Bid Publish Date
09-Sep-2026, 10:12 am
Bid End Date
05-Oct-2026, 1:00 pm
EMD
₹3,30,000
Value
₹1,65,42,537
Location
Progress
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow invites bids for Round the clock routine and preventive maintenance of HVWS, MVWS WATER MIST IG Emulsifier and Hydran in SONBHADRA, UTTAR PRADESH. Quantity: 16820. Submission Deadline: 05-10-2026 13: 00: 00. Submit your proposal before the deadline.
Quantity
16820
Category
Round the clock routine and preventive maintenance of HVWS,MVWS WATER MIST IG Emulsifier and Hydrant System
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
5 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Advisory Bank
State Bank of India
Max Delivery Days
730
Delivery Locations
1
Delivery Cities
Sonbhadra
Delivery Pincodes
231219
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jeetendra Kumar Gupta | 231219,Obra Thermal Power Plant | Sonbhadra | Uttar Pradesh | 231219 | 24 | 730 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Round the clock routine and preventive maintenance of HVWS,MVWS WATER MIST IG Emulsifier and Hydrant System
Round the clock routine and preventive maintenance of HVWS,MVWS WATER MIST IG Emulsifier and Hydrant System
Dusting and Cleaning work of Water mist pump house and all DV houses
Dusting and Cleaning work of Water mist pump house and all DV houses
Replacement of different types of valves of 80,100,150 mm size Gate Valve or NRV
Replacement of different types of valves of fire Hydrant, Spray,Emulsifier system 80,100,150 mm size Gate Valve or NRV
Replacement of different types of valves 200,250,300 mm size Gate Valve or NRV
Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system 200,250,300 mm size Gate Valve or NRV
Replacement of different types of valves Solenoid section valve and Ball Valve
Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system Solenoid section valve and Ball Valve
Replacement of different types of valves of Pressure Switches along with Isolation Valve
Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system.Pressure Switches along with Isolation Valve
Replacement of different types of valves 80,100,150 NB size Butterfly Valve
Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system.80,100,150 NB size Butterfly Valve
Replacement of different types of valves of 80,100,150 NB size Deluge Valve or Alarm Valve
Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system.80,100,150 NB size Deluge Valve or Alarm Valve
Replacement of 350, 300 NB size of CI,MS pipe by cutting and welding
Replacement of 350, 300 NB size of CI,MS pipe by cutting and welding
Replacement of 250, 200 NB size of CI,MS,GI pipe by cutting and welding
Replacement of 250, 200 NB size of CI,MS,GI pipe by cutting and welding
Replacement of 150,100,80,75,65,50,40,32,25,20,12.5 NB size of CI, MS, GI, SS pipe by cutting and welding
Replacement of 150,100,80,75,65,50,40,32,25,20,12.5 NB size of CI, MS, GI, SS pipe by cutting and welding
Maintenance Servicing and overhauling of gate valve of Size 80 to 350 mm Dia.
Maintenance Servicing and overhauling of low presuure gate valve of Size 80 to 350 mm Dia. C.I. Isolating gate valves
Maintenance of 300 mm C.I. swing type Non Return Valve
Maintenance of 300 mm C.I. swing type Non Return Valve
Overhauling, cleaning repairing replacement of damaged parts etc. of 80,100,150 mm Y type Strainer
Overhauling, cleaning repairing replacement of damaged parts etc. of 80,100,150 mm Y type Strainer
Filling of gland packing in stuffing box of CI gate valves 350 to 250 mm
Filling of gland packing in stuffing box of CI gate valves 350 to 250 mm
Filling of gland packing in stuffing box of CI gate valves 200 to 80 mm
Filling of gland packing in stuffing box of CI gate valves 200 to 80 mm
Maintenance, overhauling of 150 ,100,80 mm Deluge valve
Maintenance, overhauling of 150 ,100,80 mm Deluge valve
Maintenance,servicing of 150,100,80 mm butterfly valve
Maintenance,servicing of 150,100,80 mm butterfly valve
Maintenance,Serviceing of 100,80 mm Inline Balance Pressure Foam Proportioner
Maintenance,Serviceing of 100,80 mm Inline Balance Pressure Foam Proportioner
Maintenance, Serviceing of Foam Deflector
Maintenance, Serviceing of Foam Deflector
Dismentaling of RCC,CC,metallic road , at approx. 1.5 meter
Dismentaling of RCC,CC,metallic road , at approx. 1.5 meter depth and filling back up to the same level
Leakage arresting of Fire Spray system pipeline GI 150,100,80,65,50,40,25 mm
Leakage arresting of Fire Spray system pipeline GI 150,100,80,65,50,40,25 mm
Leakage arresting work in main header MS Spray lines, hydrant lines laid at ground level
Leakage arresting work in main header MS Spray lines, hydrant lines laid at ground level 350,300,250,200,150,100,80 mm
INERT GAS System Annual Maintenance Contract , AMC by OEM Ms. Safex
INERT GAS System Annual Maintenance Contract , AMC by OEM Ms. Safex of inert gas flooding system
Annual maintenance contract, AMC of complete water mist system by OEM Ms Fogtec Fire Protection
Annual maintenance contract, AMC of complete water mist system by OEM Ms Fogtec Fire Protection
Overhauling of fire pump of fire tender
Overhauling of fire pump of fire tender
Overhauling of p.t.o.
Overhauling of p.t.o.
Overhauling of the pump of portable diesel fire pumps.
Overhauling of the pump of portable diesel fire pumps.
Overhauling of engine of portable diesel fire pump
Overhauling of engine of portable diesel fire pump
Overhauling of the pump of portable petrol fire pump
Overhauling of the pump of portable petrol fire pump
Overhauling of engine of portable petrol fire pump
Overhauling of engine of portable petrol fire pump
Repairing of cylinder head assembly of Cummins Diesel engine.
Repairing of cylinder head assembly of Cummins Diesel engine.
Overhauling of housing fly wheel assembly of Cummins Diesel engine.
Overhauling of housing fly wheel assembly of Cummins Diesel engine.
Overhauling of radiator.
Overhauling of radiator.
Overhauling of cooling water pump.
Overhauling of cooling water pump.
Repairing of connecting rod of Cummins Diesel engine , 1 set consists 6 nos.
Repairing of connecting rod of Cummins Diesel engine , 1 set consists 6 nos.
Repairing of Injector assembly.
Repairing of Injector assembly.
Repairing of PT. fuel pump of Cummins Diesel engine.
Repairing of PT. fuel pump of Cummins Diesel engine.
Overhauling and repairing of self starter.
Overhauling and repairing of self starter.
Overhauling of alternator,dynamo.
Overhauling of alternator,dynamo.
Repairing of battery charger.
Repairing of battery charger.
Servicing of Cummins diesel engine.
Servicing of Cummins diesel engine.
Overhauling and repairing of armature.
Overhauling and repairing of armature.
Repairing of Battery 12V 25 Plates.
Repairing of Battery 12V 25 Plates.
loading, Unloading transportation of MS,GI pipes Gate valves Flanges Hydrant valves etc.
loading, Unloading transportation of MS,GI pipes Gate valves Flanges Hydrant valves and Consumables and others spares from CSD.
Setting of different spares,consumables etc. in proper place.
Setting of different spares,consumables etc. in proper place according to size and quantity.
Preservation of different spares of MS,GI pipes Gate valves Flanges Hydrant valves and others spares
Preservation of different spares of MS,GI pipes Gate valves Flanges Hydrant valves and others spares
Earth work by excavation of ordinary, mixed soil,mixed with bujari boulders etc.
Earth work by excavation of ordinary, mixed soil,mixed with bujari boulders etc.
Fixing of MS, GI bend tee, reducer 80,100,150,200mm dia.
Fixing of MS, GI bend tee, reducer 80,100,150,200mm dia.
Fixing of MS, GI bend tee, reducer 250,300,350mm dia.
Fixing of MS, GI bend tee, reducer 250,300,350mm dia.
Making of MS, GI bend tee, reducer 80,100,150,200mm dia.
Making of MS, GI bend tee, reducer 80,100,150,200mm dia.
Making of MS, GI bend tee, reducer 250,300,350mm dia.
Making of MS, GI bend tee, reducer 250,300,350mm dia.
Cleaning of valve chamber and manhole of fire hydrant line.
Cleaning of valve chamber and manhole of fire hydrant line valve after cleaning the cover to be closed properly.
Repairing, overhauling work of foam monitors of fire hydrant line
Repairing, overhauling work of foam monitors of fire hydrant line in fuel oil area A and BTPS.
Fabrication and fixing work of 80,100, 150 mm size clamps.
Fabrication and fixing work of 80,100, 150 mm size clamps in fire hydrant line.
Proper cleaning of 15000 gallons capacity static water tank.
Proper cleaning of 15000 gallons capacity static water tank situated at different location.
Fabrication of hydrant valve post of MS,GI pipe dia. 80mm one Mtrs.
Fabrication of hydrant valve post of MS,GI pipe dia. 80mm one Mtrs. Long and welding with MS Flange 80mm dia.
Fixing of hydrant post of 80mm pipe line of hydrant system.
Fixing of hydrant post of 80mm pipe line of hydrant system with the help of nut and bolts by welding works
Fixing of MS Flange by cutting welding and grinding etc. 80,100,150,200mm dia.
Fixing of MS Flange on the hydrant system, pipe line by cutting welding and grinding etc. 80,100,150,200mm dia.
Fixing of MS Flange by cutting welding and grinding etc. 250,300,350mm dia.
Fixing of MS Flange on the hydrant system, pipe line by cutting welding and grinding etc. 250,300,350mm dia.
Overhauling and servicing of mulsifire air compressor.
Overhauling and servicing of mulsifire air compressor.
Emulsifier painting of pipe line
Emulsifier painting of pipe line
Complete overhauling of filter water pump
Complete overhauling of filter water pump
Complete overhauling of fire pump ,Indian, Russian
Complete overhauling of fire pump ,Indian, Russian
Changing,checking of bearing ,coupling end, free end of pump.
Changing,checking of bearing ,coupling end, free end of pump.
Overhauling of float valve of pump of fire pump house.
Overhauling of float valve of pump of fire pump house.
Fabrication and replacement of strainer of float valve of fire pump house.
Fabrication and replacement of strainer of float valve of fire pump house.
Overhauling and servicing of valve and pipelines inside 2 no. suction pit.
Overhauling and servicing of valve and pipelines inside 2 no. suction pit , fire pump house, aux. pump house
Cleaning of suction pit of auxiliary pump house
Cleaning of suction pit of auxiliary pump house
Breakdown maintenance and overhauling of 6 NKS 10 and 2NKS 10 Sump pump
Breakdown maintenance and overhauling of 6 NKS 10 and 2NKS 10 Sump pump
Cleaning of suction filter of 6 NKS 10 and 2NKS 10 Sump pump
Cleaning of suction filter of 6 NKS 10 and 2NKS 10 Sump pump
Overhauling of A.C. firefighting pump
Overhauling of A.C. firefighting pump
Overhauling of diesel firefighting pump
Overhauling of diesel firefighting pump
Overhauling of electric fire pump
Overhauling of electric fire pump
Overhauling of Diesel fire pump
Overhauling of Diesel fire pump
Overhauling of H.P. pump
Overhauling of H.P. pump
Fabrication of Gun metal ring
Fabrication of Gun metal ring
Machining of Impeller hub
Machining of Impeller hub
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Round the clock routine and preventive maintenance of HVWS,MVWS WATER MIST IG Emulsifier and Hydrant System | Round the clock routine and preventive maintenance of HVWS,MVWS WATER MIST IG Emulsifier and Hydrant System | 24 | job | ee_ffsd_btps_obra | 730 | |
| 2 | Dusting and Cleaning work of Water mist pump house and all DV houses | Dusting and Cleaning work of Water mist pump house and all DV houses | 24 | job | ee_ffsd_btps_obra | 730 | |
| 3 | Replacement of different types of valves of 80,100,150 mm size Gate Valve or NRV | Replacement of different types of valves of fire Hydrant, Spray,Emulsifier system 80,100,150 mm size Gate Valve or NRV | 35 | nos | ee_ffsd_btps_obra | 730 | |
| 4 | Replacement of different types of valves 200,250,300 mm size Gate Valve or NRV | Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system 200,250,300 mm size Gate Valve or NRV | 22 | nos | ee_ffsd_btps_obra | 730 | |
| 5 | Replacement of different types of valves Solenoid section valve and Ball Valve | Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system Solenoid section valve and Ball Valve | 42 | nos | ee_ffsd_btps_obra | 730 | |
| 6 | Replacement of different types of valves of Pressure Switches along with Isolation Valve | Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system.Pressure Switches along with Isolation Valve | 19 | nos | ee_ffsd_btps_obra | 730 | |
| 7 | Replacement of different types of valves 80,100,150 NB size Butterfly Valve | Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system.80,100,150 NB size Butterfly Valve | 30 | nos | ee_ffsd_btps_obra | 730 | |
| 8 | Replacement of different types of valves of 80,100,150 NB size Deluge Valve or Alarm Valve | Replacement of different types of valves of fire Hydrant,Spray,Emulsifier system.80,100,150 NB size Deluge Valve or Alarm Valve | 14 | nos | ee_ffsd_btps_obra | 730 | |
| 9 | Replacement of 350, 300 NB size of CI,MS pipe by cutting and welding | Replacement of 350, 300 NB size of CI,MS pipe by cutting and welding | 50 | mtr | ee_ffsd_btps_obra | 730 | |
| 10 | Replacement of 250, 200 NB size of CI,MS,GI pipe by cutting and welding | Replacement of 250, 200 NB size of CI,MS,GI pipe by cutting and welding | 280 | mtr | ee_ffsd_btps_obra | 730 | |
| 11 | Replacement of 150,100,80,75,65,50,40,32,25,20,12.5 NB size of CI, MS, GI, SS pipe by cutting and welding | Replacement of 150,100,80,75,65,50,40,32,25,20,12.5 NB size of CI, MS, GI, SS pipe by cutting and welding | 800 | mtr | ee_ffsd_btps_obra | 730 | |
| 12 | Maintenance Servicing and overhauling of gate valve of Size 80 to 350 mm Dia. | Maintenance Servicing and overhauling of low presuure gate valve of Size 80 to 350 mm Dia. C.I. Isolating gate valves | 12,000 | mm | ee_ffsd_btps_obra | 730 | |
| 13 | Maintenance of 300 mm C.I. swing type Non Return Valve | Maintenance of 300 mm C.I. swing type Non Return Valve | 7 | nos | ee_ffsd_btps_obra | 730 | |
| 14 | Overhauling, cleaning repairing replacement of damaged parts etc. of 80,100,150 mm Y type Strainer | Overhauling, cleaning repairing replacement of damaged parts etc. of 80,100,150 mm Y type Strainer | 184 | nos | ee_ffsd_btps_obra | 730 | |
| 15 | Filling of gland packing in stuffing box of CI gate valves 350 to 250 mm | Filling of gland packing in stuffing box of CI gate valves 350 to 250 mm | 5 | nos | ee_ffsd_btps_obra | 730 | |
| 16 | Filling of gland packing in stuffing box of CI gate valves 200 to 80 mm | Filling of gland packing in stuffing box of CI gate valves 200 to 80 mm | 80 | nos | ee_ffsd_btps_obra | 730 | |
| 17 | Maintenance, overhauling of 150 ,100,80 mm Deluge valve | Maintenance, overhauling of 150 ,100,80 mm Deluge valve | 80 | nos | ee_ffsd_btps_obra | 730 | |
| 18 | Maintenance,servicing of 150,100,80 mm butterfly valve | Maintenance,servicing of 150,100,80 mm butterfly valve | 80 | nos | ee_ffsd_btps_obra | 730 | |
| 19 | Maintenance,Serviceing of 100,80 mm Inline Balance Pressure Foam Proportioner | Maintenance,Serviceing of 100,80 mm Inline Balance Pressure Foam Proportioner | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 20 | Maintenance, Serviceing of Foam Deflector | Maintenance, Serviceing of Foam Deflector | 36 | nos | ee_ffsd_btps_obra | 730 | |
| 21 | Dismentaling of RCC,CC,metallic road , at approx. 1.5 meter | Dismentaling of RCC,CC,metallic road , at approx. 1.5 meter depth and filling back up to the same level | 60 | m3 | ee_ffsd_btps_obra | 730 | |
| 22 | Leakage arresting of Fire Spray system pipeline GI 150,100,80,65,50,40,25 mm | Leakage arresting of Fire Spray system pipeline GI 150,100,80,65,50,40,25 mm | 60 | nos | ee_ffsd_btps_obra | 730 | |
| 23 | Leakage arresting work in main header MS Spray lines, hydrant lines laid at ground level | Leakage arresting work in main header MS Spray lines, hydrant lines laid at ground level 350,300,250,200,150,100,80 mm | 450 | nos | ee_ffsd_btps_obra | 730 | |
| 24 | INERT GAS System Annual Maintenance Contract , AMC by OEM Ms. Safex | INERT GAS System Annual Maintenance Contract , AMC by OEM Ms. Safex of inert gas flooding system | 2 | nos | ee_ffsd_btps_obra | 730 | |
| 25 | Annual maintenance contract, AMC of complete water mist system by OEM Ms Fogtec Fire Protection | Annual maintenance contract, AMC of complete water mist system by OEM Ms Fogtec Fire Protection | 1 | job | ee_ffsd_btps_obra | 730 | |
| 26 | Overhauling of fire pump of fire tender | Overhauling of fire pump of fire tender | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 27 | Overhauling of p.t.o. | Overhauling of p.t.o. | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 28 | Overhauling of the pump of portable diesel fire pumps. | Overhauling of the pump of portable diesel fire pumps. | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 29 | Overhauling of engine of portable diesel fire pump | Overhauling of engine of portable diesel fire pump | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 30 | Overhauling of the pump of portable petrol fire pump | Overhauling of the pump of portable petrol fire pump | 2 | no | ee_ffsd_btps_obra | 730 | |
| 31 | Overhauling of engine of portable petrol fire pump | Overhauling of engine of portable petrol fire pump | 2 | no | ee_ffsd_btps_obra | 730 | |
| 32 | Repairing of cylinder head assembly of Cummins Diesel engine. | Repairing of cylinder head assembly of Cummins Diesel engine. | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 33 | Overhauling of housing fly wheel assembly of Cummins Diesel engine. | Overhauling of housing fly wheel assembly of Cummins Diesel engine. | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 34 | Overhauling of radiator. | Overhauling of radiator. | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 35 | Overhauling of cooling water pump. | Overhauling of cooling water pump. | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 36 | Repairing of connecting rod of Cummins Diesel engine , 1 set consists 6 nos. | Repairing of connecting rod of Cummins Diesel engine , 1 set consists 6 nos. | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 37 | Repairing of Injector assembly. | Repairing of Injector assembly. | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 38 | Repairing of PT. fuel pump of Cummins Diesel engine. | Repairing of PT. fuel pump of Cummins Diesel engine. | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 39 | Overhauling and repairing of self starter. | Overhauling and repairing of self starter. | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 40 | Overhauling of alternator,dynamo. | Overhauling of alternator,dynamo. | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 41 | Repairing of battery charger. | Repairing of battery charger. | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 42 | Servicing of Cummins diesel engine. | Servicing of Cummins diesel engine. | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 43 | Overhauling and repairing of armature. | Overhauling and repairing of armature. | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 44 | Repairing of Battery 12V 25 Plates. | Repairing of Battery 12V 25 Plates. | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 45 | loading, Unloading transportation of MS,GI pipes Gate valves Flanges Hydrant valves etc. | loading, Unloading transportation of MS,GI pipes Gate valves Flanges Hydrant valves and Consumables and others spares from CSD. | 50 | mt | ee_ffsd_btps_obra | 730 | |
| 46 | Setting of different spares,consumables etc. in proper place. | Setting of different spares,consumables etc. in proper place according to size and quantity. | 50 | mt | ee_ffsd_btps_obra | 730 | |
| 47 | Preservation of different spares of MS,GI pipes Gate valves Flanges Hydrant valves and others spares | Preservation of different spares of MS,GI pipes Gate valves Flanges Hydrant valves and others spares | 1,100 | m2 | ee_ffsd_btps_obra | 730 | |
| 48 | Earth work by excavation of ordinary, mixed soil,mixed with bujari boulders etc. | Earth work by excavation of ordinary, mixed soil,mixed with bujari boulders etc. | 400 | m3 | ee_ffsd_btps_obra | 730 | |
| 49 | Fixing of MS, GI bend tee, reducer 80,100,150,200mm dia. | Fixing of MS, GI bend tee, reducer 80,100,150,200mm dia. | 50 | nos | ee_ffsd_btps_obra | 730 | |
| 50 | Fixing of MS, GI bend tee, reducer 250,300,350mm dia. | Fixing of MS, GI bend tee, reducer 250,300,350mm dia. | 20 | nos | ee_ffsd_btps_obra | 730 | |
| 51 | Making of MS, GI bend tee, reducer 80,100,150,200mm dia. | Making of MS, GI bend tee, reducer 80,100,150,200mm dia. | 60 | nos | ee_ffsd_btps_obra | 730 | |
| 52 | Making of MS, GI bend tee, reducer 250,300,350mm dia. | Making of MS, GI bend tee, reducer 250,300,350mm dia. | 20 | nos | ee_ffsd_btps_obra | 730 | |
| 53 | Cleaning of valve chamber and manhole of fire hydrant line. | Cleaning of valve chamber and manhole of fire hydrant line valve after cleaning the cover to be closed properly. | 20 | nos | ee_ffsd_btps_obra | 730 | |
| 54 | Repairing, overhauling work of foam monitors of fire hydrant line | Repairing, overhauling work of foam monitors of fire hydrant line in fuel oil area A and BTPS. | 30 | nos | ee_ffsd_btps_obra | 730 | |
| 55 | Fabrication and fixing work of 80,100, 150 mm size clamps. | Fabrication and fixing work of 80,100, 150 mm size clamps in fire hydrant line. | 172 | nos | ee_ffsd_btps_obra | 730 | |
| 56 | Proper cleaning of 15000 gallons capacity static water tank. | Proper cleaning of 15000 gallons capacity static water tank situated at different location. | 16 | nos | ee_ffsd_btps_obra | 730 | |
| 57 | Fabrication of hydrant valve post of MS,GI pipe dia. 80mm one Mtrs. | Fabrication of hydrant valve post of MS,GI pipe dia. 80mm one Mtrs. Long and welding with MS Flange 80mm dia. | 40 | nos | ee_ffsd_btps_obra | 730 | |
| 58 | Fixing of hydrant post of 80mm pipe line of hydrant system. | Fixing of hydrant post of 80mm pipe line of hydrant system with the help of nut and bolts by welding works | 40 | nos | ee_ffsd_btps_obra | 730 | |
| 59 | Fixing of MS Flange by cutting welding and grinding etc. 80,100,150,200mm dia. | Fixing of MS Flange on the hydrant system, pipe line by cutting welding and grinding etc. 80,100,150,200mm dia. | 80 | nos | ee_ffsd_btps_obra | 730 | |
| 60 | Fixing of MS Flange by cutting welding and grinding etc. 250,300,350mm dia. | Fixing of MS Flange on the hydrant system, pipe line by cutting welding and grinding etc. 250,300,350mm dia. | 32 | nos | ee_ffsd_btps_obra | 730 | |
| 61 | Overhauling and servicing of mulsifire air compressor. | Overhauling and servicing of mulsifire air compressor. | 8 | nos | ee_ffsd_btps_obra | 730 | |
| 62 | Emulsifier painting of pipe line | Emulsifier painting of pipe line | 16 | job | ee_ffsd_btps_obra | 730 | |
| 63 | Complete overhauling of filter water pump | Complete overhauling of filter water pump | 12 | job | ee_ffsd_btps_obra | 730 | |
| 64 | Complete overhauling of fire pump ,Indian, Russian | Complete overhauling of fire pump ,Indian, Russian | 10 | job | ee_ffsd_btps_obra | 730 | |
| 65 | Changing,checking of bearing ,coupling end, free end of pump. | Changing,checking of bearing ,coupling end, free end of pump. | 20 | job | ee_ffsd_btps_obra | 730 | |
| 66 | Overhauling of float valve of pump of fire pump house. | Overhauling of float valve of pump of fire pump house. | 10 | job | ee_ffsd_btps_obra | 730 | |
| 67 | Fabrication and replacement of strainer of float valve of fire pump house. | Fabrication and replacement of strainer of float valve of fire pump house. | 8 | job | ee_ffsd_btps_obra | 730 | |
| 68 | Overhauling and servicing of valve and pipelines inside 2 no. suction pit. | Overhauling and servicing of valve and pipelines inside 2 no. suction pit , fire pump house, aux. pump house | 4 | job | ee_ffsd_btps_obra | 730 | |
| 69 | Cleaning of suction pit of auxiliary pump house | Cleaning of suction pit of auxiliary pump house | 3 | job | ee_ffsd_btps_obra | 730 | |
| 70 | Breakdown maintenance and overhauling of 6 NKS 10 and 2NKS 10 Sump pump | Breakdown maintenance and overhauling of 6 NKS 10 and 2NKS 10 Sump pump | 8 | nos | ee_ffsd_btps_obra | 730 | |
| 71 | Cleaning of suction filter of 6 NKS 10 and 2NKS 10 Sump pump | Cleaning of suction filter of 6 NKS 10 and 2NKS 10 Sump pump | 16 | nos | ee_ffsd_btps_obra | 730 | |
| 72 | Overhauling of A.C. firefighting pump | Overhauling of A.C. firefighting pump | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 73 | Overhauling of diesel firefighting pump | Overhauling of diesel firefighting pump | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 74 | Overhauling of electric fire pump | Overhauling of electric fire pump | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 75 | Overhauling of Diesel fire pump | Overhauling of Diesel fire pump | 4 | nos | ee_ffsd_btps_obra | 730 | |
| 76 | Overhauling of H.P. pump | Overhauling of H.P. pump | 6 | nos | ee_ffsd_btps_obra | 730 | |
| 77 | Fabrication of Gun metal ring | Fabrication of Gun metal ring | 10 | nos | ee_ffsd_btps_obra | 730 | |
| 78 | Machining of Impeller hub | Machining of Impeller hub | 10 | nos | ee_ffsd_btps_obra | 730 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer