Progress
Bharat Earth Movers Limited (BEML), under the Department of Defence Production, invites bids for the FRONT BUMPER ASSEMBLY. The scope is defined by optional quantity adjustments up to 50%, with delivery timelines linked to the original delivery period. Bidder must upload the product Data Sheet and ensure GST compliance per applicable rates. The sale involves FIM on FOR basis and post-acceptance inspections by BEML QUALITY. The contracting terms include ISO 9001 certification for the bidder or OEM and pre-dispatch/post-receipt inspection by designated agencies. This procurement aims to secure a compliant bumper assembly with strict parameter verification against Data Sheets.
Product/service name: FRONT BUMPER ASSEMBLY
Standards: ISO 9001 certified (bidder or OEM)
Inspection: Pre-dispatch (BEML SIT); Post-receipt (BEML QUALITY)
Delivery: Original delivery period; option to extend; minimum 30 days extension
Quantity: Up to 50% increase during contract
Payment: MSME 45 days; Non-MSME 60 days after acceptance
FIM: Free issue materials on FOR basis
Data Sheet: Mandatory upload; match with offered product
Delivery quantity adjustment up to 50% during contract
ISO 9001 certification required for bidder or OEM
Post-acceptance payment terms: 45/60 days depending on MSME status
MSME vendors: payment within 45 days after receipt & acceptance; Non-MSME vendors: 60 days
Delivery starts from last date of original delivery order; extended delivery period follows option clause with minimum 30 days
Not explicitly provided in data; subject to ATC and contractual terms
ISO 9001 certification (bidder or OEM)
Data Sheet uploaded and consistent with bid specs
GST compliance and appropriate tax handling by bidder
Quantity
25
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
Yes
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
130079910124 - FRONT BUMPER ASSY
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
PALAKKAD
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | PALAKKAD | PALAKKAD | - | - | 25 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
12-Sep-2026, 11:30 am
Opening Date
13-Sep-2026, 11:30 am
Discover companies most likely to bid on this tender
Duly filled and signed Technical Bid (Buyer specification) & Tender RFQ
Data Sheet of the product offered
GST Registration Certificate
PAN Card
Experience certificates (if applicable)
Financial statements (as required)
OEM authorization (if applicable)
Pre-dispatch & Post-receipt inspection documentation
Key insights about KERALA tender market
Bidders must submit a Duly filled Technical Bid and the Data Sheet, along with GST PAN and OEM authorization if applicable. ISO 9001 certification is mandatory for bidder or OEM. Delivery terms follow the original period with possible 50% quantity increases, and inspection is conducted by BEML SIT and QUALITY.
Required documents include Data Sheet, Technical Bid, GST certificate, PAN, experience certificates, financial statements, and OEM authorization if applicable. Ensure the Data Sheet exactly matches the offered FRONT BUMPER ASSEMBLY specifications; submit for pre-dispatch and post-receipt inspections as applicable.
MSME suppliers receive payment within 45 days after receipt and acceptance; non-MSME vendors are paid within 60 days after receipt and acceptance. All payments hinge on successful inspection and conformity to Data Sheet requirements per ATC terms.
Pre-dispatch inspection will be conducted at BEML SIT for selected clauses, and post-receipt inspection occurs at the consignee site by BEML QUALITY prior to acceptance. Ensure the supplier’s processes align with these QA checks to avoid rejection.
Suppliers must hold ISO 9001 certification (either the bidder or OEM). The Data Sheet must be uploaded and reconciled with product specifications, and the supplier must comply with GST requirements and applicable tax rules during quotation.
The purchaser may increase or decrease quantity up to 50% of bid/contract quantity at placement, with the extended period calculated by (increased quantity/original quantity) × original delivery period, minimum of 30 days. Ensure readiness to adjust production capacity accordingly.
BEML will supply free issue materials (FIM) on FOR basis to the vendor. The supplier must integrate FIM with their manufacturing flow, and align delivery schedules to coordinate with FIM release and inspection milestones.
For drawings and QAP clarifications contact the designated email ([email protected]) or call the provided number (0491-2565167) with the bid reference to ensure alignment with technical requirements and data sheets.