Progress
Cochin Shipyard Ltd seeks the supply of safety shoes for a two-year period, with delivery to the ERNAKULAM, KERALA facility. The tender specifies a bid approach that allows a quantity variation up to 25%, at contracted rates, starting from the order’s original delivery date. An estimated value is not disclosed; the scope is limited to the procurement and delivery of safety footwear, with GST considerations managed by bidders. The vendor must adhere to the option clause, ensure timely delivery, and comply with all GeM-related invoicing and GST procedures. A distinctive feature is the requirement to upload a Data Sheet that matches product specifications and the need for an Integrity Pact. Unique terms around GST handling and vendor code creation are also highlighted.
Scope: Safety shoes supply to Cochin Shipyard Ltd, Ernakulam, Kerala
EMD: ₹100,000
Option Clause: 25% quantity variation at contracted rates
Delivery timeline adjustment: proportional, min 30 days
Data Sheet: mandatory upload and parameter match
GST handling: bidder to determine GST; invoicing via GeM with GST portal confirmation
Vendor code creation and Integrity Pact compliance
EMD of ₹100,000 required as bid security
Quantity may vary by up to 25% during contract
Mandatory Data Sheet and Integrity Pact submission
GST invoice must be uploaded with GST portal screenshot; payment terms follow GeM norms and actual GST rates
Delivery period begins from the last date of original delivery order; extended period proportionate to quantity variation, min 30 days
Not explicitly detailed in data; subject to contract terms and option clause adherence
Eligibility to submit PAN and GSTIN copies
Compliance with vendor code creation and EFT mandate
Upload of Data Sheet and signed Integrity Pact
Quantity
13000
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Safety shoes for a period of two years
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
33
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Ernakulam
Delivery Pincodes
682015
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Austin Bhasi | 682015,Cochin Shipyard Limited, Perumanoor, Kochi- 682304 | Ernakulam | Kerala | 682015 | 13000 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Data Sheet of the product(s) offered
Signed Integrity Pact as per Buyer policy
GST invoice and GST portal screenshot for invoicing
Data Sheet match verification against offered parameters
Key insights about KERALA tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, Data Sheet, and signed Integrity Pact. The EMD is ₹100,000. Ensure data sheet matches product specs and GST handling aligns with actuals or applicable rates; delivery follows the original delivery order date with a 25% quantity variation allowance.
Prepare PAN, GSTIN, cancelled cheque, and an EFT mandate certified by the bank. Upload these during bid submission along with Data Sheet and Integrity Pact. Ensure GST invoice details are ready for GeM portal invoicing and GST portal screenshots.
Quantity may increase up to 25% at contracted rates. Delivery time extends proportionally from the last date of the original delivery order, minimum 30 days; the supplier must plan for potential extended periods if the option clause is exercised.
Bidder determines applicable GST; reimbursement is per actuals or the lower of actuals and quoted GST. A GST invoice and a GST portal screenshot must be uploaded when generating the GeM invoice.
Mandatory uploads include the Data Sheet, signed Integrity Pact, PAN, GSTIN, cancelled cheque, and EFT mandate. These ensure product parameter verification and vendor registration compliance before bid evaluation.
Delivery begins from the last date of the original delivery order. If the option clause is invoked, the extension is calculated as (Increased quantity / Original quantity) × Original delivery period, with a minimum 30 days.