Progress
Stockholding Document Management Services Ltd invites bids for the supply, delivery & installation of Container Based Habitable Spaces at Patna 3, Patna, Bihar. Although the exact quantity, scope, and estimated value are not disclosed, the tender includes an option clause allowing ±25% quantity variation and extended delivery timelines. This procurement requires bidders to align with the department’s delivery framework and contract terms. The BOQ shows 0 items, indicating a flexible or phased deployment approach. The ATC terms govern delivery pacing and volume adjustments during contract execution, emphasizing compliance with purchaser directives and schedule adherence.
Product/Service: Supply, delivery & installation of Container Based Habitable Spaces
Quantity: Not disclosed (BOQ shows 0 items; quantity variation allowed up to 25%)
Standards/Certification: Not specified in tender data; expect compliance with government procurement norms
Delivery: From last date of original delivery order; extended period calculation requires formula (additional/original) × original delivery period, minimum 30 days
Quality/Testing: Not specified; bidders should propose acceptance testing aligned with installation readiness
Warranty/Support: Not specified; propose standard post-installation support terms in bid
Site/Installation: On-site installation at Patna 3, Patna, Bihar; coordination with Department of Financial Services
Quantity variation up to 25% during contract and currency of contract
Delivery period starts from last date of original delivery order
Minimum extension time of 30 days if extended delivery is exercised
Delivery period calculated as (additional quantity ÷ original quantity) × original delivery period; minimum 30 days; extension may be allowed to match original delivery period
Purchaser may increase or decrease quantity up to 25% at contract placement and during currency at contracted rates
Bidders must comply with Buyer Added Terms; including delivery sequencing and performance expectations
Not explicitly disclosed in tender data; bidders should satisfy standard government procurement eligibility and demonstrate capability for container-based space deployment
Proven experience in supply, delivery, and on-site installation of modular or containerized spaces
Financial stability with adequate turnover and access to performance bonds or security as per standard practice
Quantity
6
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
12
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supply, delivery & installation of Container Based Habitable Spaces at Patna 3
Advisory Bank
IDBI Bank
ePBG Percentage
5%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Patna
Delivery Pincodes
803201
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ritesh Rai | 803201,Stock Holding DMS LTD., W/H - Shree Hari Infra, Plot No. 19,11,12, Village Mauhadipur, Mauza Kansari, Dist. Patna, Bihar 803201 | Patna | Bihar | 803201 | 6 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates (relevant to container-based habitable space deployments)
Financial statements (last 3 years or latest annual report)
EMD/Security deposit submission proof (amount not disclosed in data)
Technical bid document outlining proposed solution (container spaces) and installation plan
OEM authorization or manufacturers' credentials (if applicable)
Any existing compliance certificates for similar government projects
Key insights about BIHAR tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD, and technical bid documents. The ATC allows a ±25% quantity variation; delivery starts from the last date of the original order with a minimum 30-day extension. Prepare installation plans and OEM authorizations if applicable.
Required documents include GST registration, PAN, experience certificates in container space deployments, financial statements, EMD proof, technical bid outlining proposed solution and installation plan, OEM authorizations if needed, and any prior government project experience.
Delivery begins from the last date of the original delivery order. If quantities are increased, extension time is calculated as (additional/original) × original delivery period, with a minimum of 30 days; the purchaser may extend to cover the original delivery period.
The purchaser reserves the right to adjust quantity by up to 25% of bid quantity at contract placement and during the contract currency at the same contracted rates, impacting delivery planning and site readiness.
While technical specs are not provided, bidders should plan for on-site installation and commissioning at Patna 3, Patna, Bihar, coordinating with the Department of Financial Services and ensuring timely site readiness and safety compliance.
The tender data does not specify warranty terms; bidders should propose standard post-installation support and warranty terms in their technical bid, ensuring alignment with government procurement norms and potential service-level commitments.
ATC terms require compliance with the option clause and delivery sequencing; bidders must acknowledge and implement these terms, including quantity adjustments and delivery timelines, as part of the bid and contract performance plan.