Organization: Odisha Primary Education Program Authority (opepa), Bhubaneswar. Procurement: Off-Grid Solar Photovoltaic Power Plant (V2) for MALKANGIRI, Odisha 764044. Scope: Supply, Installation, Testing, Commissioning, Training of operators, and statutory clearances. EMD: ₹440,000. Variation rights: up to 25% quantity increase/decrease; extended delivery period rules apply. Manufacturer Authorization required where applicable, with OEM details. Turnover: minimum average turnover over last 3 years as per bid; audited statements or CA certificate to be uploaded. Inspection: Pre-dispatch and post-delivery inspections may be conducted. Past Experience: relevant project documents accepted as proof. The absence of BOQ items indicates a framework/turnkey approach and variable scope.
Product: Off-Grid Solar PV Power Plant (V2)
Category: Solar photovoltaic system with turnkey scope
Quantity: Not specified in BOQ; subject to 25% variation
EMD: ₹440,000
Standards/Certifications: OEM authorization; inspection rights; compliance with bid terms
Delivery: Periods governed by original delivery date and extended periods with minimum 30 days
EMD of ₹440,000; submission as per bid terms with appropriate payment method.
Quantity variation up to ±25% at contract, with extension rules tied to original delivery period.
OEM authorization required; pre-dispatch and post-receipt inspections may be conducted by nominated IA.
EMD ₹440,000; payment terms aligned with supply, installation, testing, commissioning milestones as per contract (not fully specified).
Delivery period must start from last date of original delivery order; quantity variations permissible up to 25% with extended period rules.
Not explicitly stated; potential penalties may apply in line with standard govt procurement practices; bidders should seek clarification.
Last 3 years of average turnover meeting bid criteria with audited statements or CA certificate
OEM/Original Equipment Manufacturer authorization or authorized distributor certificate
Experience in supply/installation of off-grid solar PV systems or similar turnkey solar projects
Quantity
123
Category
Off - Grid Solar Photovoltaic (PV) Power Plant (V2)
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
110
OEM Avg. Turnover
880
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Off - Grid Solar Photovoltaic (PV) Power Plant (V2) (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Malkangiri
Delivery Pincodes
764048
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Satyabrata Mishra | 764048,DISTRICT PROJECT OFFICE SAMAGRA SHIKSHA, MALKANGIRI Near DISTRICT COURT, MALKANGIRI | Malkangiri | Odisha | 764048 | 51 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate showing turnover for last 3 years
OEM authorization/Distributor authorization form with contact details
Past project experience proofs (similar solar PV installations)
Technical bid documents and compliance certificates
Pre-Dispatch/Inspection documentation (if selected)
Any statutory clearances required for solar PV installation (if applicable)
Key insights about ODISHA tender market
Bidders must submit OEM authorization, GST, PAN, and 3-year turnover evidence (audited or CA certificate). Include EMD ₹4,40,000 and detailed technical bid with installation, testing, commissioning scope, and operator training. Ensure capability for pre/post-dispatch inspection and compliance with variation rights up to 25%.
Required documents include GST registration, PAN card, audited financials or CA turnover certificate, OEM/distributor authorization, prior solar PV installation proofs, technical bid, and any statutory clearances. Upload inspection plans if pre-dispatch inspection is chosen and maintain proper bidder eligibility.
The EMD is ₹4,40,000. Submit via the prescribed method with your bid. Ensure the EMD is valid for the bid validity period and is in the form required by the tender terms (DD/online as applicable).
Delivery starts from the last date of the original delivery order, with option to increase/decrease quantity up to 25%. If extended, the time is calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days, with potential extension up to the original period.
Acceptable proofs include prior solar PV installations, turnkey project deliveries, and commissioning experience. Upload project details with client names, scope, capacity, and completion dates to demonstrate capability to handle supply-installation-testing-commissioning and training.
Not mandatory but may be conducted if ATC requires it. The agency can perform pre-dispatch inspection at seller premises and/or post-receipt inspection at the consignee site to verify quality and quantity before acceptance.
The bidder must show the minimum average annual turnover for the last 3 years ending 31st March of the previous financial year, with audited balance sheets or CA certificate detailing turnover figures; if the bidder is under 3 years old, turnover is calculated from the date of incorporation.
Bid submissions must include an OEM authorization/distributor certificate with details: name, designation, address, email, and phone. This ensures the bidder can supply and service the off-grid PV system in Odisha as per contract terms.