Bid Publish Date
02-Sep-2026, 1:00 pm
Bid End Date
23-Sep-2026, 1:00 pm
EMD
₹1,14,000
Location
Progress
Indian Army invites bids for Installation System Testing Transportation, Outdoor Full HD Day and Night PTZ IP Camera, Camera Mounting Bracket Heavy Duty GI, Camera Junction Box Weatherproof, Spike buster 4 port, Camera Pole GI 6 Mtr with stair provision, PVC Pipe Heavy Duty, PVC Box 3x3, LED Light 50W IP66, Solar Panel, GI Pole for Light 6 Mtr, Pole Foundation RCC, Outdoor JB for Light Termination, OFC 6 Fiber Cable, OFC Joint Closure, OFC LIU 12 Port Loaded, OFC Patch Cord LC- SC, Network Switch 8 Port PoE with SFP Slot, SFP Module Pair, Outdoor UTP Cable, Power Cable 2 Core x 10 sqmm, NVR 32 Channel IP, NVR 16 Channel IP, NVR 08 Channel IP, HDMI Cable 10 Mtr, Surveillance HDD 10 TB, LED TV 75 inch, Wireless Mouse, Network Rack 27 U, 24 Port Network switch SFP Modules in ALWAR, RAJASTHAN. Quantity: 14595. Submission Deadline: 23-09-2026 13: 00: 00. Submit your proposal before the deadline.
Quantity
14595
Category
Installation System Testing Transportation
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
18
OEM Avg. Turnover
40
Past Performance
50 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Installation System Testing Transportation , Outdoor Full HD Day and Night PTZ IP Camera , Camera Mounting Bracket Heavy Duty GI , Camera Junction Box Weatherproof , Spike buster 4 port , Camera Pole GI 6 Mtr with stair provision , PVC Pipe Heavy Duty , PVC Box 3x3 , LED Light 50W IP66 , Solar Panel , GI Pole for Light 6 Mtr , Pole Foundation RCC , Outdoor JB for Light Termination , OFC 6 Fiber Cable , OFC Joint Closure , OFC LIU 12 Port Loaded , OFC Patch Cord LC- SC , Network Switch 8 Port PoE with SFP Slot , SFP Module Pair , Outdoor UTP Cable , Power Cable 2 Core x 10 sqmm , NVR 32 Channel IP , NVR 16 Channel IP , NVR 08 Channel IP , HDMI Cable 10 Mtr , Surveillance HDD 10 TB , LED TV 75 inch , Wireless Mouse , Network Rack 27 U , 24 Port Network switch SFP Modules
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Alwar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Alwar | Alwar | - | - | 1 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Installation System Testing Transportation
As per technical specifications
Outdoor Full HD Day and Night PTZ IP Camera
As per technical specifications
Camera Mounting Bracket Heavy Duty GI
As per technical specifications
Camera Junction Box Weatherproof
As per technical specifications
Spike buster 4 port
As per technical specifications
Camera Pole GI 6 Mtr with stair provision
As per technical specifications
PVC Pipe Heavy Duty
As per technical specifications
PVC Box 3x3
As per technical specifications
LED Light 50W IP66
As per technical specifications
Solar Panel
As per technical specifications
GI Pole for Light 6 Mtr
As per technical specifications
Pole Foundation RCC
As per technical specifications
Outdoor JB for Light Termination
As per technical specifications
OFC 6 Fiber Cable
As per technical specifications
OFC Joint Closure
As per technical specifications
OFC LIU 12 Port Loaded
As per technical specifications
OFC Patch Cord LC-SC
As per technical specifications
Network Switch 8 Port PoE with SFP Slot
As per technical specifications
SFP Module Pair
As per technical specifications
Outdoor UTP Cable
As per technical specifications
Power Cable 2 Core x 10 sqmm
As per technical specifications
NVR 32 Channel IP
As per technical specifications
NVR 16 Channel IP
As per technical specifications
NVR 08 Channel IP
As per technical specifications
HDMI Cable 10 Mtr
As per technical specifications
Surveillance HDD 10 TB
As per technical specifications
LED TV 75 inch
As per technical specifications
Wireless Mouse
As per technical specifications
Network Rack 27 U
As per technical specifications
24 Port Network switch SFP Modules
As per technical specifications
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Installation System Testing Transportation | As per technical specifications | 1 | job | pawankumarsinha | 60 | |
| 2 | Outdoor Full HD Day and Night PTZ IP Camera | As per technical specifications | 24 | nos | pawankumarsinha | 60 | |
| 3 | Camera Mounting Bracket Heavy Duty GI | As per technical specifications | 24 | nos | pawankumarsinha | 60 | |
| 4 | Camera Junction Box Weatherproof | As per technical specifications | 24 | nos | pawankumarsinha | 60 | |
| 5 | Spike buster 4 port | As per technical specifications | 24 | nos | pawankumarsinha | 60 | |
| 6 | Camera Pole GI 6 Mtr with stair provision | As per technical specifications | 24 | nos | pawankumarsinha | 60 | |
| 7 | PVC Pipe Heavy Duty | As per technical specifications | 24 | nos | pawankumarsinha | 60 | |
| 8 | PVC Box 3x3 | As per technical specifications | 24 | nos | pawankumarsinha | 60 | |
| 9 | LED Light 50W IP66 | As per technical specifications | 30 | nos | pawankumarsinha | 60 | |
| 10 | Solar Panel | As per technical specifications | 30 | nos | pawankumarsinha | 60 | |
| 11 | GI Pole for Light 6 Mtr | As per technical specifications | 6 | nos | pawankumarsinha | 60 | |
| 12 | Pole Foundation RCC | As per technical specifications | 6 | nos | pawankumarsinha | 60 | |
| 13 | Outdoor JB for Light Termination | As per technical specifications | 30 | nos | pawankumarsinha | 60 | |
| 14 | OFC 6 Fiber Cable | As per technical specifications | 8,700 | mtr | pawankumarsinha | 60 | |
| 15 | OFC Joint Closure | As per technical specifications | 30 | nos | pawankumarsinha | 60 | |
| 16 | OFC LIU 12 Port Loaded | As per technical specifications | 1 | nos | pawankumarsinha | 60 | |
| 17 | OFC Patch Cord LC-SC | As per technical specifications | 25 | nos | pawankumarsinha | 60 | |
| 18 | Network Switch 8 Port PoE with SFP Slot | As per technical specifications | 25 | nos | pawankumarsinha | 60 | |
| 19 | SFP Module Pair | As per technical specifications | 25 | pair | pawankumarsinha | 60 | |
| 20 | Outdoor UTP Cable | As per technical specifications | 5 | roll | pawankumarsinha | 60 | |
| 21 | Power Cable 2 Core x 10 sqmm | As per technical specifications | 5,500 | mtr | pawankumarsinha | 60 | |
| 22 | NVR 32 Channel IP | As per technical specifications | 1 | nos | pawankumarsinha | 60 | |
| 23 | NVR 16 Channel IP | As per technical specifications | 1 | nos | pawankumarsinha | 60 | |
| 24 | NVR 08 Channel IP | As per technical specifications | 2 | nos | pawankumarsinha | 60 | |
| 25 | HDMI Cable 10 Mtr | As per technical specifications | 4 | nos | pawankumarsinha | 60 | |
| 26 | Surveillance HDD 10 TB | As per technical specifications | 1 | nos | pawankumarsinha | 60 | |
| 27 | LED TV 75 inch | As per technical specifications | 1 | nos | pawankumarsinha | 60 | |
| 28 | Wireless Mouse | As per technical specifications | 1 | set | pawankumarsinha | 60 | |
| 29 | Network Rack 27 U | As per technical specifications | 1 | nos | pawankumarsinha | 60 | |
| 30 | 24 Port Network switch SFP Modules | As per technical specifications | 1 | nos | pawankumarsinha | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer