eligibility

  • Experience in supplying and fabricating prefabricated steel storage tanks (preferably 22 KL scale)

  • Demonstrated capability for third-party inspection and on-site installation

  • Compliance with IS 2062 material specifications and related IS standards

Tender Data

Bid Details

Quantity

5

Bid Type

Service

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

ePBG Percentage

5%

ePBG Duration (Months)

15

Delivery Details

Delivery Locations

1

Delivery Cities

East

Delivery Pincodes

110092

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Suraj Rathore110092,LPG SBU, 8TH FLOOR, SCOPE MINAR LAXMI NAGAR, DELHI DELHI - 110092EastDelhi1100921--

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9846169.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Prefab 22KL SS tank

Refer tender document

1 each Delivery: 365 days
#2

Transportation

Refer tender document

1 each Delivery: 365 days
#3

TPI of tank

Refer tender document

1 man day Delivery: 365 days
#4

Unloading Charges

Refer tender document

1 lumpsum Delivery: 365 days
#5

Tank installation

Refer tender document

1 each Delivery: 365 days

Categories 5

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar prefabricated steel storage tank projects

4

Financial statements demonstrating financial capacity

5

EMD/Security deposit documents (as per standard norms)

6

Technical bid documents and compliance certificates

7

OEM authorizations or licenses (if applicable)

Frequently Asked Questions

Key insights about DELHI tender market

How to bid for the lube oil storage tank tender in Palwal Haryana 2026?

Bidders should prepare GST and PAN documents, experience certificates for 22 KL tanks, financial statements, EMD submission, OEM authorizations if required, and technical bid with GA drawing conformity to IS 2062. Ensure third-party inspection arrangements and installation plan are demonstrated.

What documents are required for the 22 KL tank procurement in Haryana?

Submit GST certificate, PAN, experience certificates in prefabricated steel tanks, financial statements, EMD/security deposit, technical bid, GA drawing conformity, and OEM authorization letters if applicable to confirm manufacturing capability.

What are the key technical standards for the 22 KL tank in this bid?

Tank shell/end plates must use IS 2062 steel; fabrication must align with approved GA drawing and IS standards; include third-party inspection and calibration tools like Dip Chart and Calibration Chart.

What is the scope of work for ACS’s 22 KL lube oil tank tender?

Scope includes design, engineering, fabrication, supply, steel testing, transportation, third-party inspection, loading/unloading, and on-site installation at ACS premises in Palwal, Haryana, with all standard fittings and monitoring instruments.

What is the quantity variation clause in this tender in Haryana?

The purchaser reserves the right to increase or decrease the quantity up to 25% at the contracted rates; during currency, up to an additional 25% may be ordered, affecting delivery timelines as per the formula.

When will third-party inspection occur for the storage tank project?

Third-party inspection is included in the scope; bidders should arrange for inspection during fabrication and prior to loading/unloading, ensuring compliance with GA drawings and IS standards.