Bid Publish Date
02-Sep-2026, 8:48 am
Bid End Date
12-Sep-2026, 9:00 am
Location
Progress
Muzaffarpur District Panchayats (Department of Panchayati Raj) seeks procurement of an RO Plant with Genset and Trolley. The contract covers both the complete unit and spare parts warranty, with flexibility to adjust quantity up to 25% of bid quantity during and after award. Key process steps include submission of Detailed Design Drawings within 7 days of award, and approval or list of modifications provided by the Buyer within a further 7 days. Delivery/installation occurs at the Buyer’s specified address, with pre-dispatch inspection at Seller premises. This tender requires strict adherence to Buyer’s quantity and design approval timelines, and allows post-award adjustments while preserving contracted rates.
RO water plant with integrated Genset and trolley configuration
Warranty on spare parts and whole items supplied
7-day design drawing submission and approval window
Pre-dispatch inspection by Buyer or designated agency
Delivery and installation at Buyer-provided address
Quantity adjustment up to 25% of bid quantity during contract
Mandatory design drawing approvals within 7 days of award
Pre-dispatch inspection charges borne by Buyer; in-house testing by Seller free
Delivery/installation subject to approved drawings and Buyer address
Not specified in provided data; ensure to verify with issuing agency during bid submission
Delivery period adjustments based on option clause; minimum extension 30 days when increasing quantity
Not specified in provided data; confirm LD terms in final contract
Not under liquidation, court receivership or similar proceedings
Financial standing demonstrated via documents
Authorized to supply RO plant with Genset and trolley and provide OEM support
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
110 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
15
Past Performance
80 %
Warranty Period
1 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
RO Plant with Genset and Trolley (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Muzaffarpur
Delivery Pincodes
843113
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shashi Bhushan Kumar | 843113,LADAURA,KUDHANI,MU ZAFFARPUR | Muzaffarpur | Bihar | 843113 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates of similar RO plant supply or water treatment equipment
Financial statements or solvency certificate
EMD/Security deposit documentation (as applicable per tender terms)
Technical bid and compliance certificates
OEM authorization or authorized dealer certificate for RO plant and genset
Proof of non-liquidation/ bankruptcy status
| Category | Specification | Requirement |
|---|---|---|
| Warranty/Services | Warranty on spare parts | 12, 18, 24 Or higher |
| Warranty/Services | Warranty on whole items supplied | 1, 2, 3, 4, 5 Or higher |
Key insights about BIHAR tender market
Bidders must submit a complete technical bid with OEM authorizations, GST, PAN, and financial statements. Ensure the RO plant with Genset meets warranty on spare parts and entire unit, and include Detailed Design Drawings within 7 days of award. Pre-dispatch inspection arrangements are Buyer-borne, so plan for inspection readiness.
Required documents include GST registration, PAN, experience certificates for similar projects, financial statements, EMD documentation, technical bid, OEM authorizations, and proof of non-liquidation. Ensure pre-dispatch inspection clauses are acknowledged and that warranty terms cover both spare parts and entire system.
Submit Detailed Design Drawings within 7 days of award. The Buyer will approve or provide a modification list within another 7 days. All subsequent fabrication must align to the approved drawings to avoid schedule shifts and potential LDs.
The purchaser may adjust quantity by up to 25% of bid quantity during contract execution. If increased, the delivery period is recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days unless the original period already exceeds 30 days.
Warranty coverage includes both spare parts and the whole item supplied. Exact warranty duration is not specified in the data; bidders must confirm the period during contract negotiation and ensure post-warranty support and replacement parts availability.
Pre-dispatch inspection will be conducted at the Seller premises; the Buyer or their representative and possibly an External Inspection Agency may participate. Inspection charges are borne by the Buyer, while the Seller provides in-house testing facilities at no cost.
External inspection charges and any laboratory testing costs are borne by the Buyer. In-house testing facilities at the Seller premises are provided free of cost to ensure contract compliance before dispatch.
Delivery and installation are to be performed at the Buyer-provided address. Exact site details are to be supplied by the Buyer. Any delays due to design approval should adjust the delivery timeline per the option clause while avoiding LDs if delays are Buyer-caused.