TenderDekho Logo
Active GEM

Indian Army Department Of Military Affairs Brake Disc Driven Plate Assembly Hydraulic Components Tender 2026

Bid Publish Date

24-Oct-2026, 7:37 pm

Bid End Date

03-Nov-2026, 8:00 pm

Location

CACHAR , ASSAM

Progress

Issue24-Oct-2026, 7:37 pm
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement of multiple spares and components including BRAKE DISC, DRIVEN PLATE ASSEMBLY (75 HP), HYDRAULIC FILTERS, PUMPS, STARTER MOTORS, LIGHTS, BEARINGS, SEALS, and associated hoses and fittings. The BOQ lists 33 items with diverse automotive and hydraulic parts, signifying a broad mid‑to‑high value scope. The estimated total value and exact quantities are not disclosed, but the range implies a substantial contract for field equipment and maintenance spares. The tender emphasizes conformity to approved drawings and option clauses for quantity variation up to 25% during contract performance. Unique clauses include detailed design drawing approvals post‑award and supply per buyer‑approved drawings.

Technical Specifications & Requirements

  • No explicit technical specs published in the data; items cover a broad mechanical and hydraulic spares portfolio for military vehicles/equipment.
  • The scope references 33 items including BRAKE DISC, DRIVEN PLATE ASSEMBLY 75 HP, HYDRAULIC PUMP 22 5 CC, IGNITION SWITCH, THERMOSTAT, BULBS, OIL SEALS, FUEL FILTERS, HYD HOSES, BEARINGS, and OEM style components.
  • Buyer terms require Detailed Design Drawings to be approved within 5 days of award; any modifications will be provided within 5 days, and delivery can be adjusted if drawing approvals are delayed. Generic GST and End User Certificate considerations are noted.
  • If offered items require OEM support, turnover criteria and annual average turnover are to be demonstrated, as per standard government procurement norms.

Terms, Conditions & Eligibility

  • Quantity adjustments allowed up to 25% during and after award, with proportional delivery time recalculation (minimum 30 days).
  • Bidders must submit Detailed Design Drawings for Buyer approval within 5 days; non‑compliant drawings trigger modification lists.
  • GST handling is bidder’s responsibility; reimbursement only as per actuals or applicable rate, subject to quoted GST.
  • End User Certificate provided in Buyer format; OEM turnover criteria apply for offered products; bidder turnover must meet minimum average annual turnover over last 3 years.
  • Documentation requirements, payment terms, and penalties/LD are governed by standard terms and conditions and must align with BOM and engineering approvals.

Key Specifications

    • Product names from BOQ items: BRAKE DISC, DRIVEN PLATE ASSEMBLY 75 HP, HYDRAULIC FILTER, HYDRAULIC PUMP 22 5 CC, STARTER MOTOR, LUBE OIL FILTER, OIL SEAL KIT, BULBS (12V 60/55W, 12V 5W), BEARING, THERMOSTAT, FOG/LIGHT BULBS, IGNITION SWITCH, PLOUGH BOLT, HARD BUSH LINER, CLUTCH WIRE, OIL SEAL REAR COVER
    • Delivery framework: Option to increase quantity up to 25% with adjusted delivery timelines; minimum 30 days for additional time
    • Design approvals: Detailed Design Drawings must be submitted within 5 days of award; buyer to respond with approvals or modification list within 5 days
    • GST & End User: Bidder bears GST impact; End User Certificate provided in buyer format
    • Turnover criteria: Minimum average annual turnover over the last 3 years as per bid document; OEM turnover criteria apply

Terms & Conditions

  • Key Term 1: Quantity may increase by up to 25% with corresponding schedule adjustments

  • Key Term 2: Detailed Design Drawings must be approved within 5 days of award

  • Key Term 3: GST and End User Certificate conditions apply; turnover requirements for bidders and OEMs

Important Clauses

Payment Terms

GST payable by bidder; reimbursement per actuals or applicable rate; payment terms aligned with standard government procurement schedules

Delivery Schedule

Delivery timelines adjust with option quantity; initial delivery period starts after approved drawings; proposed minimum extension logic with 30-day floor

Penalties/Liquidated Damages

LD terms apply per standard contract, tied to delivery delays and non-conformance to approved drawings

Bidder Eligibility

  • Minimum average annual turnover as specified in bid document for last 3 years

  • Demonstrated experience in supplying automotive/hydraulic spares to defense or government bodies

  • OEM authorization or manufacturer registration for offered items where applicable

Advertisement

Tender Data

Bid Details

Quantity

285

Category

BRAKE DISC 143847

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Warranty Period

5 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

BRAKE DISC 143847 , DRIVEN PLATE ASSEMBLY 75 HP , HYDRAULIC FILTER , HYDRAULIC PUMP 22 5 CC , DRIVEN PLATE ASSEMBLY PTO 75 HP , STARTER MOTOR , TERRACER BLADE , LUBE OIL FILTER , ELEMENT ASSEMBLY PRIMARY 8 , FLEXIBLE PIPE AXLE TO OUTSIDE , HYD HOSE FROM QRC TO MTG FRAME , ALTERNATOR ASSY , FLEXIBLE PIPE AXLE TO AXLE , OIL SEAL KIT 49101 , BULB HEAD LIGHT FRONT 12V 60 55W , HYD HOSE BUCKET CYL , HYD HOSE LOADER CYL , BEARING 104746 , PRIMARY FUEL FILTER , SENSOR 643172 , PLOUGH BOLT 3 4UN2B L 70MM , BEARING 27659 , HARD BUSH LINER 55X40X42 , BULB PARKING LIGHT FRONT 12V 5W , BRAKE COUNTER PLATE 117167 , IGNITION SWITCH 75 90 , THERMOSTAT ASSY , BULB BRAKE LIGHT REAR 12V 21W , HARD BUSH LINER 45X35X30 , MAIN OIL SEAL REAR COVER , PIN DIA 35X155X183 WITH GREASE NIPPLE , BULB FOG LIGHT , CLUTCH WIRE FLEXIBLE 75 HP

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

CACHAR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-CACHARCACHAR--2015-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10076216.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 33 Items Sign in for GEM prices

#1

BRAKE DISC 143847

W17/MPT/EE 499171120300 BRAKE DISC 143847

20 pieces Delivery: 15 days
#2

DRIVEN PLATE ASSEMBLY 75 HP

W17/MPT/EE 480021400800 DRIVEN PLATE ASSEMBLY 75 HP

2 pieces Delivery: 15 days
#3

HYDRAULIC FILTER

W17/MPT/EE 445148100200 HYDRAULIC FILTER

50 pieces Delivery: 15 days
#4

HYDRAULIC PUMP 22 5 CC

W17/MPT/EE 424619420600 HYDRAULIC PUMP 22 5 CC

2 pieces Delivery: 15 days
#5

DRIVEN PLATE ASSEMBLY PTO 75 HP

W17/MPT/EE 480021400900 DRIVEN PLATE ASSEMBLY PTO 75 HP

2 pieces Delivery: 15 days
#6

STARTER MOTOR

W17/MPT/EE 424619120000 STARTER MOTOR

1 pieces Delivery: 15 days
#7

TERRACER BLADE

W17/MPT/EE 996910682000 TERRACER BLADE

1 pieces Delivery: 15 days
#8

LUBE OIL FILTER

W17/MPT/EE 424617420100 LUBE OIL FILTER

30 pieces Delivery: 15 days
#9

ELEMENT ASSEMBLY PRIMARY 8

W17/MPT/EE 466119120900 ELEMENT ASSEMBLY PRIMARY 8

5 pieces Delivery: 15 days
#10

FLEXIBLE PIPE AXLE TO OUTSIDE

W17/MPT/EE 906910978500 FLEXIBLE PIPE AXLE TO OUTSIDE

2 pieces Delivery: 15 days
#11

HYD HOSE FROM QRC TO MTG FRAME

W17/MPT/EE 480096502300 HYD HOSE FROM QRC TO MTG FRAME

2 pieces Delivery: 15 days
#12

ALTERNATOR ASSY

W17/MPT/EE 424619119900 ALTERNATOR ASSY

1 pieces Delivery: 15 days
#13

FLEXIBLE PIPE AXLE TO AXLE

W17/MPT/EE 906910978600 FLEXIBLE PIPE AXLE TO AXLE

2 pieces Delivery: 15 days
#14

OIL SEAL KIT 49101

W17/MPT/EE 499151124200 OIL SEAL KIT 49101

1 pieces Delivery: 15 days
#15

BULB HEAD LIGHT FRONT 12V 60 55W

W17/MPT/EE 487682420500 BULB HEAD LIGHT FRONT 12V 60 55W

18 pieces Delivery: 15 days
#16

HYD HOSE BUCKET CYL

W17/MPT/EE 480096502500 HYD HOSE BUCKET CYL

2 pieces Delivery: 15 days
#17

HYD HOSE LOADER CYL

W17/MPT/EE 480096502400 HYD HOSE LOADER CYL

2 pieces Delivery: 15 days
#18

BEARING 104746

W17/MPT/EE 487621120300 BEARING 104746

2 pieces Delivery: 15 days
#19

PRIMARY FUEL FILTER

W17/MPT/EE 424618420600 PRIMARY FUEL FILTER

15 pieces Delivery: 15 days
#20

SENSOR 643172

W17/MPT/EE 499135234200 SENSOR 643172

2 pieces Delivery: 15 days
#21

PLOUGH BOLT 3 4UN2B L 70MM

W17/MPT/EE 200526419900 PLOUGH BOLT 3 4UN2B L 70MM

15 pieces Delivery: 15 days
#22

BEARING 27659

W17/MPT/EE 499142124000 BEARING 27659

2 pieces Delivery: 15 days
#23

HARD BUSH LINER 55X40X42

W17/MPT/EE 480096501500 HARD BUSH LINER 55X40X42

4 pieces Delivery: 15 days
#24

BULB PARKING LIGHT FRONT 12V 5W

W17/MPT/EE 487682420000 BULB PARKING LIGHT FRONT 12V 5W

35 pieces Delivery: 15 days
#25

BRAKE COUNTER PLATE 117167

W17/MPT/EE 499171120400 BRAKE COUNTER PLATE 117167

6 pieces Delivery: 15 days
#26

IGNITION SWITCH 75 90

W17/MPT/EE 487691420400 IGNITION SWITCH 75 90

6 pieces Delivery: 15 days
#27

THERMOSTAT ASSY

W17/MPT/EE 424616120000 THERMOSTAT ASSY

2 pieces Delivery: 15 days
#28

BULB BRAKE LIGHT REAR 12V 21W

W17/MPT/EE 487682420100 BULB BRAKE LIGHT REAR 12V 21W

25 pieces Delivery: 15 days
#29

HARD BUSH LINER 45X35X30

W17/MPT/EE 480096501600 HARD BUSH LINER 45X35X30

4 pieces Delivery: 15 days
#30

MAIN OIL SEAL REAR COVER

W17/MPT/EE 424611120200 MAIN OIL SEAL REAR COVER

2 pieces Delivery: 15 days
#31

PIN DIA 35X155X183 WITH GREASE NIPPLE

W17/MPT/EE 480096501200 PIN DIA 35X155X183 WITH GREASE NIPPLE

2 pieces Delivery: 15 days
#32

BULB FOG LIGHT

W17/MPT/EE 487682420400 BULB FOG LIGHT

18 pieces Delivery: 15 days
#33

CLUTCH WIRE FLEXIBLE 75 HP

W17/MPT/EE 487674321100 CLUTCH WIRE FLEXIBLE 75 HP

2 pieces Delivery: 15 days
Advertisement

Categories 55

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Audited Financial Statements or CA Certificate showing turnover

4

Experience Certificates for similar supply (military/defense preferred)

5

EMD/Security Deposit documentation (as applicable by buyer)

6

Technical bid documents showing compliance with Drawings approvals

7

OEM Authorization / Manufacturer registration (where applicable)

8

End User Certificate in Buyer’s format

Frequently Asked Questions

How to participate in Indian Army brake disc tender 2026 in defense procurement

Bidders must submit GST registration, PAN, and audited turnover evidence for last 3 years, plus OEM authorizations if required. Prepare Detailed Design Drawings within 5 days of award and await Buyer approval. Ensure compliance with IS/standards applicable to spares and confirm EMD as per tender terms.

What documents are required for Indian Army spares tender submission 2026

Required documents include GST certificate, PAN, audited financial statements or CA certificate, experience certificates for similar supply, OEM authorization, End User Certificate in Buyer format, and technical bid detailing drawings and conformity with BOQ item concepts.

What are the delivery terms and quantity variation in this army procurement

Quantity can increase up to 25% at contract, with delivery time adjusted by (additional quantity/original quantity) × original period, minimum 30 days. Delivery commences from the last date of the original delivery order; extensions may be allowed during extended period.

Which standards or certifications are required for Indian Army hydraulic spares

While specific standards are not listed here, bidders should ensure items meet military grade reliability, provide OEM or IS/DEF standards documentation, and supply End User Certificates. Turnover and OEM turnover criteria must be demonstrated for eligibility.

When is the approval for Detailed Design Drawings required in this tender

Detailed Design Drawings must be submitted within 5 days of award; Buyer will approve or provide modification list within 5 days; delays in approval may shift delivery timelines accordingly without LD penalties.

What are the payment terms for the Indian Army spares supply contract

Payments align with standard government terms; bidder bears GST; reimbursement is as per actual GST or applicable rate; End User Certificate formats are used; schedule depends on contract terms and delivery milestones tied to approved drawings.

What is required to prove bidder eligibility for defense spares procurement

Provide minimum three years of relevant turnover, proof of last three years financials, experience certificates for similar supply, OEM authorization if required, and ensure compliance with drawing approvals and End User Certificate requirements.

How to verify OEM turnover criteria for this procurement

Submit Audited Balance Sheets or CA/CMA certificates showing average annual turnover for last three financial years; ensure OEM's financials meet the specified threshold and provide manufacturer authorization for offered components.

Advertisement