UPRVUNL Lucknow Tender for Complete Coupling, PRV DBDS 20, Manifold with PRV, OSU Pressure Relief Valve, Suction Filter & Non-Return Valve Aligarh 2026

Bid Publish Date

17-Oct-2026, 5:11 pm

Bid End Date

27-Oct-2026, 6:00 pm

Value

₹7,82,451

Progress

Issue17-Oct-2026, 5:11 pm
AwardPending

Tender Overview

Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow. Location: Aligarh, Uttar Pradesh (202001). Procurement scope: Complete coupling, pressure reducing valve DBDS 20, manifold with pressure reducing valve, pressure relief valve for HPBP OSU OV 32B, suction filter, and non-return valve for OSU. Estimated value: ₹782,451. Key differentiators: broad valve assembly set for HPBP/OSU systems, with a vendor who can supply a coordinated suite of hydraulic components under one contract. Unique aspects: 6 BOQ items listed, but no technical specs provided in the data; ATC indicates bid-specific terms are included. Tender context: Buyer mandates option-based quantity adjustments and flexible delivery timing aligned to order, with extension rules.

Technical Specifications & Requirements

  • No explicit technical specifications are provided in the tender data.
  • Known items include: Complete coupling, Pressure reducing valve DBDS 20, Manifold with pressure reducing valve, Pressure relief valve for HPBP OSU OV 32B, Suction filter, Non-return valve for OSU.
  • Estimated value: ₹782,451.
  • Option clause: Purchaser may increase/decrease quantity up to 25% of bid/contracted quantity; extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • ATC reference: Buyer-added terms govern the contract and delivery framework.

Terms, Conditions & Eligibility

  • EMD: Not specified in data.
  • Quantity variation: Up to 25% at placement and during currency at contracted rates.
  • Delivery timeline: Commences from last date of original delivery order; extended time calculations apply with minimum 30 days.
  • Payment terms: Not detailed in data; ATC may contain specifics.
  • BOQ status: 6 items, but no quantities or unit details provided.
  • Document requirements: Not fully listed; refer to ATC for bidder submission specifics.
  • Warranties/Penalties: Not specified in the provided data.

Key Specifications

  • Product/service names from BOQ items: Complete coupling, PRV DBDS 20, manifold with PRV, pressure relief valve for HPBP OSU OV 32B, suction filter, non-return valve

  • Estimated value: ₹782,451

  • Delivery flexibility: 25% quantity variation during contract

  • Delivery timeline: from last date of original delivery order with minimum 30 days extension

  • BOQ items: 6 entries (quantities and units not specified in data)

Terms & Conditions

  • Quantity can be increased/decreased by up to 25% at contract award and during the contract

  • Delivery period starts after the original delivery order and may extend with a minimum 30 days

  • Exact EMD amount and payment terms are not detailed in the provided data

Important Clauses

Delivery Schedule

Delivery timing begins from the last date of the original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days

EMD & Bid Security

EMD amount not specified in the data; bidders should refer to ATC for exact EMD and submission format

Payment Terms

Not specified in the provided data; ATC document may contain percentage and schedule

Bidder Eligibility

  • Experience in supplying hydraulic components such as valves, couplings, and suction filters for power/OSU systems

  • Financial capacity evidenced by prior years' statements matching tender scale

  • Compliance with organization-specific ATC terms and delivery performance requirements

Advertisement

Tender Data

Bid Details

Quantity

13

Category

Complete Coupling

Bid Type

Single Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Complete Coupling , PRESSURE REDUCING VALVE DBDS 20 , MANIFOLD WITH PRESSURE REDUCING VALVE , Pressure Relief Valve FOR HPBP OSU OV 32B , SUCTION FILTER , Non- Return Valve-OSU

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Aligarh

Delivery Pincodes

202125

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Summit Chaurasia202125,Harduaganj Thermal Power PlantAligarhUttar Pradesh202125260-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10028046.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow

Office Name

Lucknow

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Complete Coupling

Complete Coupling

2 ea Delivery: 60 days
#2

PRESSURE REDUCING VALVE DBDS 20

PRESSURE REDUCING VALVE DBDS 20

2 ea Delivery: 60 days
#3

MANIFOLD WITH PRESSURE REDUCING VALVE

MANIFOLD WITH PRESSURE REDUCING VALVE

1 set Delivery: 60 days
#4

Pressure Relief Valve FOR HPBP OSU OV 32B

Pressure Relief Valve FOR HPBP OSU OV 32B

2 ea Delivery: 60 days
#5

SUCTION FILTER

SUCTION FILTER

2 ea Delivery: 60 days
#6

Non-Return Valve-OSU

Non-Return Valve-OSU

4 ea Delivery: 60 days
Advertisement

Categories 35

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar valve supply projects

4

Financial statements (last 2-3 years)

5

EMD/Security deposit documentation (as applicable per ATC)

6

Technical bid documents and compliance statements

7

OEM authorizations or agency letters (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What documents are required for the valve tender in Aligarh 2026?

Bidders must submit GST registration, PAN, experience certificates for valve supply, financial statements, EMD proof, technical bid documents, and OEM authorizations where applicable. ATC may specify additional documents; ensure compliance with all tender terms and submit in the prescribed format.

How is quantity variation handled in the Aligarh valve tender?

The purchaser can increase or decrease the bid quantity by up to 25% at contract placement and during the currency. Extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What are the delivery timeline rules for the UP government valve contract?

Delivery begins after the last date of the original delivery order. If the option clause is exercised, the additional time is determined by the 30-day minimum rule and proportional extension formula, ensuring timely supply of six listed items.

What items are covered under the Aligarh UP valve procurement tender?

The scope includes Complete coupling, PRV DBDS 20, manifold with PRV, HPBP OSU OV 32B pressure relief valve, suction filter, and non-return valve for OSU, intended for HPBP OSU systems and associated piping.

What is the estimated value and EMD for the Aligarh tender 2026?

Estimated value is ₹782,451. The EMD amount is not specified in the data; bidders should consult the ATC for the exact EMD requirement and payment method.

How to participate in the Uttar Pradesh energy department procurement for valves?

Register as a bidder, gather GST/PAN, obtain OEM authorizations if required, prepare technical and financial bids per ATC, and submit with all demanded documents. Ensure compliance with the 25% quantity variation clause and delivery extension rules described in the Terms.

Which standards or certifications are required for valve supply in UP tender?

Specific standards are not listed in the data; bidders should verify ATC for any certification requirements such as ISI, ISO, or supplier quality standards and ensure product conformity for the valve assemblies listed.

When is the delivery deadline for the Aligarh UP valve tender 2026?

The standard delivery timeline depends on the original delivery order; extensions apply per the 25% quantity clause with a minimum 30 days extension. Exact delivery dates are defined in the purchase order and ATC.

Advertisement