TenderDekho Logo
Active GEM

Indian Army Department Of Military Affairs AC Condenser and Related Components Tender 2026 – ISI/ISO 2026

Bid Publish Date

07-Sep-2026, 6:22 pm

Bid End Date

17-Sep-2026, 7:00 pm

Location

GANDHI NAGAR , GUJARAT

Progress

Issue07-Sep-2026, 6:22 pm
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, is inviting bids for a set of air conditioning related components including AC CONDENSER, ELECTRONIC SPEED SENSOR, SUCTION HOSE ASSY, RUBBER HOSE VACUUM RESERVOIR T CONNECTO, AC COMPRESSOR, AC COOLING COIL, AC PIPE LINE, and AC FILTER. The BOQ lists 7 items, but exact quantities and values are not provided in the tender data. The procurement context centers on spares or replacement parts for military air-conditioning systems. The tender specifies a quantity option of up to 25% increase at contract stage and during the currency of the contract, at contracted rates. A reference to clothing samples is included only in a generic clause and does not appear to apply to these items. Location details are not disclosed in the supplied data.

Technical Specifications & Requirements

  • Product names: AC condenser, electronic speed sensor, suction hose assembly, rubber hose vacuum reservoir T connector, AC compressor, AC cooling coil, AC pipeline set, AC filter
  • Specification availability: No technical specifications provided in the data; bidders should rely on OEM or standard industry specs for military air-conditioning components
  • Standards/Testing: Not specified; no ISI/ISO codes listed in the tender text
  • BOQ/Quantities: 7 total items; exact quantities not disclosed
  • Delivery/Installation: Not defined; delivery timelines referenced only through option clause formula
  • Special clauses: Option to increase quantity up to 25% at contracted rates; delivery period adjustments based on formula

Terms, Conditions & Eligibility

  • Option Clause: Quantity may be increased up to 25% at contract placement and during currency at contracted rates
  • Delivery Time Calculation: Additional delivery time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days
  • Sample Clause: Sample reference samples for clothing/related items; not clearly applicable to these components
  • EMD/Payment: EMD not specified in the data; payment terms not detailed
  • Documentation: Standard procurement documents likely required; GST, PAN, experience and financials typically expected
  • Warranty/Penalties: Not specified in the tender text; no LD or warranty clauses enumerated

Key Specifications

  • Product/service names and categories: AC condenser, electronic speed sensor, suction hose assembly, rubber hose vacuum reservoir T-connector, AC compressor, AC cooling coil, AC pipeline set, AC filter

  • Quantities/volumes: 7 items listed; specific quantities not provided

  • EMD/estimated value: Not specified in tender data

  • Experience requirements: Not specified

  • Quality/compliance terms: Not specified; no standards (IS/ISO) listed

  • Delivery/installation: Not specified; option clause governs delivery adjustments

  • Warranty/AMC: Not specified

Terms & Conditions

  • Quantity fluctuation clause allows up to 25% increase at contract and during currency

  • Delivery period adjusts based on a defined formula with a 30-day minimum

  • No explicit technical standards or EMD values provided; bidders must rely on standard industry specs

Important Clauses

Payment Terms

No explicit payment terms stated; bidders should anticipate standard government procurement payment practices and verify with tender issuing authority

Delivery Schedule

Delivery time scales with option clause; minimum 30 days; calculated as (Increased quantity ÷ Original quantity) × Original delivery period

Penalties/Liquidated Damages

No LD data provided in the tender; bidders should review final contract for LD, penalties, and performance bonds

Bidder Eligibility

  • Demonstrated experience in supplying AC components or related electrical/mechanical equipment to government/military buyers

  • Valid GST registration and PAN card in bidder's name

  • Financial capacity to handle multi-item military procurement with potential 25% quantity augmentation

  • OEM authorization or authorized dealer status for key components (if required by final terms)

Tender Data

Bid Details

Quantity

8

Category

AC CONDENSER

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

AC CONDENSER , ELECTRONIC SPEED SENSOR , SUCTION HOSE ASSY , RUBBER HOSE VACCUM RESERVOIR T CONNECTO , AC COMPRESSOR , AC COOLING COIL , AC PIPE LINE COMP SET AC FILTER

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Gandhi Nagar

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-Gandhi NagarGandhi Nagar--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9859351.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

AC CONDENSER

AC CONDENSER

1 nos Delivery: 15 days
#2

ELECTRONIC SPEED SENSOR

ELECTRONIC SPEED SENSOR

1 nos Delivery: 15 days
#3

SUCTION HOSE ASSY

SUCTION HOSE ASSY

1 nos Delivery: 15 days
#4

RUBBER HOSE VACCUM RESERVOIR T CONNECTO

RUBBER HOSE VACCUM RESERVOIR T CONNECTO

2 nos Delivery: 15 days
#5

AC COMPRESSOR

AC COMPRESSOR

1 nos Delivery: 15 days
#6

AC COOLING COIL

AC COOLING COIL

1 nos Delivery: 15 days
#7

AC PIPE LINE COMP SET AC FILTER

AC PIPE LINE COMP SET AC FILTER

1 nos Delivery: 15 days

Categories 21

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar military/AC components supply

4

Financial statements (audited if available)

5

EMD/Security deposit documentation

6

Technical bid documents demonstrating component compatibility

7

OEM authorizations or dealership/MfR certifications (if applicable)

8

Any prior order completion reports or performance certificates

Frequently Asked Questions

How to bid for Indian Army AC components tender 2026 with 25% quantity option

Bidders should prepare standard bid documents including GST, PAN, financials, and experience certificates. The tender allows a 25% quantity increase at contract and during currency at contracted rates. Ensure OEM authorizations and technical proposals demonstrate compatibility with military AC components and include delivery time planning per the option clause formula.

What documents are required for Indian Army AC components procurement 2026

Submit GST registration, PAN, company financial statements, and EMD documentation. Include experience certificates for similar military supply, OEM authorizations, technical compliance proofs, and any prior performance reports. Ensure all documents align with Buyer Added Terms and Conditions and IS/ISO references if applicable.

What technical specifications exist for AC condenser and sensor in this tender

The data shows no explicit technical specs for these components. Bidders must rely on OEM standard specifications and align with typical military-grade AC components. Verify compatibility with Indian Army vehicles or facilities and prepare technical datasheets with performance, tolerance, and installation requirements.

When is the delivery timeline for quantity adjustments under this Army tender

Delivery timing follows the option clause: additional time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If the original period is shorter than 30 days, the minimum applies. Final delivery windows will be confirmed in contract.

What are the eligibility criteria for bidding on Indian Army AC parts

Eligibility includes demonstrated experience supplying similar components to government/military buyers, valid GST and PAN, adequate financial strength, and potential OEM authorizations. Final terms may require performance history, warranty commitments, and compliance with security/regulatory standards.

What are the expected payment terms and penalties for this Army tender

The tender text does not specify payment terms or liquidated damages. Bidders should await final contract details but prepare for standard government payment terms and potential LD clauses. Ensure clear commitment to warranty and post-delivery support in the technical offer.

How to prepare for OEM authorization in Indian Army AC components bid

Secure manufacturer authorization letters or dealership agreements for key components (condenser, compressor, sensors, hoses, coils). Include product datasheets, certification proof, and warranty terms. Ensure authorization covers the precise models/part numbers intended for Army procurement.