A tender has been published for Hindustan Aeronautics Limited (hal) 1 UNIT OF FASTENING-CENTRE SECTION, 2 UNIT OF FASTENING-CENTRE SECTION, 3 INTERNAL BEAM, 4 INTERNAL BEAM, 5 UPPER BEAM, 6 UPPER BEAM, 7 UNIT OF FASTENING CENTERSECTION, 8 UNIT OF FASTENING CENTERSECTION, 9 EXTERNAL BEAM, 10 EXTERNAL BEAM, 11 ATTACHMENT UNIT OF SUSPENSION, 12 ATTACHMENT UNIT OF SUSPENSION, 13 LOWER BEAM OF INTERNAL FRAME 38, 14 LOWER BEAM OF INTERNAL FRAME 38, 15 LATERAL BEAM OF FRAME 38, 16 LATERAL BEAM OF FRAME 38, 17 LATERAL BEAM OF FRAME 38, 18 LATERAL BEAM OF FRAME 38, 19 UPPER BEAM, 20 UPPER BEAM, 21 UPPER BEAM, 22 UPPER BEAM, 23 FASTENING BEAM OF VERTICAL TAIL ASS, 24 FASTENING BEAM OF VERTICAL TAIL ASS, 25 UPPER BEAM OF FRAME 42, 26 UPPER BEAM OF FRAME 42, 27 INTERNAL BEAM, 28 INTERNAL BEAM, 29 LOWER BEAM OF FRAME 42, 30 LOWER BEAM OF FRAME 42, 31 LOWER BEAM OF INTERNAL FRAME 42, 32 LOWER BEAM OF INTERNAL FRAME 42, 33 EXTERNAL BEAM OF FRAME 42, 34 EXTERNAL BEAM OF FRAME 42, 35 LATERAL BEAM OF FRAME N42, 36 LATERAL BEAM OF FRAME N42, 37 ATTACHMENT UNIT OF HINGED ARCH, 38 ATTACHMENT UNIT OF HINGED ARCH, 39 LATERAL ARCH OF FRAME N45, 40 LATERAL ARCH OF FRAME N45, 41 UPPER ARCH, 42 UPPER ARCH, 43 EXTERNAL ARCH, 44 EXTERNAL ARCH, 45 INTERNAL ARCH, 46 INTERNAL ARCH, 47 NIPPLE, 48 LATERAL BEAM OF FRAME38, 49 LATERAL BEAM OF FRAME38, 50 LOWER ARC OF FRAME 1, 51 PANEL OF FRAME 16, 52 FRAME, 53 FRONT PANEL, 54 REAR PANEL, 55 REAR PANEL, 56 LOWER EXTERNAL LONGERON, 57 LOWER EXTERNAL LONGERON, 58 LOWER INTERNAL LONGERON, 59 LOWER INTERNAL LONGERON, 60 PLATE, 61 PANEL, 62 PANEL, 63 HATCH COVER BETWEEN THE WALLS 2, 64 HATCH COVER BETWEEN THE WALLS 2, 65 PROFILE, 66 PROFILE, 67 LONGERON FLANGE, 68 LONGERON FLANGE, 69 FITTING, 70 WALL N1, 71 WALL N1, 72 WALL N1 END PART, 73 WALL N1 END PART, 74 RIB N20, 75 RIB N20, 76 REAR WALL, 77 REAR WALL, 78 CONNECTING ELBOW, 79 CONNECTING ELBOW, 80 UPPER PANEL, 81 UPPER PANEL, 82 FRAME N25, 83 UPPER ARC OF FRAME 1, 84 WALL OF FRONT SUPPORT BAY LH, 85 BEAM, 86 CENTRAL PANEL OF FLOOR OF 1st COCKP, 87 CENTRAL PANEL OF FLOOR OF SECOND CO, 88 FRAME 1N, 89 FRAME 2N, 90 LOWER PANEL OF MIDDLE COMPARTMENT, 91 BASE OF FRAME NO34, 92 BASE OF FRAME NO34, 93 PANEL OF REAR WALL OF FIRST COCKPIT, 94 PANEL OF REAR WALL OF SECOND COCKPI, 95 WALL 1, 96 WALL N2, 97 WALL N3 END PART, 98 WALL N3 END PART, 99 LATERAL PANEL, 100 LATERAL PANEL, 101 WALL N3 in NASHIK, MAHARASHTRA. Quantity: 1605 by. Submission Deadline: 20-08-2026 19: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

1605

Category

1 UNIT OF FASTENING-CENTRE SECTION

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

1 UNIT OF FASTENING-CENTRE SECTION , 2 UNIT OF FASTENING-CENTRE SECTION , 3 INTERNAL BEAM , 4 INTERNAL BEAM , 5 UPPER BEAM , 6 UPPER BEAM , 7 UNIT OF FASTENING CENTERSECTION , 8 UNIT OF FASTENING CENTERSECTION , 9 EXTERNAL BEAM , 10 EXTERNAL BEAM , 11 ATTACHMENT UNIT OF SUSPENSION , 12 ATTACHMENT UNIT OF SUSPENSION , 13 LOWER BEAM OF INTERNAL FRAME 38 , 14 LOWER BEAM OF INTERNAL FRAME 38 , 15 LATERAL BEAM OF FRAME 38 , 16 LATERAL BEAM OF FRAME 38 , 17 LATERAL BEAM OF FRAME 38 , 18 LATERAL BEAM OF FRAME 38 , 19 UPPER BEAM , 20 UPPER BEAM , 21 UPPER BEAM , 22 UPPER BEAM , 23 FASTENING BEAM OF VERTICAL TAIL ASS , 24 FASTENING BEAM OF VERTICAL TAIL ASS , 25 UPPER BEAM OF FRAME 42 , 26 UPPER BEAM OF FRAME 42 , 27 INTERNAL BEAM , 28 INTERNAL BEAM , 29 LOWER BEAM OF FRAME 42 , 30 LOWER BEAM OF FRAME 42 , 31 LOWER BEAM OF INTERNAL FRAME 42 , 32 LOWER BEAM OF INTERNAL FRAME 42 , 33 EXTERNAL BEAM OF FRAME 42 , 34 EXTERNAL BEAM OF FRAME 42 , 35 LATERAL BEAM OF FRAME N42 , 36 LATERAL BEAM OF FRAME N42 , 37 ATTACHMENT UNIT OF HINGED ARCH , 38 ATTACHMENT UNIT OF HINGED ARCH , 39 LATERAL ARCH OF FRAME N45 , 40 LATERAL ARCH OF FRAME N45 , 41 UPPER ARCH , 42 UPPER ARCH , 43 EXTERNAL ARCH , 44 EXTERNAL ARCH , 45 INTERNAL ARCH , 46 INTERNAL ARCH , 47 NIPPLE , 48 LATERAL BEAM OF FRAME38 , 49 LATERAL BEAM OF FRAME38 , 50 LOWER ARC OF FRAME 1 , 51 PANEL OF FRAME 16 , 52 FRAME , 53 FRONT PANEL , 54 REAR PANEL , 55 REAR PANEL , 56 LOWER EXTERNAL LONGERON , 57 LOWER EXTERNAL LONGERON , 58 LOWER INTERNAL LONGERON , 59 LOWER INTERNAL LONGERON , 60 PLATE , 61 PANEL , 62 PANEL , 63 HATCH COVER BETWEEN THE WALLS 2 , 64 HATCH COVER BETWEEN THE WALLS 2 , 65 PROFILE , 66 PROFILE , 67 LONGERON FLANGE , 68 LONGERON FLANGE , 69 FITTING , 70 WALL N1 , 71 WALL N1 , 72 WALL N1 END PART , 73 WALL N1 END PART , 74 RIB N20 , 75 RIB N20 , 76 REAR WALL , 77 REAR WALL , 78 CONNECTING ELBOW , 79 CONNECTING ELBOW , 80 UPPER PANEL , 81 UPPER PANEL , 82 FRAME N25 , 83 UPPER ARC OF FRAME 1 , 84 WALL OF FRONT SUPPORT BAY LH , 85 BEAM , 86 CENTRAL PANEL OF FLOOR OF 1st COCKP , 87 CENTRAL PANEL OF FLOOR OF SECOND CO , 88 FRAME 1N , 89 FRAME 2N , 90 LOWER PANEL OF MIDDLE COMPARTMENT , 91 BASE OF FRAME NO34 , 92 BASE OF FRAME NO34 , 93 PANEL OF REAR WALL OF FIRST COCKPIT , 94 PANEL OF REAR WALL OF SECOND COCKPI , 95 WALL 1 , 96 WALL N2 , 97 WALL N3 END PART , 98 WALL N3 END PART , 99 LATERAL PANEL , 100 LATERAL PANEL , 101 WALL N3

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9569553.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 101 Items Sign in for GEM prices

#1

1 UNIT OF FASTENING-CENTRE SECTION

11.0631.3.002.003

15 nos Delivery: 300 days
#2

2 UNIT OF FASTENING-CENTRE SECTION

11.0631.3.002.004

15 nos Delivery: 300 days
#3

3 INTERNAL BEAM

11.0631.3.004.001

15 nos Delivery: 300 days
#4

4 INTERNAL BEAM

11.0631.3.004.002

15 nos Delivery: 300 days
#5

5 UPPER BEAM

11.0631.3.006.001

15 nos Delivery: 300 days
#6

6 UPPER BEAM

11.0631.3.006.002

15 nos Delivery: 300 days
#7

7 UNIT OF FASTENING CENTERSECTION

11.0631.7.001.003

15 nos Delivery: 300 days
#8

8 UNIT OF FASTENING CENTERSECTION

11.0631.7.001.004

15 nos Delivery: 300 days
#9

9 EXTERNAL BEAM

11.0631.7.003.001

15 nos Delivery: 300 days
#10

10 EXTERNAL BEAM

11.0631.7.003.002

15 nos Delivery: 300 days
#11

11 ATTACHMENT UNIT OF SUSPENSION

11.0631.7.008.001

15 nos Delivery: 300 days
#12

12 ATTACHMENT UNIT OF SUSPENSION

11.0631.7.008.002

15 nos Delivery: 300 days
#13

13 LOWER BEAM OF INTERNAL FRAME 38

11.0638.3.804.001

15 nos Delivery: 300 days
#14

14 LOWER BEAM OF INTERNAL FRAME 38

11.0638.3.804.002

15 nos Delivery: 300 days
#15

15 LATERAL BEAM OF FRAME 38

11.0638.3.806.001

15 nos Delivery: 300 days
#16

16 LATERAL BEAM OF FRAME 38

11.0638.3.806.002

15 nos Delivery: 300 days
#17

17 LATERAL BEAM OF FRAME 38

11.0638.3.807.001

15 nos Delivery: 300 days
#18

18 LATERAL BEAM OF FRAME 38

11.0638.3.807.002

15 nos Delivery: 300 days
#19

19 UPPER BEAM

11.0638.3.826.001

15 nos Delivery: 300 days
#20

20 UPPER BEAM

11.0638.3.826.002

15 nos Delivery: 300 days
#21

21 UPPER BEAM

11.0638.3.827.001

15 nos Delivery: 300 days
#22

22 UPPER BEAM

11.0638.3.827.002

15 nos Delivery: 300 days
#23

23 FASTENING BEAM OF VERTICAL TAIL ASS

11.0638.I.821.001

15 nos Delivery: 300 days
#24

24 FASTENING BEAM OF VERTICAL TAIL ASS

11.0638.I.821.002

15 nos Delivery: 300 days
#25

25 UPPER BEAM OF FRAME 42

11.0642.3.001.001

15 nos Delivery: 300 days
#26

26 UPPER BEAM OF FRAME 42

11.0642.3.001.002

15 nos Delivery: 300 days
#27

27 INTERNAL BEAM

11.0642.3.003.001

15 nos Delivery: 300 days
#28

28 INTERNAL BEAM

11.0642.3.003.002

15 nos Delivery: 300 days
#29

29 LOWER BEAM OF FRAME 42

11.0642.3.004.001

15 nos Delivery: 300 days
#30

30 LOWER BEAM OF FRAME 42

11.0642.3.004.002

15 nos Delivery: 300 days
#31

31 LOWER BEAM OF INTERNAL FRAME 42

11.0642.3.006.001

15 nos Delivery: 300 days
#32

32 LOWER BEAM OF INTERNAL FRAME 42

11.0642.3.006.002

15 nos Delivery: 300 days
#33

33 EXTERNAL BEAM OF FRAME 42

11.0642.3.803.003

15 nos Delivery: 300 days
#34

34 EXTERNAL BEAM OF FRAME 42

11.0642.3.803.004

15 nos Delivery: 300 days
#35

35 LATERAL BEAM OF FRAME N42

11.0642.I.911.003

15 nos Delivery: 300 days
#36

36 LATERAL BEAM OF FRAME N42

11.0642.I.911.004

15 nos Delivery: 300 days
#37

37 ATTACHMENT UNIT OF HINGED ARCH

11.0645.3.003.001

15 nos Delivery: 300 days
#38

38 ATTACHMENT UNIT OF HINGED ARCH

11.0645.3.003.002

15 nos Delivery: 300 days
#39

39 LATERAL ARCH OF FRAME N45

11.0645.3.004.003

15 nos Delivery: 300 days
#40

40 LATERAL ARCH OF FRAME N45

11.0645.3.004.004

15 nos Delivery: 300 days
#41

41 UPPER ARCH

11.0645.3.809.001

15 nos Delivery: 300 days
#42

42 UPPER ARCH

11.0645.3.809.002

15 nos Delivery: 300 days
#43

43 EXTERNAL ARCH

11.0645.3.817.001

15 nos Delivery: 300 days
#44

44 EXTERNAL ARCH

11.0645.3.817.002

15 nos Delivery: 300 days
#45

45 INTERNAL ARCH

11.0645.3.821.001

15 nos Delivery: 300 days
#46

46 INTERNAL ARCH

11.0645.3.821.002

15 nos Delivery: 300 days
#47

47 NIPPLE

30.5300.0001.011

60 nos Delivery: 300 days
#48

48 LATERAL BEAM OF FRAME38

E10.0638.I003.001

15 nos Delivery: 300 days
#49

49 LATERAL BEAM OF FRAME38

E10.0638.I003.002

15 nos Delivery: 300 days
#50

50 LOWER ARC OF FRAME 1

11.0201.1.802.900

15 nos Delivery: 300 days
#51

51 PANEL OF FRAME 16

11.0216.I.001.900

15 nos Delivery: 300 days
#52

52 FRAME

11.0240.4.801.900

15 nos Delivery: 300 days
#53

53 FRONT PANEL

11.0446.0.021.900

30 nos Delivery: 300 days
#54

54 REAR PANEL

11.0446.3.051.003

15 nos Delivery: 300 days
#55

55 REAR PANEL

11.0446.3.051.004

15 nos Delivery: 300 days
#56

56 LOWER EXTERNAL LONGERON

11.0610.3.801.001

15 nos Delivery: 300 days
#57

57 LOWER EXTERNAL LONGERON

11.0610.3.801.002

15 nos Delivery: 300 days
#58

58 LOWER INTERNAL LONGERON

11.0610.3.802.001

15 nos Delivery: 300 days
#59

59 LOWER INTERNAL LONGERON

11.0610.3.802.002

15 nos Delivery: 300 days
#60

60 PLATE

11.0620.3.559.900

15 nos Delivery: 300 days
#61

61 PANEL

11.0620.I.551.001

15 nos Delivery: 300 days
#62

62 PANEL

11.0620.I.551.002

15 nos Delivery: 300 days
#63

63 HATCH COVER BETWEEN THE WALLS 2

11.1000.4.121.001

15 nos Delivery: 300 days
#64

64 HATCH COVER BETWEEN THE WALLS 2

11.1000.4.121.002

15 nos Delivery: 300 days
#65

65 PROFILE

11.1003.I.108.001

15 nos Delivery: 300 days
#66

66 PROFILE

11.1003.I.108.002

15 nos Delivery: 300 days
#67

67 LONGERON FLANGE

11.1106.4.151.001

15 nos Delivery: 300 days
#68

68 LONGERON FLANGE

11.1106.4.151.002

15 nos Delivery: 300 days
#69

69 FITTING

11.1118.4.301.900

15 nos Delivery: 300 days
#70

70 WALL N1

11.2000.2.105.001

15 nos Delivery: 300 days
#71

71 WALL N1

11.2000.2.105.002

15 nos Delivery: 300 days
#72

72 WALL N1 END PART

11.2000.2.140.001

15 nos Delivery: 300 days
#73

73 WALL N1 END PART

11.2000.2.140.002

15 nos Delivery: 300 days
#74

74 RIB N20

11.2000.2.411.001

15 nos Delivery: 300 days
#75

75 RIB N20

11.2000.2.411.002

15 nos Delivery: 300 days
#76

76 REAR WALL

11.2030.I.005.001

15 nos Delivery: 300 days
#77

77 REAR WALL

11.2030.I.005.002

15 nos Delivery: 300 days
#78

78 CONNECTING ELBOW

11.3423.I.529.001

30 nos Delivery: 300 days
#79

79 CONNECTING ELBOW

11.3423.I.529.002

30 nos Delivery: 300 days
#80

80 UPPER PANEL

E10.0620.I804.001

15 nos Delivery: 300 days
#81

81 UPPER PANEL

E10.0620.I804.002

15 nos Delivery: 300 days
#82

82 FRAME N25

E10.1125.I101.900

15 nos Delivery: 300 days
#83

83 UPPER ARC OF FRAME 1

11.0201.1.801.900

15 nos Delivery: 300 days
#84

84 WALL OF FRONT SUPPORT BAY LH

11.0230.I.001.900

15 nos Delivery: 300 days
#85

85 BEAM

11.0230.I.805.001

15 nos Delivery: 300 days
#86

86 CENTRAL PANEL OF FLOOR OF 1st COCKP

11.0235.4.804.005

15 nos Delivery: 300 days
#87

87 CENTRAL PANEL OF FLOOR OF SECOND CO

11.0235.I.021.900

15 nos Delivery: 300 days
#88

88 FRAME 1N

11.0247.I.001.003

15 nos Delivery: 300 days
#89

89 FRAME 2N

11.0247.I.002.900

15 nos Delivery: 300 days
#90

90 LOWER PANEL OF MIDDLE COMPARTMENT

11.0620.I.515.001

15 nos Delivery: 300 days
#91

91 BASE OF FRAME NO34

11.0634.7.008.001

15 nos Delivery: 300 days
#92

92 BASE OF FRAME NO34

11.0634.7.008.002

15 nos Delivery: 300 days
#93

93 PANEL OF REAR WALL OF FIRST COCKPIT

11.0790.4.008.003

15 nos Delivery: 300 days
#94

94 PANEL OF REAR WALL OF SECOND COCKPI

11.0790.4.308.005

15 nos Delivery: 300 days
#95

95 WALL 1

11.1001.3.803.007

15 nos Delivery: 300 days
#96

96 WALL N2

11.1002.3.803.005

15 nos Delivery: 300 days
#97

97 WALL N3 END PART

11.2000.I.831.001

15 nos Delivery: 300 days
#98

98 WALL N3 END PART

11.2000.I.831.002

15 nos Delivery: 300 days
#99

99 LATERAL PANEL

E10.0620.I887.001

15 nos Delivery: 300 days
#100

100 LATERAL PANEL

E10.0620.I887.002

15 nos Delivery: 300 days
#101

101 WALL N3

E10.1003.I803.900

15 nos Delivery: 300 days

Categories 7

Corrigendum Updates

6 Updates
#1

Update

12-Aug-2026

Extended Deadline

18-Aug-2026, 11:30 am

Opening Date

18-Aug-2026, 12:00 pm

#2

Update

07-Aug-2026

Extended Deadline

11-Aug-2026, 11:30 am

Opening Date

11-Aug-2026, 12:00 pm

#3

Update

06-Aug-2026

Extended Deadline

07-Aug-2026, 11:30 am

Opening Date

07-Aug-2026, 12:00 pm

#4

Update

05-Aug-2026

Extended Deadline

06-Aug-2026, 11:30 am

Opening Date

06-Aug-2026, 12:00 pm

#5

Update

04-Aug-2026

Extended Deadline

05-Aug-2026, 11:30 am

Opening Date

05-Aug-2026, 12:00 pm

#6

Update

27-Jul-2026

Extended Deadline

04-Aug-2026, 11:30 am

Opening Date

04-Aug-2026, 12:00 pm

Required Documents

1

Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

2

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer