Bid Publish Date
17-Oct-2026, 12:47 pm
Bid End Date
27-Oct-2026, 1:00 pm
Location
Progress
Organization: E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh. Product: High Mast Lighting Tower for large area with LED Flood Lighting System. Location: Kanpur Dehat, Uttar Pradesh 209101. Estimated Value: Not disclosed; Delivery terms: Not specified; Quantity: Up to 25% variation allowed under option clause. This procurement emphasizes LED high mast towers with GI poles, ISO 9001 compliance, and associated installation capabilities. The tender requires strict certification uploads and ON/OEM authorization where applicable, ensuring standard-compliant lighting installations across urban infrastructure projects.
LED High Mast Lighting Tower with GI Pole
ISO 9001 certified bidder or OEM
IS/BIS licences and Type Test Certificates required
Material Test Certificate to accompany supply
LED luminaire and GI pole datasheets to be submitted
OEM authorization if the seller is not the OEM
Option clause allows up to 25% quantity variation
Delivery period aligned with original order and possible extensions
Mandatory certifications: ISO 9001, BIS/type tests, MTC
Documentation: extensive submission including OEM auth and datasheets
Material Test Certificate governs acceptance through buyer lab
Warranty declaration required for LED lights
Not specified in data; ensure terms per bid document and supplier clarity
Delivery period to commence from last date of original delivery order; extension rules apply with minimum 30 days
Not specified; expected to be governed by standard government procurement policies and contract terms
ISO 9001 certification for bidder or OEM
BIS licence and type test certificates present
Experience with similar LED lighting installation projects (work orders/completion certificates)
Quantity
5
Bid Type
Two Packet Bid
Bid Validity
80 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1156
OEM Avg. Turnover
50
Past Performance
40 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Nagar Panchayat Sikandra
Delivery Pincodes
209715
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Manoj Kumar | 209715,Nagar Panchayat Sikandra | Nagar Panchayat Sikandra | - | 209715 | 5 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
27-Oct-2026, 7:30 am
Opening Date
28-Oct-2026, 7:30 am
Discover companies most likely to bid on this tender
Technical Compliance Statement for LED Lights and GI Poles
Technical Datasheet/Catalogue for LED Light
Technical Datasheet/Specification of GI Pole
OEM/Manufacturer Authorization Certificate (if not OEM)
Work Orders/Purchase Orders and Completion Certificates
Warranty/Guarantee Declaration for LED Lights
Details of Technical/Skilled Manpower for installation
GST Registration Certificate and PAN Card
Seller’s Bank Account Details/Cancelled Cheque
Self Declaration confirming material conformity
Key insights about UTTAR PRADESH tender market
Bidders must submit Technical Compliance Statement, LED and GI pole datasheets, OEM authorization if not the OEM, work orders with completion certificates, warranty declarations, GST and PAN, and bank details. Ensure ISO 9001 and BIS/type test certificates are uploaded before bid opening. Follow option clause for quantity variation up to 25%.
Required documents include Technical Datasheets, OEM authorization, GST certificate, PAN, bank details, work orders, completion certificates for similar installs, Material Test Certificate, warranty declaration, and manpower details. ISO 9001 and BIS/type tests must be provided as part of compliance.
Bidders must meet ISO 9001 certification for quality management, BIS licences, and type test certificates for LED luminaires and GI poles. Material Test Certificate is mandatory for acceptance, with buyer lab determining final conformance and performance.
The purchaser may increase or decrease the quantity by up to 25% at contract placement and during the currency. Additional delivery time equals (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.
A warranty/guarantee declaration for the LED lights is mandatory. Suppliers must provide evidence of warranty coverage and terms for replacement or repair, aligned with the contract requirements and quality standards.
Bidders must provide details of technical/skilled manpower for installation, along with completed work orders and installation completion certificates. This demonstrates capability to install LED high mast towers and GI poles per the specified product standards.
Submission requires all listed technical, OEM, and compliance documents. Although exact dates are not provided here, ensure all documents are uploaded with the bid, including MTC and ISO/BIS certificates, to avoid rejection at bid opening.
Material Test Certificate accompanies each supply and is the sole criterion for acceptance by the buyer’s laboratory. Ensure the MTC aligns with LED luminaires and GI pole materials and is submitted with the bid to meet quality acceptance tests.