TenderDekho Logo
Active GEM

Indian Army Rotational Moulded Polyethylene Water Storage Tanks & IS 12701 Fittings Tender Visakhapatnam 2026

Bid Publish Date

08-Sep-2026, 6:27 pm

Bid End Date

18-Sep-2026, 7:00 pm

Progress

Issue08-Sep-2026, 6:27 pm
AwardPending

Key Highlights

  • OEM authorization on OEM letterhead quoting current bid number
  • OEM warranty certificates on OEM letterhead with warranty periods
  • MIICert from OEMs detailing local content under Make in India orders
  • Past performance evidence via GeM contracts and CRACs for last 3 years

Tender Overview

The Indian Army, Department of Military Affairs, invites bids for Rotational Moulded Polyethylene Water Storage Tanks (V3) conforming to IS 12701, Waste Fittings for Washbasin and Sinks per IS 2963, and Copper Alloy Gate Valves for Waterworks per IS 778, for use in Visakhapatnam, Andhra Pradesh. The procurement involves hardware components across water storage and distribution, with emphasis on IS-standard compliance and OEM authorization. The bid requires Make in India content and a matrix of certifications, including ISO 9001. The contract envisions flexible quantity options up to 25% variance and a need for OEM warranty documentation, ensuring vendor alignment with government procurement norms. Unique aspects include compliance with government public procurement preference rules and performance documentation from prior contracts.

Technical Specifications & Requirements

  • Product categories: Rotational Moulded Polyethylene Water Storage Tanks (V3), Waste Fittings for Washbasin and Sinks (IS 2963), Copper Alloy Gate Valve for Waterworks (IS 778)
  • Standards referenced: IS 12701 (tank standard), IS 2963 (fittings), IS 778 (valves)
  • Quality management: ISO 9001 certification for bidder or OEM
  • Documentation: OEM authorization per item, OEM warranty certificates, MIICert with local content, past performance (CRACs) for three years, annual turnover details for last three financial years with CA UDIN
  • Local content: MIICERT indicating class and percentage of local content as per Make in India orders
  • EMD/price terms: Not specified; option clause allows ±25% quantity change; delivery timing anchored to original delivery period with minimum 30 days adjustments

Terms, Conditions & Eligibility

  • EMD: Not specified in terms; ensure bid documents include standard security deposit per agency guidelines
  • Experience: Demonstrated OEM/primary category item experience; three-year performance documentation recommended
  • Delivery: Option clause supports quantity variation; delivery period adjustments with minimum 30 days
  • Payment: Terms not specified; expect standard government terms
  • Documents: PAN, GSTIN, Cancelled cheque, EFT mandate; OEM authorizations; warranty certificates; MIICert; CRACs; CA turnover with UDIN
  • Compliance: ISO 9001 required; BIS/ISI may be implied via IS standards; Make in India content mandatory per policy

Key Specifications

  • Product/service: Rotational Moulded Polyethylene Water Storage Tanks (V3)

  • Standards: IS 12701 for tanks, IS 2963 for waste fittings, IS 778 for copper alloy gate valves

  • Quality: ISO 9001 certification for bidder or OEM

  • Documentation: OEM authorization, warranty certificates, MII content certificates

  • Turnover: last 3 financial years; CA UDIN required

  • Delivery: 25% quantity variation allowed; minimum 30 days extension

  • Testing: technical specifications and test certificates for each quoted item

Terms & Conditions

  • Option clause allows ±25% quantity change at contract placement and during currency

  • Bidders must submit OEM authorizations and warranty certificates on OEM letterhead

  • MIICert showing local content is mandatory under Make in India policies

Important Clauses

Payment Terms

Payment terms not explicitly stated; bidders should expect standard government terms and schedule per contract

Delivery Schedule

Delivery period can be extended by proportional time with a minimum of 30 days; additional time calculated as (increased quantity / original quantity) × original delivery period

Penalties/Liquidated Damages

Penalties not explicitly detailed; typical DAM terms may apply for late delivery per contract

Bidder Eligibility

  • OEM authorization for each quoted item on OEM letterhead

  • ISO 9001 certification for bidder or OEM

  • MII/MIICert showing local content as per Make in India policy

  • Past performance documentation (GeM orders and CRACs) for three years

  • CA-verified turnover statements for last 3 financial years with UDIN

Tender Data

Bid Details

Quantity

527

Category

Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

OEM Avg. Turnover

3

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) , Waste Fittings for Washbasin and Sinks as per IS 2963 (Q3) , Copper Alloy Gate Valve For Waterworks Purpose (V2) Conforming to IS 778 (Q3)

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Visakhapatnam

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-VisakhapatnamVisakhapatnam--1315-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-9788282.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Categories 28

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate certified by bank

5

OEM authorization letters for each item

6

OEM warranty certificates on OEM letterhead

7

MII/MIICert indicating local content

8

Past performance evidence (GeM contracts, CRACs) for last 3 years

9

Annual turnover statements for last 3 financial years with CA UDIN

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for water storage tanks tender in Visakhapatnam

Bidders must submit PAN, GST, Cancelled Cheque, EFT mandate, OEM authorizations, warranty certificates, MIICert with local content, and three-year CRAC-backed performance evidence. Ensure ISO 9001 certification for bidder or OEM and provide turnover with CA UDIN for the last three years. Delivery terms follow option clause up to 25% quantity variation.

What documents are required for the Army water fittings bid in Andhra Pradesh

Submit PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization on OEM letterhead, OEM warranty certificates, MIICert, past performance CRACs, and three-year turnover verified by CA with UDIN. Include ISO 9001 certificate and item-specific test certificates where applicable.

What standards must be met for IS 12701 tanks and IS 2963 fittings

Tanks must conform to IS 12701 (V3). Waste fittings must comply with IS 2963 (Q3). Copper gate valves must adhere to IS 778 (Q3). Bidders should provide test reports and certification aligning with these standards with the bid submission.

What is the Make in India requirement for this tender

Bidders must upload MIICert indicating class and percentage of local content as required by Make in India orders. Ensure OEM content details are included for all quoted makes and provide OEM certification for compliance with public procurement policy.

What are the delivery terms for quantity variation

The purchaser may increase/decrease quantity by up to 25% at contract placement or during currency. Delivery time extensions are calculated as (Increased quantity / Original quantity) × Original delivery period, with a minimum of 30 days.

What certifications are mandatory for the bidder or OEM

ISO 9001 certification for bidder or OEM is mandatory. OEM authorizations and warranty certificates on OEM letterhead are required for each quoted item, along with MIICert and three-year CRAC-based performance documentation.

What is the scope of the EMD requirement in this tender

The tender terms do not specify an explicit EMD amount. Bidders should prepare standard bid security as per GeM guidelines and the contracting authority’s usual EMD practice, ensuring readiness to provide security deposit if demanded.

How to verify Make in India compliance for quoted items

Submit MIICert from OEM showing local content percentage, include class/percentage per Make in India orders, and provide CRAC-backed past performance demonstrating local sourcing where applicable. Ensure alignment with government preference policies for 2017 and 2020 orders.